Ōpōtiki Harbour - Regional Investment Opportunities
Opotiki District Council, Eastland Group Ltd & Bay of Plenty Regional CouncilTo build seawalls to create a new entranceway for the Ōpōtiki Harbour, enabling significant aquaculture initiatives.
$95,300,000
approved
$94,750,858 paid
5 jobs
Wai Ariki Hot Springs Spa Construction
Pukeroa Lakefront Holdings LimitedTo construct a Spa and wellness facility on the Rotorua Lakefront that will provide 5-Star wellness orientated spa/bathing services.
$45,000,000
approved
$45,000,000 paid
0Ōpōtiki Mussel Farming and Production Facility - Equity 1
Whakatohea Mussels (Ōpōtiki) LimitedTo build a mussel processing and production facility in Ōpōtiki.
$26,900,127
approved
$26,900,127 paid
36 jobs
Rebuild of Rotorua Museum - Manifesto Contingency
Rotorua Lakes CouncilTo restore the Rotorua Museum and surrounding Government Gardens in order to preserve cultural and historic assets.
$20,000,000
approved
$15,000,000 paid
Rotorua Lakefront Development - Provincial Growth Fund
Rotorua Lakes CouncilTo develop Rotorua Lakefront to a world class standard and develop the amenity and deliver transformational outcomes for the city and wider region.
$19,900,000
approved
$19,900,000 paid
Rangiuru Business Park Motorway Interchange
Quayside Properties LimitedTo construct a motorway interchange on the Tauranga Eastern Link toll expressway which will unlock a significant block of industrial land, allowing the creation of jobs and economic opportunities for the Bay of Plenty.
$18,000,000
approved
$18,000,000 paid
0Red Stag Wood Processing Hub
Red Stag Wood Solutions LimitedTo expand existing operations to develop a cross-laminate timber factory in Rotorua.
$15,000,000
approved
$15,000,000 paid
Te Huata Mussel Spat Hatchery - Equity 2
Te Huata Charitable Trust (Te Whānau-ā-Apanui)The project is the development of a $40 million Mussel Spat Hatchery near Te Kaha, being developed by Te Whānau-ā-Apanui via Te Huata International Ltd Partnership (THI). The project is well supported by Callahan, Cawthron and MPI and is consistent with New Zealand’s aquaculture strategy. In addition, this will create approximately 17 FTE’s in one of New Zealand’s most economically supressed areas and support the Crown’s investment in the mussel industry in Ōpōtiki.
$13,900,000
approved
0Whakatāne Commercial Boat Harbour - Equity
Whakatāne Commercial Boat Harbour (Equity)Development of a fit-for-purpose boat harbour on Māori freehold land in Whakatāne.
$13,900,000
approved
$9,800,000 paid
Bay of Plenty CRP - Bay of Plenty River Schemes - Flood Resilience Project
Bay of Plenty Regional CouncilTo undertake civil works construction, design, modelling, project management, land purchase, tree removal and native planting work in the Lower Kaituna, Ngongotahā Stream, Rangitāiki and Whakatāne Rivers and the Waioeka River.
$12,900,000
approved
$11,528,834 paid
436 jobs
Ōpōtiki CBD improvement (IRG) - PARENT DEAL
Ōpōtiki District CouncilTo demolish and rebuild a new library and community facility that will provide a hub for digital learning, technology and innovation as part of a group of projects that aim to upgrade the Ōpōtiki central business district.
$11,900,000
approved
$11,900,000 paid
375 jobs
Tāheke Geothermal Power Station Enabling Works
Eastland Generation LimitedTo undertake the design, civil construction works and drilling to enable consenting and construction of the Tāheke Geothermal Power Station in Rotorua.
$11,900,000
approved
$11,900,000 paid
150 jobs
State Highway Package - SH 5 Tārukenga to Ngongotahā
New Zealand Transport AgencyTo undertake safety, accessibility and congestion improvements between State Highways 5 and 36, as part of the wider "State Highway Package" of 18 projects.
$11,575,000
approved
$10,342,232 paid
Raukōkore-Waihau Bay Community Irrigation
Te Whanau A Maruhaeremuri Hapu TrustTo design and build the Raukōkore/Waihau Bay community irrigation scheme in the Eastern Bay of Plenty.
$11,550,000
approved
$11,550,000 paid
3 jobs
Ōpōtiki District Council Sundry Harbour Projects
Ōpōtiki District CouncilTo construct a harbour for boats to harvest, moor and deliver product to be processed within Ōpōtiki.
$11,050,000
approved
$10,910,063 paid
45 jobs
Bay of Plenty Regional Council - Project Future Proof Whakatāne-Tauranga Rivers Scheme
Bay of Plenty Regional CouncilTo upgrade existing stopbanks and floodwalls in the Whakatane CBD to meet one in a hundred year levels of flood protection and provide mitigation for climate change.
$10,690,000
approved
$1,426,287 paid
7 jobs
Bay of Plenty CRP - Rangitāiki River - Flood & Spillway Protection Edgecumbe
Bay of Plenty Regional CouncilTo increase the capacity of the Rangitāiki River spillway through diversion of flood flows from the river by increasing flooding capacity and construction of a spillway upstream of Edgecumbe as part of a larger flood management programme.
$10,275,000
approved
$10,275,000 paid
257 jobs
Whakatāne Riverfront Revitalisation - Cluster
Whakatāne District CouncilTo redevelop the Whakatāne riverfront where it meets the central business district, into a world-class small town destination.
$9,600,000
approved
58 jobs
Kawerau Container Terminal Rail Siding
KCT Co LimitedTo develop a container terminal with rail siding access and related infrastructure in Kawerau, connecting to the existing KiwiRail infrastructure to the Tauranga port.
$9,600,000
approved
$2,400,000 paid
12 jobs
St John's Ambulance Station (IRG)
St JohnsThe project will establish a new St John Ambulance and Emergency Hub for the Rotorua District. IRG Ministers approved in principle $11m for the project, although the project cost has been scaled down to $9.194m based on a quantity survey of the project.
$9,194,000
approved
$8,690,735 paid
Bay of Plenty Regional Council - Kaituna Catchment Control Scheme Upgrades
Bay of Plenty Regional CouncilTo upgrade flood protection for Te Puke and wider Kaituna catchment with installation of replacement pump station for Ford Road, a new pump station downstream of the Te Puke township and Kaituna Catchment Control Scheme Stopbank Upgrades.
$8,420,000
approved
$3,149,906 paid
1 jobs
Whakatāne Worker Redeployment on Local Road and Infrastructure Projects
Whakatāne District CouncilBOP Regional Council - removal of wilding trees along rivers, BOP Regional Council - track maintenance, shore cleaning, wilding pine control, Bunyan Rd Seal Extension, Parks and Reserves maintenance, enhancement and nursery , Various 3 waters projects.
$8,229,000
approved
$8,229,000 paid
197 jobs
Raukōkore/Waihau Bay Kiwifruit Development
Te Whānau a Maruhaeremuri Hapū Trust on behalf of Tawaroa Toopu and Orete 2To develop 50 hectares of grazing land into kiwifruit that will use the Raukōkore/Waihau Bay community irrigation scheme.
$8,000,000
approved
$7,081,494 paid
Ngāti Awa Whakatāne Kāinga Tourism Hub
Whakatāne Kāinga ProjectTo accelerate the development of the Army Hall Building into the Whakatāne Tourism Hub, situated on the Whakatāne River Shores.
$7,600,000
approved
$1,350,000 paid
10 jobs
Kaingaroa Community Infrastructure Upgrades
Rotorua Lakes Council & Te Puni KokiriTo refurbish and install new community infrastructure in Kaingaroa Village, including water, lighting, roading and community facilities.
$7,200,000
approved
$7,100,000 paid
Ōpōtiki Industrial Marina and Wharf - Equity
Ōpōtiki Marina and Industrial Park LimitedTo construct an industrial and recreational wharf for boats to launch and moor within Ōpōtiki.
$7,000,000
approved
$1,500,000 paid
45 jobs
Pukeroa Oruawhata Trust - QE Health Enabling Works
Pukeroa Lakefront Holdings LimitedTo construct a spa and wellness facility on the Rotorua Lakefront that will provide 5-Star wellness orientated spa/bathing services.
$6,500,000
approved
$6,500,000 paid
74 jobs
QE Health Rebuild - Loan
QE HealthTo construct a purpose built facility that will house Queen Elizabeth Health on the Rotorua Lakefront, ensuring the retention of highly skilled jobs.
$6,500,000
approved
$6,500,000 paid
STAPP - Te Puia
Te Puia NZMACI Limited PartnershipApproved funding as part of the Strategic Tourism Asset Protection Programme.
$6,122,000
approved
$6,122,000 paid
Te Kaha Kiwifruit Irrigation Development - Loan 3
Te Huata Irrigation 1 LPThe detailed design, construction and operation of water storage and reticulation.
$6,000,000
approved
$1,200,000 paid
Te Huata Mussel Spat Hatchery - Equity 1
Te Huata Charitable Trust (Te Whānau-ā-Apanui)To build a mussel spat hatchery near Te Kaha.
$6,000,000
approved
$6,000,000 paid
Peka Industrial Park Enabling Infrastructure
Peka Developments Limited PartnershipTo complete stage one of the development on 14 hectares into an industrial park over the next 5 years.
$6,000,000
approved
$6,000,000 paid
Ōpōtiki Mussel Farming and Production Facility - Equity 2
Whakatohea Mussels (Ōpōtiki) LimitedTo build a mussel processing and production facility in Ōpōtiki.
$6,000,000
approved
$6,000,000 paid
Ōpōtiki Mussel Farming and Production Facility - Concessionary Loan
Te Tāwharau o Te WhakatōheaTo build a mussel processing and production facility in Ōpōtiki.
$5,800,000
approved
$5,800,000 paid
Acceleration of Minginui Nursery
Minginui Nursery LtdFunding to scale up Minginui Nursery production of forestry grade native seedlings and boost community development. Minginui Nursery is owned by Ngati Whare Holdings, and already employed and trained local people. Ngati Whare has developed a successful approach to getting local people into full-time permanent work through offering wrap-around services, like social and health services. It grows forest-grade podocarp species – rimu, totara, matai, kahikatea, miro – and kauri. It already had a large order book for manuka, kanuka and other pioneer species. Funding will allow the nursery to grow from 20,000 seedlings per year to 1 million seedlings per year.
$5,800,000
approved
$5,800,000 paid
Whakarewarewa Forest Development - Provincial Growth Fund
Rotorua Lakes CouncilTo develop the lead infrastructure, improve the user experience, help monetise the asset of the forest for mana whenua through tourism infrastructure.
$5,500,000
approved
$5,500,000 paid
Crown Forestry Joint Ventures - Bay of Plenty
Various$5,227,856
approved
$3,444,393 paid
Pūtauaki Trust Roading and Infrastructure – Stage 2 (Grant)
Putauaki TrustTo create a roundabout on State Highway 34 to provide safe access to an industrial zone, and other related roading infrastructure to enhance the development of the industrial zone.
$5,200,000
approved
$5,200,000 paid
Waiū Dairy Butter Processing Facility
Waiū Dairy Limited PartnershipTo purchase and install consumer butter packaging facilities to enable the plant to add value to its business.
$4,900,000
approved
$4,900,000 paid
Te Kaha Microgrid Battery
Te Huata Solar Limited PartnershipTo install enabling energy infrastructure (via a battery solution) in Te Kaha to maximise the generation potential of the solar array currently being constructed.
$4,751,000
approved
Whakatāne Commercial Boat Harbour - Suspensory Loan
Te Rahui Lands Limited PartnershipTo develop a fit-for-purpose boat harbour on Māori freehold land in Whakatāne.
$4,700,000
approved
013 jobs
Ōpōtiki Worker Redeployment Package
Ōpōtiki District CouncilCoastal Footpaths (4km), Motu Cycleway Extensions x3, Ōpōtiki Horse Trail, Ōpōtiki Footpaths (29km - all Ōpōtiki footpaths)
$4,321,000
approved
$4,321,000 paid
Ngāti Pūkenga Kiwifruit Development - Loan
Te Haumanu o Te Kapua (Loan)To undertake land remediation and replace with kiwifruit orchards, waterway and environmental improvements and protect areas of cultural significance for the benefit of Ngāti Pūkenga.
$3,940,514
approved
$3,500,000 paid
Validation Stage of the Ōpōtiki Harbour Development Project
Ōpōtiki District Council$3,667,040
approved
$3,667,040 paid
Miro-Meihana Koata GP Ltd - Primary Producer Finance Scheme
Miro-Meihana Koata General Partner LimitedThe Borrower is based in Bay of Plenty and the business of the Borrower that isbeing supported by the Facility is blueberry orchards
$3,500,000
approved
$2,450,000 paid
Ngāti Awa Group Holdings Limited: Protection of Waterways and Improved Environment Footprint
Ngati Awa Group Holdings LtdNgati Awa Farms Limited operates 2x dairy farms and 1x dry stock farms in the Eastern Bay of Plenty. This project will employment and will contribute to improvement in water quality of many rivers,ponds,streams and drains on our farms.
$3,480,525
approved
$3,480,525 paid
27 jobs
Bay of Plenty Regional Council -Rangitāiki-Tarawera Rivers Scheme Flood Resilience Improvements
Bay of Plenty Regional CouncilUpgrades to stopbanks and canals across several river sections, including geotechnical investigations, detailed design, and construction works at Kōkōhinau, the Tarawera River, Rangitāiki River, and Rangitāiki Canals.
$3,120,000
approved
Blue Light Youth Driver Navigator Programme
Blue Light Ventures IncTo undertake a programme to target at-risk young people across Bay of Plenty and Waikato to successfully attain a full drivers licence to increase individuals ability to gain and remain in employment.
$3,002,968
approved
$3,002,968 paid
He Waka Eke Noa – Mahi ora
Te Puna Ora o Mataatua Charitable TrustThe establishment of a health and medical academy based in Whakatāne to create pathways and provide skills targeted towards Māori including whanau and wahine (single mothers) whanau caregivers and those returning to the workforce.
$2,953,128
approved
$2,953,128 paid
Eastern Region – Surf Lifesaving Rescue Centre (IRG)
Omanu Beach Charitable TrustThis project will build a new multi-purpose community rescue centre that will bring together the Omanu Beach Charitable Trust with the Eastern Regional and National surf lifesaving capacity in the eastern region. The project involves demolishing the old Mt Manganui Bridge Club and building a new, fit-for-purpose 1,300m2 building on Tauranga City reserve. The facility provides synergies for search and rescue, surf lifesaving and other local community groups.
$2,890,000
approved
$2,890,000 paid
155 jobs
STAPP - Mitai Māori Village
Mitai Māori VillageTo provide ongoing business support following the disruption caused by COVID-19 as part of the essential New Zealand tourism offering.
$2,830,000
approved
$1,800,000 paid
Bay of Plenty Regional Council - Whakatāne River Flood Resilience Infrastructure Upgrades
Bay of Plenty Regional CouncilRepairing and strengthening stopbanks, replacing culverts, and implementing seepage control measures at key sites such as Trident Stopbank, Awatapu Lagoon, and the Whakatāne Canals.
$2,640,000
approved
Tāmaki Māori Village - Tourism Asset Protection Programme
Tuahara North Tourism and Company LPTo provide ongoing business support following the disruption caused by COVID-19 as part of the essential New Zealand tourism offering.
$2,630,000
approved
$2,630,000 paid
Ngāti Awa Marine Training Centre and Workforce Development Hub
Te Rūnanga o Ngāti AwaTo deliver a marine training programme in Whakatāne targeting Ngāti Awa descendants and young people within the wider Eastern Bay of Plenty and support them into employment.
$2,573,800
approved
$2,543,800 paid
Whakatāne Regeneration Programme
Whakatāne District CouncilTo support a delivery model to accelerate and procure external expert advice to deliver the Whakatāne Riverfront Revitalisation Project, the Whakatāne Commercial Boat Harbour Development and the Whakatāne Kainga Project.
$2,500,000
approved
$1,967,000 paid
1 jobs
STAPP - Waiotapu Thermal Wonderland
Waiotapu Thermal WonderlandTo provide ongoing business support following the disruption caused by COVID-19 as part of the essential New Zealand tourism offering.
$2,500,000
approved
$2,500,000 paid
Manawa Tū Work for Life Employment and Training Hub
Te Runanga o Ngāti ManawaTo undertake a programme to provide targeted pre-employment training, pathways to employment and pastoral care for people looking to move into the workforce to address the high unemployment rates in Murupara and the surrounding areas.
$2,289,150
approved
$2,289,150 paid
Tunnicliffe Value-added Timber Expansion
Tunnicliffe Timber Solutions Limited (In Liquidation)To expand an existing business to produce higher value-added timber windows and doors, using pine that is thermally modified.
$2,250,185
approved
$2,250,185 paid
Miro-Meihana Koata Berry Farm - Whenua Māori
Meihana Koata TrustTo develop an 18.2 hectare blueberry orchard on Māori land.
$2,125,000
approved
$2,125,000 paid
Waihau Bay Kiwifruit Development
Waihau Bay JV Limited PartnershipTo develop unused Māori freehold land into green kiwifruit production.
$2,120,000
approved
$1,620,000 paid
Miro-Meihana Koata Berry Farm - Māori & Pasifika Business Investments
Meihana Koata TrustTo develop an 18.2 hectare blueberry orchard on Māori land.
$2,100,000
approved
$2,075,000 paid
Whāia te Rangatiratanga – Pathways to Independence
Te Puna Ora o Mataatua Charitable TrustThe Whāia Te Rangatiratanga programme is a whānau-led, whānau ora approach to support rangatahi on a pathway to sustainable employment. The programme provides up to 26 weeks of individualised support to assist rangatahi to address barriers to employment, and helps them to plan a pathway to independence.
$2,001,382
approved
$2,001,382 paid
Rebuild of Rotorua Museum - Immediate Capital Investments
Rotorua Lakes CouncilTo restore the Rotorua Museum and surrounding Government Gardens in order to preserve cultural and historic assets.
$2,000,000
approved
38 jobs
Pūtauaki Trust Roading and Related Infrastructure - Stage 1 project
Putauaki TrustTo construct key infrastructure, enabling access to the 112 hectares of Putauaki Industrial Zone in Kawerau.
$2,000,000
approved
$1,887,539 paid
Te Kaha Kiwifruit Development - Loan 1
Ngutupiri JV Limited PartnershipTo develop up to 10 hectares of kiwifruit orchards in Te Kaha as part of a larger project which involves turning underutilised Māori land (approximately 15 blocks of 100 hectares) into productive kiwifruit orchards.
$2,000,000
approved
$2,000,000 paid
KLC Plant Expansion -Ngati Manawa Development Limited
Ngati Manawa Development LimitedTo purchase, install and commission a new integrated finger jointing line to expand the capacity of the manufacturing plant at KLC.
$2,000,000
approved
$2,000,000 paid
Bay of Plenty Regional Council - Ohineangaanga Stream Erosion Protection Works
Bay of Plenty Regional CouncilReinforcing stream banks in Te Puke through stopbank upgrades, using rock and sheet pile materials. The works are designed to stabilise erosion-prone areas.
$1,980,000
approved
Marae Connectivity - Bay of Plenty
National Infrastructure Funding and FinancingConnecting marae and providing a broadband service for 5 years as well as installation of essential hardware to allow for increased opportunities and connectedness within New Zealand.
$1,926,126
approved
$1,926,126 paid
Rural Broadband/Mobile Blackspots - Bay of Plenty
National Infrastructure Funding and FinancingTo install broadband infrastructure rural New Zealand to increase the availability in black spot areas along state highways.
$1,868,235
approved
$1,868,235 paid
Ōpōtiki Industrial Marina and Wharf - Loan
Ōpōtiki Marina and Industrial Park LimitedTo construct an industrial and recreational wharf for boats to launch and moor within Ōpōtiki.
$1,800,000
approved
0Mauri Oho Methamphetamine Harm Reduction Programme
Eastern Bay of Plenty Iwi Provider AllianceTo undertake a programme working with gang members and their whānau to reduce methamphetamine harm across the Eastern Bay to become drug free and positively contribute to their local communities and delivered by an alliance of four Eastern Bay of Plenty iwi organisations.
$1,781,800
approved
$1,781,800 paid
Pathway to Trades Youth Programme
TradeUp LtdTo undertake a programme to work one-to-one with at least 100 rangatahi who are most at risk of long-term unemployment and do not meet criteria for other assistance, and connect them with employers to arrange apprenticeships or training.
$1,686,000
approved
$1,533,645 paid
Pūtauaki Industrial Development Off-Highway Road Construction - Grant
Sequal Lumber LimitedTo construct an off-road highway connecting the Kawerau container terminal with the Putuaki industrial zone, and unlock access to neighbouring land blocks for development.
$1,624,000
approved
$1,624,000 paid
Pukepine Sawmills Expansion
Pukepine Sawmills (1998) LimitedTo expand existing business activity and employ additional people to extend machine running times and increase productivity.
$1,600,000
approved
$1,600,000 paid
145 jobs
QE Health Rebuild - The Complex (Grant)
QE HealthConstruction of a new purpose built facility that will house the QE Health business. This ensures the retention of 75 jobs and enables the business to grow, thereby providing more services to the community.
$1,500,000
approved
$1,500,000 paid
Te Kaha Kiwifruit Nursery - Business Operations - Provincial Growth Fund
TKG Nursery LimitedTo support phase one of the Te Kaha Development Plan aimed to deliver a group of seven projects including a number of business cases and feasibility studies.
$1,500,000
approved
$1,500,000 paid
QE Health Rebuild - Ground Improvement Works
QE HealthConstruction of a new purpose built facility that will house the QE Health business. This ensures the retention of 75 jobs and enables the business to grow, thereby providing more services to the community.
$1,500,000
approved
$1,500,000 paid
88 jobs
Karapiti and Kapenga Wetland Restoration
Kapenga M Trust$1,496,300
approved
$1,496,300 paid
Ngāti Mākino Iwi Authority - Catchment planting
Ngati Makino Iwi Authority$1,445,825
approved
$1,331,500 paid
Bay of Plenty Regional Council - Ōpōtiki Township Stopbank Flood Resilience Improvements
Bay of Plenty Regional CouncilDesign and construction of upgrades stopbanks, including geotechnical investigations, procurement of construction materials, and civil engineering activities to build protection infrastructure
$1,380,000
approved
Bay of Plenty Regional Council - Waioeka Otara Rivers Scheme Stopbank Upgrades
Bay of Plenty Regional CouncilTo upgrade existing stopbanks and floodwalls of the rivers to meet one in a hundred year levels of flood protection and provide mitigation for climate change.
$1,200,000
approved
$230,466 paid
2 jobs
Pukeroa Lakefront Land Remediation
Pukeroa Lakefront Holdings LimitedTo remediate contaminated land on the former Queen Elizabeth Hospital site in Rotorua.
$1,200,000
approved
$1,200,000 paid
Paengaroa North Kiwifruit Development
Kauaeranga LimitedTo convert 8.66 hectares of a dairy run-off block into Hayward green kiwifruit on the Māori whenua land in Paengaroa.
$1,164,856
approved
$70,686 paid
Ana Whakamua – RBC Land Workforce Development Programme
Robert Black Contracting LimitedTo deliver an NZQA training programme for fencing and pest management for environment-based roles including Predator Free and regional and district council programmes.
$1,111,358
approved
$1,111,351 paid
Te Moana a Toi Truffle Orchard
Te Moana A Toi Truffles Limited PartnershipTo retire seven Māori whenua land blocks from grazing and develop 13 hectares into truffle orchards, increase productivity and capability and reduce carbon emissions.
$1,110,000
approved
$1,020,000 paid
Rotorua Worker Redeployment Package
Rotorua Lakes CouncilThe Recipient will use the Funding to deliver the 2 vegetation control projects approved Cabinet Committee on the 18 May 2020 as part of the Redeployment fund.
$1,100,000
approved
$1,100,000 paid
25 jobs
STAPP - Ngati Awa Tourism Limited & Te Manuka Tutahi Marae
Ngati Awa Tourism Limited & Te Manuka Tutahi MaraeApproved funding as part of the Strategic Tourism Asset Protection Programme
$1,091,685
approved
$1,091,685 paid
$1,056,961
approved
$1,056,961 paid
Pūtauaki Industrial Park Roading and Infrastructure - Loan
Putauaki TrustTo enable the extension of the Tamaoho Drive by up to 300m to allow a further eight hectares of industrial land to be accessed by potential tenants in the future.
$1,000,000
approved
$1,000,000 paid
Whakarewarewa - The Living Māori Village - Tourism Asset Protection Programme
Whakarewarewa - The Living Māori VillageTo provide ongoing business support following the disruption caused by COVID-19 as part of the essential New Zealand tourism offering.
$1,000,000
approved
$1,000,000 paid
Rotorua Lakefront Development - Immediate Capital Investments
Rotorua Lakes CouncilTo develop Rotorua Lakefront to a world class standard and develop the amenity and deliver transformational outcomes for the city and wider region.
$1,000,000
approved
$1,000,000 paid
Whakatāne Commercial Boat Harbour (Grant)
Te Rahui Lands TrustDevelopment of a fit for purpose Boat Harbour Development on Māori freehold land.
$1,000,000
approved
$1,000,000 paid
7 jobs
KLC Plant Expansion - K.L.C Limited
K.L.C. LimitedTo purchase, install and commission a new integrated finger jointing line to expand the capacity of the manufacturing plant at KLC.
$1,000,000
approved
$1,000,000 paid
Project Whirinaki
Te pua o whirinaki Regeneration Trust$992,000
approved
$881,778 paid
Food Production Hub for Tuawhenua
Tuhoe Tuawhenua TrustTo construct a food production hub in Ruatāhuna, beginning with Honey production.
$986,519
approved
$986,519 paid
5 jobs
Te Kaha Nursery Expansion
TKG Landowners Group Holdings Limited Partnership (TKG LLP) on behalf of TE KAHA 4B (Lot 2 Deposited Plan 8197)Undertake remedial works and install necessary infrastructure on the whenua (land) in preparation for construction of the Nursery.
$982,705
approved
$982,705 paid
Pūwhakamua
Tikanga Aroro Charitable TrustThis Social Capital funded project includes a residential programme that contributes to reducing methamphetamine reoffending, improved health and well being lifestyles, and quality of life of men that been incarcerated. The project is for up to 20 men and is based in Rotorua.
$976,000
approved
$976,000 paid
3 jobs
Youth Employment Plus - Rotorua
Rotorua Youth CentreThis regionally-led initiative in the Bay of Plenty that will create a Community of Impact ‘for Rotorua, by Rotorua eco-systems’ that supports and empowers young people into education, training and employment. Operating out of a ‘Youth Employment Base’ using a systems approach, a team of trained Youth Worker Navigators will work with stakeholders such as employers, education providers and industry partners to provide comprehensive support to young people’s transitions to being work-ready, and gaining and sustaining employment.
$960,000
approved
$947,330 paid
Raukōkore Irrigation Feasibility and Design Study
Te Whanau A Maruhaeremuri Hapu TrustFeasibility and design study by Aqualinc to investigate irrigation for up to 640ha of land at Raukokore in the Eastern Bay of Plenty,
$950,600
approved
$950,600 paid
2 jobs
Accelerating Aquaculture Development in Whakatōhea Rohe Moana
Te Tāwharau o Te WhakatōheaTo accelerate the development of aquaculture in the whakatohea rohe moana. Develop a number of feasibilities and employ a project manager.
$950,000
approved
$950,000 paid
26 jobs
Macadamia Orchard in Raukōkore, Waihau Bay
Te Whānau a Maruhaeremuri Hapū Trust on behalf of Te Poito 7B1, Orete E2, and Te Waiti 2B2BTo develop 20 hectares of organic macadamia orchards on Māori land blocks in Waihau Bay.
$894,161
approved
$603,000 paid
24 jobs
Te Kaha Development Project - Horticulture Centre of Excellence - Grant
Te Kaha Group Holding Limited PartnershipTo establish a Horticulture Centre of Excellence that will service the Te Kaha, Ōmāio and Raukōkore communities, to train, upskill and enable a work-ready workforce to fill new employment opportunities.
$878,000
approved
$878,000 paid
Arā Rau Work Hub Establishment
Priority One Western Bay of Plenty IncorporatedTo establish a new hub that will serve as the primary connection between employers, young job seekers and other service providers (pastoral care/ training providers) in Tauranga.
$870,400
approved
$870,400 paid
Ōpōtiki Mussel Farming and Production Facility - Stage 1 & 2 (Grant)
Whakatohea Mussels (Ōpōtiki) LimitedStage 1 - Business Case; & Stage 2 - to accelerate the company's deep water mussel farming & on-land processing of live mussels, for domestic & export markets.
$850,000
approved
$850,000 paid
28 jobs
Youth to Employment & Education (Y2)
Te Pou Oranga o Whakatōhea LimitedThe Y2 Hub (based in Opotiki) will support rangatahi and their transition into employment, to higher training pathways or to actively engaging in job seeking. The programme is targeted at 16-24 year olds not engaged in education, employment or training. Programme outcomes include 90 rangatahi enrolled and committed and 20 placed into sustainable employment over 2 years. This is tranche 2 of the initiative.
$819,652
approved
$819,652 paid
Rotorua Big Moves - Rotorua Lake front and Whakarewarewa Forest business case development and detailed design
Rotorua Lakes CouncilSeeking funding to support and enable Phase Two of its "Big Moves" economic development projects, designed to leverage tourism growth and deliver enduring regional and national benefit. Including the development of the Rotorua Lakefront and ongoing enhanc
$811,625
approved
$811,624 paid
28 jobs
Te Kaha-nui-a-Tiki - Te Kaha Development Project (Grant 2 - water feasibility)
Te Kaha Group Holding Limited PartnershipTo support phase one of the Te Kaha Development Plan and develop a number of business cases and feasibility study.
$800,000
approved
$800,000 paid
1 jobs
Pāpāmoa Surf Rescue Base and Mixed Use Community Facility (IRG)
Papamoa Community Surf Rescue Base TrustThe project will complete the development of their new surf lifesaving club and mixed-use community facility in Pāpāmoa. The build began in September 2019 after years of fundraising and is projected to be complete in December 2020.
$800,000
approved
$800,000 paid
Waiariki Film Studios Production Studio
Film Bay of Plenty Trust and Steambox TrustTo develop a sound stage in central Rotorua to attract larger film productions and leverage local cultural talent and film resources.
$800,000
approved
$100,000 paid
He Poutama Rangatahi o Whakaatu Whanaunga Trust (Tranche 2)
Whakaatu Whanaunga TrustThis regionally-led initiative in the Bay of Plenty is a high intensity NEET work fit programme that incorporates intensive support and mentoring that will help rangatahi most at risk to explore, identify and realise their aspirational goals. The programme objectives include identifying potential pathways, and achieving planned objectives including up-skilling and training toward identified qualifications. This will be teamed with support in brokerage of sustainable employment. This is tranche 2 of the initiative.
$798,631
approved
$798,631 paid
Te Haumanu o Te Kapua (Grant)
NGĀ HUA O NGĀTI PŪKENGA LIMITEDA land remediation and multi-purpose development to increase the productivity,improve the environment, and protect areas of cultural significance for the benefit of Ngāti Pūkenga uri. Kiwifruit
$766,000
approved
$766,000 paid
Ngai Tamarawaho Purpose-Built Contracting Facility
Te Mahi A Nuku General Partner LtdTo develop unused Māori land into a purpose-built contracting yard and nursery including developing hardstand areas for plant storage, land preparation, contouring and developing access ways, fencing, gates and staff room.
$726,000
approved
$710,000 paid
Whanake te Kura - School of Hard Knocks Aotearoa
Social Good LimitedThis programme conducts an individual needs assessment for rangatahi NEETS before they are placed on a 20-week foundational skills course that focuses on numeracy, literacy and driver licencing. It is underpinned by the concept of using sport as a tool for addressing barriers to employment and education. High profile ambassadors provide mentoring alongside 2 full-time pastoral mentors. It is marae-based, with sports training provided as a local rugby club in Whakatāne.
$713,740
approved
$713,740 paid
$700,000
approved
$700,000 paid
BOPRC Priority Planting Programme
Bay of Plenty Regional CouncilThis programme will target planting 170 hectares of high priority erosion prone land with mostly native species. This will happen during the 2020 and 2021 planting seasons.
$693,000
approved
$693,000 paid
Scion - Acceleration of Primary Production in Native Trees
ScionThis research project aims to boost the deployment of high-quality native trees to meet increasing future demand for seedlings. This project provides critical science research for native seedling propagation.
$676,250
approved
$676,250 paid
Exploration and Activation to Thrive
Ōpōtiki College Board of TrusteesThe Exploration and Activation to Thrive programme will provide intensive tailored support for college students at high risk of becoming NEETS by providing more access to ‘hands on’ learning options, soft and tangible skills training, individualised pastoral support, whānau support and exposure to training and work experience with alignment to employment outcomes. The programme will involve intensive mentors/coaches, year-round support including during school holidays, as well as access and exposure to employment, role models, and tertiary study opportunities and experiences available outside Ōpōtiki.
$651,000
approved
$651,000 paid
Whakatāne Waterfront and Town Centre Regeneration
Whakatāne District CouncilTo unlock further growth in tourism & marine services in Whakatane, leveraging off Whakaari/White Island's iconic tourism attraction status. This application is for specific plans, models & assessments necessary for a robust Better Business Case.
$646,000
approved
$646,000 paid
22 jobs
Ruatoki Marae Renovation Project - PARENT DEAL
Te Ahi Komau Charitable TrustTo undertake renovations and repairs to a group of Marae including two in Rūātoki and one in Waimana.
$622,833
approved
$234,494 paid
Kaupapa Māori Methamphetamine Service
Manaaki Ora TrustThis is a Social Capital funded 6-bed dedicated detox facility for the treatment of meth addition and associated recovery support. The programme will employ one FTE for one year to develop the service design. It is based in Rotorua and serves the wider Bay of Plenty. The Programme will consider all referrals
$616,677
approved
$616,677 paid
Omataroa Eco Tours
Omataroa Rangitaiki No2 TrustOffering a range of unique visitor experiences around existing Kiwi conservation, ecological, Mātauranga Māori knowledge and education through sustainable Māori eco-tourism.
$615,902
approved
$615,902 paid
0Tōrere Macadamias Limited - Primary Producer Finance Scheme
Tōrere Macadamias LimitedThe Borrower is based in Gisborne and the business of the Borrower that is being supported by the Facility is a Macadamia and plant propagation nursery.
$600,000
approved
$600,000 paid
$595,200
approved
$595,200 paid
Development of Matahi Forest
Te Waimana Kaaku TrustTo implement the Matahi Forest Silviculture Programme into a structured management regime, and to be able to undertake sustainable rotational logging in approximately 10 years
$579,490
approved
$579,490 paid
14 jobs
Mt Maunganui North - upgrade of Toilets
Tauranga City CouncilProvision of toilet facilties at the base of Mauao in Mount Maunganui North
$577,500
approved
$577,500 paid
Wai o Te Hau Blueberry Development
Wai O Te Hau GP LimitedTo develop a small scale blueberry development (under 1 ha) on Māori owned land to test the site conditions and provide a base for future growth.
$570,000
approved
$570,000 paid
10 jobs
Ōnuku Sheep Milking Facility
Ōnuku Maori Lands TrustTo establish a sheep milking unit in Rerewhakaaitu, near Murupara.
$549,000
approved
$549,000 paid
Manawa Ora Rangatahi
Manawa Ora RangatahiThis programme will see an existing tourist accommodation facility into a Life Skills Youth training facility for 60 NEETS who will be provided a pathway and pastoral care to navigate the transition from leaving school into the workforce, or into further training. The programme has a collaborative approach with iwi, hapū, the community and other service providers within the immediate and wider region. It will become an on-ramp for rangatahi to move into the Manawa Tū – Work for Life Centre or other employment or training programmes.
$540,450
approved
$540,450 paid
Waimana Kaaku Renovation Project - PARENT DEAL
Te Waimana Kaaku TrustRenovation work - Fencing, footpaths, roofing, painting, landscaping and entrance and carpark area
$508,757
approved
$508,757 paid
Te Arawa Hub Marae Renovation - Pikirangi
Te Arawa Lakes TrustTo renovate Pikirangi Marae as part of a cluster of ten Marae within the rohe of Te Arawa.
$500,000
approved
22 jobs
Murupara Digital Hub
Te Runanga o Ngāti ManawaTo establish a regional digital hub within the Work For Life Centre in Murupara to provide and improve digital opportunities and capability to the community and businesses.
$500,000
approved
$500,000 paid
7 jobs
Tūhourangi ki Tai Marae Restoration
Tuhourangi MaraeTo restore the Whare Tupuna at Tūhourangi Marae.
$500,000
approved
$500,000 paid
Waikotikoti and Murumurunga Marae Renovation - Murumurunga Marae
Waikotikoti and Murumurunga Marae TrustRenovation of Waikotikoti and Murumurunga Maraes
$500,000
approved
14 jobs
Otawhiwhi Marae Restoration and Renovation
Otawhiwhi MaraeThe Marae trust wish the marae facilities to be returned to their former glory, or the wairua, to be able to again host the visitor numbers that were previously seen and to continue to share the culture and stories by engaging with the people of Otawhiwhi
$500,000
approved
$500,000 paid
23 jobs
Tahuwhakatiki Marae Wharenui Restoration
Tahuwhakatiki MaraeRestoration work to marae atea including the paepae shelters and perimeter fence. Restore damage whakairo, kowhaiwhai, tukutuku, & raranga
$500,000
approved
$500,000 paid
10 jobs
Paruaharanui Marae
Paruaharanui MaraeRebuild, refurbish and reopen our marae, particularly our wharekai following the closure of our marae due to tree damage
$500,000
approved
$500,000 paid
14 jobs
Te Arawa Hub Marae Renovation - Hinemihi Marae
Te Arawa Lakes TrustTo refurbish Hinemihi Marae as part of a cluster of ten Marae within the rohe of Te Arawa.
$500,000
approved
10 jobs
Te Arawa Hub Marae Renovation - Opatia Marae (Taheke)
Te Arawa Lakes TrustTo renovate Opatia Marae as part of a cluster of ten Marae within the rohe of Te Arawa.
$500,000
approved
Te Arawa Hub Marae Renovation - Owhata Marae
Te Arawa Lakes TrustTo renovate Ōwhata Marae as part of a cluster of ten Marae within the rohe of Te Arawa.
$500,000
approved
12 jobs
Te Arawa Hub Marae Renovation - Pouakani
Te Arawa Lakes TrustTo renovate Pouakani Marae as part of a cluster of 10 Marae within the rohe of Te Arawa.
$500,000
approved
Te Arawa Hub Marae Renovation - Pounamunui
Te Arawa Lakes TrustTo renovate Pounamunui Marae as part of a cluster of 10 Marae within the rohe of Te Arawa.
$500,000
approved
23 jobs
Te Arawa Hub Marae Renovation - Tarimano
Te Arawa Lakes TrustTo renovate Tarimano Marae as part of a cluster of ten Marae within the rohe of Te Arawa.
$500,000
approved
Te Arawa Hub Marae Renovation - Taurua
Te Arawa Lakes TrustTo renovate Taurua Marae as part of a cluster of 10 Marae within the rohe of Te Arawa.
$500,000
approved
1 jobs
Te Rūnanga o Ngāti Awa Marae Cluster - Te Rewatu Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$500,000
approved
Te Rūnanga o Ngāti Awa Marae Cluster - Ruaihona Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$500,000
approved
Te Rūnanga o Ngāti Awa Marae Cluster - Pupuaruhe
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$500,000
approved
Renovation of Whakatohea Marae - Terere Marae
Te Tāwharau o Te WhakatōheaRenovation to a cluster of 3 marae - (Opape Marae, Waiaua Marae, and Terere Marae)
$500,000
approved
$500,000 paid
Te Māpou Marae Renovation
Te Māpou MaraeRemove and replace marae ātea and erect a full perimeter fencing at the property perimeter. Refurbish waharoa and manuhiri shelter
$500,000
approved
$500,000 paid
50 jobs
Rotoiti Marae Renovation - Tapuaeharuru Marae
Rotoiti 15 Ahu Whenua TrustTo renovate Tapuaeharuru Marae as part of a group of six Marae affiliated to Ngāti Pikiao and Ngāti Rongomai.
$500,000
approved
Rotoiti Marae Renovation - Te Awhe Marae
Rotoiti 15 Ahu Whenua TrustTo renovate Te Awhe Marae as part of a group of six Marae affiliated to Ngāti Pikiao and Ngāti Rongomai.
$500,000
approved
15 jobs
Rotoiti Marae Renovation - Tapuaekura Marae
Rotoiti 15 Ahu Whenua TrustTo renovate and refurbish Tapuaekura Marae as part of a cluster of six Marae based in the Rotoiti Forest.
$500,000
approved
15 jobs
Rotoiti Marae Renovation - Te Waiiti Marae
Rotoiti 15 Ahu Whenua TrustTo renovate and refurbish Te Waiiti Marae as part of a cluster of six marae based in the Rotoiti Forest.
$500,000
approved
Ruatahuna Marae Renovation Cluster – Kakanui (Tipapa) No.4
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$499,981
approved
Ruatahuna Marae Renovation Cluster – Ohaua Te Rangi Marae
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$499,980
approved
0Ruatahuna Marae Renovation Cluster – Uwhiarae Marae No.6
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$499,913
approved
0Ruatahuna Marae Renovation Cluster – Te Waiiti Marae No.09
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$499,861
approved
0Ruatahuna Marae Renovation Cluster – Tatahoata
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$499,606
approved
0Ruatahuna Marae Renovation - Mataatua II
Xcel Builders LimitedTo renovate a group of Marae including Ōpūtao, Kakanui (Tīpapa), Tatahoata, Uwhiārae, Mātaatua (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi, Te Wai-iti and Mataatua II.
$499,393
approved
0Ōkere Falls Scenic Reserve infrastructure upgrade
Lake Rotoiti Scenic Reserve BoardConstruction of new facilities (toilets, carparks and walkways) at Okere Falls Scenic Reserve
$499,234
approved
$498,128 paid
Ruatahuna Marae Renovation Cluster – Mataatua Marae (Te Urewera) No.7
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$499,154
approved
Ruatahuna Marae Renovation Cluster – No.1 Papueru
Xcel Builders LimitedRenovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae, Kakanui (Tīpapa) Marae, Tatahoata Marae, Uwhiārae Marae, Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe), Ōhāua te Rangi Marae, Te Wai-iti Marae, Mataatua II Marae
$498,370
approved
BOPRC Priority Planting Programme - (Extension)
Bay of Plenty Regional CouncilAn extension to the existing priority planting programme. This project gives support for fencing, site preparation and planting of high priority sites for 2020 and 2021. Focussing on high priority erosion prone areas, an additional 47 hectares will be planted with 134,000 native plants.
$498,000
approved
$498,000 paid
Pahaoa Marae Development Plan (Renovations/maintenance and upgrades)
Pahaoa MaraeUpgrade Marae entrance driveway and car park. Install 3 extra water tanks to increase storage and renovate and carry out maintanence of the wharenui
$497,610
approved
$497,610 paid
7 jobs
Rotoiti Marae Renovation - Nga Pumanawa Marae
Rotoiti 15 Ahu Whenua TrustTo renovate and refurbish Ngā Pumanawa Marae as part of a cluster of six Marae based in the Rotoiti Forest.
$494,262
approved
Te Rūnanga o Ngāti Awa Marae Cluster - Puawairua Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$493,048
approved
Maungapōhatu Marae Renovation Project
Xcel Builders LimitedTo undertake renovation and maintenance of the wharenui, wharepaku and wharekai at Maungapōhatu Marae.
$490,518
approved
$490,518 paid
0Rotoiti Marae Renovation - Punawhakareia Marae
Rotoiti 15 Ahu Whenua TrustTo renovate and refurbish Punawhakareia Marae as part of a cluster of six Marae based in the Rotoiti Forest.
$489,984
approved
Buried Village of Te Wairoa - Tourism Asset Protection Programme
D.W. Smith (Rotorua) LtdTo provide ongoing business support following the disruption caused by COVID-19 as part of the essential New Zealand tourism offering.
$484,000
approved
$242,000 paid
Tauarau Marae Renovation Project
Xcel Builders LimitedThis project is for an individual marae to: 1. Complete a full renovation and upgrade of the tipuna whare – Rongokarae 2. Upgrade all the concrete pathways around the tipuna whare 3. Restoration of all external whakairo
$477,707
approved
22 jobs
Te Huingawaka Marae Maintenance Project
Xcel Builders LimitedTo complete all marae mainternance work to the wharekai, wharenui and marae grounds
$461,160
approved
6 jobs
Lake Okāreka visitor facilities and walkway
Rotorua Lakes CouncilUpgrade of facilities (toilets, ramp and jetties) at Boyes Beach Reserve and Acacia Road Lakefront Reserve
$453,250
approved
$453,250 paid
Waikohatu Marae Renovations
Waikohatu Marae TrusteesRenovate the kitchen and ablution blocks
$449,994
approved
$449,994 paid
15 jobs
Te Rūnanga o Ngāti Awa Marae Cluster - Pūkeko Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$445,896
approved
Te Rūnanga o Ngāti Awa Marae Cluster - Te Pahou (Rangataua Marae)
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$444,446
approved
1 jobs
Supremegroup Marae Renovation Cluster - Maungaroa Marae
SupremegroupRenovation of Marae cluster (Waikirikiri, Maungaroa, Omaio, Kutarere, Rangitihi and Te Putere o Potaka Marae)
$443,042
approved
9 jobs
Matahi Forest Land project (Te Waimana Kaaku Native Planting Project)
Te Waimana Kaaku Trust$435,000
approved
$435,000 paid
Te Takinga Marae
Te Takinga Marae TrustRenovations to Dinning Room/Kitchen, wharepaku, wharenui, painting, mattress/storage room
$427,365
approved
$415,841 paid
Manawa Tu- Ngāti Manawa Mara - Rangitahi Marae
Te Runanga o Ngāti ManawaRenovations of a Cluster of 4 Marae - (Rangitahi Marae, Painoaiho Marae, Tipapa Marae and Moewhare Marae)
$408,509
approved
$408,509 paid
26 jobs
Imagine, Believe, Achieve Employment Training Programme
Bay of Plenty Youth Development TrustThe Imagine, Believe, Achieve Employment Training Programme is a three phase 12 month programme, utilisng the successful Tauranga Boxing Academy programme. The first phase is 13 weeks intensive tailored learning, second phase is 13 weeks providing work experience and education and the last phase is 6 months monitored employment (or alternative education pathways) experiences – with employer/employee input. The programme is based on Whare Tapa Wha, and a ‘wrap around’ pastoral support throughout training, work readiness and employment. Tikanga and Te Reo Maori are woven in the fibre of the programme.
$407,400
approved
$407,400 paid
Whakaari / White Island Accessibility Project
Ngati Awa Group Holdings LtdTo develop a feasibility study and business case focussed on the wharf structure to address constraints to visitor growth for tours to Whakaari/White Island
$400,000
approved
$400,000 paid
3 jobs
Katikati Digital Hub
Western Bay of Plenty District CouncilTo create and administer a regional digital hub in Katikati to provide and improve digital opportunities and capability to the community and businesses.
$400,000
approved
$400,000 paid
5 jobs
Ōpōtiki Digital Hub
Ōpōtiki District CouncilTo create and administer a regional digital hub in Ōpōtiki to provide and improve digital opportunities and capability to the community and businesses.
$400,000
approved
$400,000 paid
1 jobs
Ko Ngā Kākahi Whakairoiro o Hinehopu Programme - (PGF)
The Proprietors of Rotomā No. 1 IncorporationThe programme (Ko Ngā Kākahi Whakairoiro o Hinehopu) will target Te Arawa-affiliated rangatahi NEETs and existing forestry workers to create sustainable pathways to employment in forestry, hospitality and tourism, film and television, agriculture and horticulture. The tikanga based approach of the programme will build whakawhanaungatanga and kaitiakitanga. The programme is jointly funded by HPR, MSD and TPK with MBIE administering the funding.
$396,780
approved
$396,780 paid
TECT All Terrain Park Kiwicamp Facility
Western Bay of Plenty District Council$387,100
approved
$387,100 paid
Te Rūnanga o Ngāti Awa Marae Cluster - Mōtītī Island Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$375,134
approved
Business Support Grants Programme - Bay of Plenty
Toi EDA (Eastern Bay of Plenty Regional Economic Development Agency)Funding to Local Delivery Partner for Cyclone Gabrielle interim business support package
$375,000
approved
$375,000 paid
Te Arawa Hub Marae Renovation - Makahae Marae
Te Arawa Lakes TrustTo renovate Makahae Marae as part of a cluster of ten Marae within the rohe of Te Arawa.
$373,800
approved
12 jobs
Waiteti Marae Restoration
Ngati Ngararanui Hapu TrustRenovation of marae
$372,420
approved
$372,420 paid
2 jobs
East Coast Practical Driver Training Pilot Programme
Whakaari Logistics LimitedTo undertake a programme for individuals to gain driving related qualifications on the East Coast, targeting those who are underemployed or unqualified.
$371,890
approved
$371,890 paid
Whakaue Marae Cluster - Refurbishment - Waikuta Marae
Pukeroa Property Management Limited (a subsidiary of Pukeroa Orauwhaka Trust)To refurbish Waikuta Marae as part of the Whakaue Marae cluster of three Marae.
$370,127
approved
$370,127 paid
Te Kaha Kiwifruit Business Case - Grant 1
Te Kaha Group Holding Limited PartnershipTo support phase one of the Te Kaha Development Plan and develop a number of business cases and feasibility study.
$370,000
approved
$370,000 paid
ECT / Using drones to disperse seed pods for native forest regeneration
Environment & Conservation Technologies Ltd (ECT)$367,347
approved
$346,099 paid
Maromahue Marae Renovation Project
Maromahue Marae Charitable TrustRemoval & replacement of roofing, flooring/carpet and various electrical and plumbing work
$364,597
approved
$364,597 paid
Kohutapu Lodge and Tribal Tours Limited - Tourism Asset Protection Programme
Kohutapu Lodge and Tribal Tours LimitedTo provide ongoing business support following the disruption caused by COVID-19 as part of the essential New Zealand tourism offering.
$350,000
approved
$350,000 paid
Supremegroup Marae Renovation Cluster - Kutarere Marae
SupremegroupRenovation of Marae cluster (Waikirikiri, Maungaroa, Omaio, Kutarere, Rangitihi and Te Putere o Potaka Marae)
$347,754
approved
13 jobs
Te Rūnanga o Ngāti Awa Marae Cluster - Uiraroa Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$344,583
approved
1 jobs
Tūwharetoa ki Kawerau Health, Education and Social Services – Kawerau Pathways to Work - (He Poutama Rangatahi)
Kawerau District CouncilThis project will see a locally-led joint approach (based in Kawerau) to building the local labour force by implementing practical new programmes and support systems which will engage, focus, upskill and create pathways for over 100 people and help 40 people into sustainable employment. The programme also works along side other PDU funded project such as Eastern Bay Commercial Driver & Operator Training Centre (TAM) and School of Hard Knocks (HPR) and is an on-ramp into Kawerau Pathways to Work (HPR)
$344,000
approved
$344,000 paid
Supremegroup Marae Renovation - Ōmaio Marae
SupremegroupTo renovate Ōmāio Marae as part of a group of Marae projects.
$339,833
approved
14 jobs
Te Rūnanga o Ngāti Awa Marae Cluster - Tūteao Marae
Te Rūnanga o Ngāti AwaRenovation to a cluster of 12 Ngāti Awa Marae
$337,939
approved
Manawa Tu- Ngāti Manawa Marae - Moewhare Marae
Te Runanga o Ngāti ManawaRenovations of a Cluster of 4 Marae - (Rangitahi Marae, Painoaiho Marae, Tipapa Marae and Moewhare Marae)
$336,108
approved
$336,108 paid
26 jobs