Funding Projects

124 projects funded through Kanoa programmes

Showing 124 of 124 projects

Bay of Plenty CRP - Bay of Plenty River Schemes - Flood Resilience Project

Bay of Plenty Regional Council

To undertake civil works construction, design, modelling, project management, land purchase, tree removal and native planting work in the Lower Kaituna, Ngongotahā Stream, Rangitāiki and Whakatāne Rivers and the Waioeka River.

Bay of PlentyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$12,900,000

approved

$11,528,834 paid

436 jobs

Hawke's Bay CRP - Assess and Enhance Flood Resilience Infrastructure - Heretaunga Plains

Hawke's Bay Regional Council

A flood management programme to construct and strengthen stop banks on the Tutaekuri, Ngaruroro and Clive Rivers areas within the Heretaunga Plains Flood Control Scheme.

Hawke's BayCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceContracted

$12,800,000

approved

$12,800,000 paid

20 jobs

Manawatū-Whanganui CRP - Lower Manawatu Scheme Resilience

Horizons Regional Council

To upgrade 25 km of stop banks across the Lower Manawatū River flood Plain area.

Manawatū-Whanganui/HorowhenuaCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$11,680,457

approved

$11,680,457 paid

785 jobs

Invercargill CRP - Stead Street Stop Bank - Upgrade (IRG)

Invercargill City Council

To facilitate improvements to Invercargill's climate resilience by improving infrastructure in and around waterways, raising of stopbanks, and development of soft and riparian infrastructure.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$10,800,000

approved

$10,759,571 paid

14 jobs

Environment Southland - Mataura River Flood Protection Improvements (Gore and Mataura)

Southland Regional Council

Includes gravel realignment and extraction, rock wall and stopbank extension and strengthening, and construction of new floodbanks. It also includes data validation, land access agreements, and flood protection works along the Gore and Mataura rivers.

SouthlandRegional Infrastructure FundClimate ResilienceApproved

$10,800,000

approved

Bay of Plenty Regional Council - Project Future Proof Whakatāne-Tauranga Rivers Scheme

Bay of Plenty Regional Council

To upgrade existing stopbanks and floodwalls in the Whakatane CBD to meet one in a hundred year levels of flood protection and provide mitigation for climate change.

Bay of PlentyRegional Infrastructure FundClimate ResilienceContracted

$10,690,000

approved

$1,426,287 paid

7 jobs

Bay of Plenty CRP - Rangitāiki River - Flood & Spillway Protection Edgecumbe

Bay of Plenty Regional Council

To increase the capacity of the Rangitāiki River spillway through diversion of flood flows from the river by increasing flooding capacity and construction of a spillway upstream of Edgecumbe as part of a larger flood management programme.

Bay of PlentyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$10,275,000

approved

$10,275,000 paid

257 jobs

Marlborough District Council - Lower Wairau Stopbank Upgrades

Marlborough District Council

The project aims to upgrade and realign stopbanks at the narrowest point of the Lower Wairau river, increasing protection to agricultural/horticultural assets, residential and commercial, state highway and local roading networks, rail, energy, schools and municipal infrastructure.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceApproved

$10,200,000

approved

Tasman District Council - Lower Motueka River Stopbanks Level of Service Upgrade

Tasman District Council

The project aims to construct new – and upgrade existing – stopbanks and associated flood resilience infrastructure at the Lower Motueka River (near Motueka) increasing protection to agricultural/horticultural assets, residential, commercial and industrial, state highway and local roading networks, aerodrome, port, schools, bridges, a crop and food research facility and municipal infrastructure.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceApproved

$9,480,000

approved

West Coast CRP - Waiho River Stopbank Protection Phase 1

West Coast Regional Council

To improve flood protection and through the upgrade of existing and construction of new stopbank along the Waiho River.

West CoastCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$9,225,000

approved

$9,218,597 paid

Northland CRP - Awanui Scheme Upgrade

Northland Regional Council

To upgrade the current flood protection facilities in Awanui, Kaitāia.

Tai Tokerau/NorthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$8,510,630

approved

$8,510,630 paid

1003 jobs

Bay of Plenty Regional Council - Kaituna Catchment Control Scheme Upgrades

Bay of Plenty Regional Council

To upgrade flood protection for Te Puke and wider Kaituna catchment with installation of replacement pump station for Ford Road, a new pump station downstream of the Te Puke township and Kaituna Catchment Control Scheme Stopbank Upgrades.

Bay of PlentyRegional Infrastructure FundClimate ResilienceContracted

$8,420,000

approved

$3,149,906 paid

1 jobs

Horizons Regional Council - Te Pūwaha Lower Whanganui River flood Resilience Strengthening

Horizons Regional Council

The project will upgrade stopbank infrastructure around Whanganui Port and nearby residential, commercial, industrial, local roading network, marae and municipal infrastructure.

Manawatū-Whanganui/HorowhenuaRegional Infrastructure FundClimate ResilienceApproved

$7,875,000

approved

Dargaville Te Kōpuru Stopbank (RIF Tranche 1) - Te Tai Tokerau Water Trust

Te Tai Tokerau Water Trust

The Project is for construction of an approximately 11km stop-bank along the river-right bank of the Wairoa River between Dargaville and Te Kopuru that protects productive land and other assets from a 1 in 100 year flood event

Tai Tokerau/NorthlandRegional Infrastructure FundClimate ResilienceContracted

$7,800,000

approved

0

Tasman CRP - Motueka River Refurbishment

Tasman District Council

To undertake flood resilience upgrade works in the Motueka region.

Te Tauihu/Top of the SouthCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$7,500,000

approved

$7,500,000 paid

0

Nelson CRP - Saxton Creek Upgrade

Nelson City Council

To undertake flood resilience upgrade works in Stoke, Nelson.

Te Tauihu/Top of the SouthCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$7,500,000

approved

$7,500,000 paid

40 jobs

Waipaoa River Flood Control Scheme

Gisborne District Council

To execute a flood management programme, upgrading 15 kilometres of stop banks in critical areas along the Waipaoa River, along with associated structures, access, and remedial works.

Tairāwhiti/East CoastCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$7,500,000

approved

$7,500,000 paid

0

National - Regional Flood Warning Infrastructure Upgrades and Installation

Environment Canterbury

To upgrade and install new and reliable telemetered flood warning infrastructure to provide stronger data and better enable forecasting to reduce the impacts of adverse weather before, during and post flood events.

NationalRegional Infrastructure FundClimate ResilienceApproved

$7,458,000

approved

Environment Canterbury CRP - Region wide river berm transition

Environment Canterbury

To undertake an extensive planting programme across various river berms from Kaikōura to Waitaki including removing exotic non-beneficial invasive plant species, and strengthening waterway edges to improve flood resilience.

CanterburyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$7,123,603

approved

$7,123,603 paid

2593 jobs

Greater Wellington CRP - Major Projects (IRG)

Wellington Regional Council

The project is part of the Greater Wellington Regional Council‘s (GWRC) flood management programme. It includes:1. GWRC4-4, Ruamahanga Lower Wairarapa Valley Development Scheme – The scheme will reinstate a new stop bank at Pukio East, which has been built parallel to an existing stop bank compromised by river bank erosion.2. GWRC3-4, Te Kauru Upper Ruamahanga Flood Management Programme. The project will upgrade the Masterton River Road and landfill bank edge protection.

WellingtonCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$7,096,320

approved

$7,096,320 paid

1009 jobs

Tasman District Council - Lower Motueka River Stopbank Refurbishment

Tasman District Council

To refurbish the Lower Motueka River stopbanks bringing the stopbank network up to a well-maintained condition, including placement of an extra width of compacted clay to the river side of the stopbank and lifting the height of the stopbank to provide protection to an acceptable level and increasing the crest width to allow for safe maintenance vehicle access along the stopbanks, protecting approximately 1,400 hectares of fertile and productive land that surrounds Motueka which houses orchards, homes, farms, and other businesses.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceContracted

$6,600,000

approved

$1,346,403 paid

1 jobs

Manawatū-Whanganui CRP - Palmerston North Flood Protection

Horizons Regional Council

To rebuild stopbanks and strengthen associated structures involving major earth works, drainage work and land reinstatement.

Manawatū-Whanganui/HorowhenuaCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$6,587,569

approved

$6,587,569 paid

679 jobs

West Coast Regional Council - Stopbank - Waiho River Northside Havill Wall Extension and Southside Protection

West Coast Regional Council

To increase and maintain protection on the Waiho River on a "Hold the Line" basis.

West CoastRegional Infrastructure FundClimate ResilienceContracted

$6,000,000

approved

$383,586 paid

0

Environment Canterbury CRP - Rangitata 2019 Flood Recovery

Environment Canterbury

To repair damage done to stop banks during the December 2019 flood event on State Highway 1 and the bridge across the Rangitata River.

CanterburyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$5,400,615

approved

$5,400,615 paid

263 jobs

Nelson City Council - Maitai Flood Management Project

Nelson City Council

To construct flood management infrastructure including rebuild of an existing reinforced concrete intake with connecting culvert upgrade, drainage diversion including intake and discharge structures, flood wall upgrade and approximately 350m of stopbank including potential localised realignment of existing stopbank, riverbank benching and road raising.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceContracted

$5,400,000

approved

$514,982 paid

0

Otago Regional Council - West Taieri Resilience Upgrade

Otago Regional Council

To complete reconstruction for the remaining length of the floodbank, including associated asset renewals, up to three bridges, and further improvements to work completed previously on Stages 1-4 of the Contour Channel, protecting 7300 hectares of farmland and the Dunedin Airport.

OtagoRegional Infrastructure FundClimate ResilienceContracted

$5,400,000

approved

$751,678 paid

0

Buller District Council - Buller River Stopbank Infrastructure

Buller District Council

The project intends to construct infrastructure including flood water drains/gates to enable stopbanks and install water pumps at various sites in Westport

West CoastRegional Infrastructure FundClimate ResilienceApproved

$5,271,735

approved

Waikato Regional Council - Lower Waikato Stopbank Upgrade

Waikato Regional Council

To upgrade up to 13.8km of stopbanks in the Tuakau area on the Lower Waikato River, enabling a one in a hundred year modelled flood protection level.

WaikatoRegional Infrastructure FundClimate ResilienceContracted

$5,220,000

approved

$1,021,422 paid

0

Hawke's Bay CRP - Assess and Enhance Flood Resilience Infrastructure - Upper Tukituki Flood Control

Hawke's Bay Regional Council

A flood management programme involving the removal and stockpile of 800,000m3 of gravel from the Upper Tukituki Flood protection Scheme.

Hawke's BayCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$5,120,000

approved

$5,119,999 paid

Environment Southland CRP - Stead Street Pump Station Replacement

Southland Regional Council

To replace the drainage pump and pipework, and upgrade the pumping station facilities in Invercargill.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$5,098,771

approved

$5,098,771 paid

231 jobs

Kaipara CRP - Raupō Upgrade

Kaipara District Council

To install dual sluice gates and a single floodgate assembly on a canal at Ruawai.

Tai Tokerau/NorthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceContracted

$4,554,110

approved

$4,550,000 paid

Waikato CRP - Fish Passage Pumps

Waikato Regional Council

To upgrade infrastructure critical to flood protection in the Lower Waikato and Hauraki, enabling safe passage of native eels in five priority catchments.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$4,480,000

approved

$4,480,000 paid

397 jobs

Northland CRP - Moerewa

Northland Regional Council

To upgrade the current flood protection facilities for Moerewa township.

Tai Tokerau/NorthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$4,477,687

approved

$4,477,687 paid

915 jobs

Manawatū-Whanganui CRP - Rangitīkeii Scheme Enhancement

Horizons Regional Council

To develop a river park to enhance access to the Rangitikei River close to State Highway 1 near Bulls.

Manawatū-Whanganui/HorowhenuaCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$4,399,999

approved

$4,399,999 paid

325 jobs

Manawatū-Whanganui CRP - Foxton Flood Protection

Horizons Regional Council

To upgrade section of the existing stopbank, to construct surface water drainage system in the eastern catchment area of Foxton and divert the water to the Whirokino drainage scheme.

Manawatū-Whanganui/HorowhenuaCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$4,256,592

approved

$4,256,592 paid

556 jobs

Waikato Regional Council - Lower Piako River Stopbank Upgrades

Waikato Regional Council

Multi-year programme of earthworks to strengthen and raise stopbanks, reshape embankments, and improve drainage infrastructure in and around the townships of Ngatea, Patetonga and Kerepehi.

WaikatoRegional Infrastructure FundClimate ResilienceApproved

$4,200,000

approved

Environment Southland - Invercargill and Oreti Flood Resilience Stopbank Upgrades

Southland Regional Council

Strengthening and remediation of stopbanks in the Invercargill and Oreti flood protection schemes. Key works include site preparation, remediation of contaminated sites, rock armouring, flood wall construction, gravel and vegetation management, and upgrades to the Otepuni and Oreti stopbanks.

SouthlandRegional Infrastructure FundClimate ResilienceApproved

$4,110,000

approved

West Coast CRP - Hokitika Flood and Coastal Erosion Protection

West Coast Regional Council

To construct a 1.4km rock revetment seawall as part of a flood management programme.

West CoastCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$3,750,000

approved

$3,750,000 paid

Otago CRP - West Taieri Contour Channel and Bridges Upgrade

Otago Regional Council

To undertake a flood management programme to renew aging infrastructure, contour channel upgrades and a bridge replacement.

OtagoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$3,667,200

approved

$3,667,200 paid

49 jobs

Greater Wellington CRP - Erosion Projects (IRG)

Wellington Regional Council

This project, GWRC1-4 erosion edge protection, will reinstate sections of eroded bank edge protection works required to maintain the rivers’ design alignment.

WellingtonCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$3,655,680

approved

$3,655,680 paid

1009 jobs

Nelson City Council - Nelson Floods Repairs / Flood Risk Protection

Nelson City Council

To upgrade resilience infrastructure including approximately 50m of stream bank retaining works, stream culvert upgrades, localised stream channel improvements, secondary flowpath diversion works, drainage diversion to new wetland, raising a section of Athol Street to protect residential property, and realigning a section of the stopbank upstream of Glen Road.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceContracted

$3,600,000

approved

$451,519 paid

2 jobs

Marlborough District Council - Lower Wairau Flood Capacity Upgrade

Marlborough District Council

To upgrade over 9km of stopbanks along the Lower Wairau, which is home to an historic Pā site and Māori land, featuring houses and businesses that are disproportionately affected by flooding.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceContracted

$3,600,000

approved

$293,011 paid

3 jobs

Waikato CRP - Erosion Protection in the Catchments of Lower Waikato Lakes and Wetlands

Waikato Regional Council

To restore natural water ways, improving capacity to manage water runoff, and extensive planting of native plant species along water ways.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$3,362,770

approved

$3,362,770 paid

450 jobs

Bay of Plenty Regional Council -Rangitāiki-Tarawera Rivers Scheme Flood Resilience Improvements

Bay of Plenty Regional Council

Upgrades to stopbanks and canals across several river sections, including geotechnical investigations, detailed design, and construction works at Kōkōhinau, the Tarawera River, Rangitāiki River, and Rangitāiki Canals.

Bay of PlentyRegional Infrastructure FundClimate ResilienceApproved

$3,120,000

approved

Waikato Regional Council - Kirikiri Stopbank Upgrade

Waikato Regional Council

To upgrade 3.7km of stopbanks that run from the mouth of the Kirikiri Stream to the SH26 Bridge just south of Kōpū, enabling a one in a hundred year flood protection level.

WaikatoRegional Infrastructure FundClimate ResilienceComplete

$3,060,000

approved

$1,383,575 paid

Marlborough CRP - Wairau River Flood Protection Scheme

Marlborough District Council

To construct flood protection works to mitigate flood risk causing damage to land and infrastructure in the Marlborough region.

Te Tauihu/Top of the SouthCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$3,000,000

approved

$3,000,000 paid

93 jobs

Environment Southland - Oreti River Catchment Flood Protection Upgrade

Southland Regional Council

To improve the resilience of the current assets, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.

SouthlandRegional Infrastructure FundClimate ResilienceContracted

$3,000,000

approved

$129,923 paid

0

Marlborough District Council - Wairau River Flood Protection Scheme

Marlborough District Council

To undertake stopbank retreat and realignment work, construction of new intermediate groynes, rock edge protection at the Waihopai/Wairau confluence, and upgrade of a critical Waihopai stopbank that overtopped in the 2021 flood event.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceContracted

$2,880,000

approved

$448,382 paid

3 jobs

Environment Southland CRP - Wyndham Stopbank Upgrade

Southland Regional Council

To upgrade the stopbank along the section of the Mataura River passing through Wyndham, increasing it's strength and height.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$2,692,441

approved

$2,692,441 paid

146 jobs

Bay of Plenty Regional Council - Whakatāne River Flood Resilience Infrastructure Upgrades

Bay of Plenty Regional Council

Repairing and strengthening stopbanks, replacing culverts, and implementing seepage control measures at key sites such as Trident Stopbank, Awatapu Lagoon, and the Whakatāne Canals.

Bay of PlentyRegional Infrastructure FundClimate ResilienceApproved

$2,640,000

approved

Waikato CRP - Piako River Mouth, Right Bank Asset Rationalisation

Waikato Regional Council

To future proof the pump station foundation and upgrade access, relocate three underperforming floodgates to alternative locations for greater flood resilience, and rationalisation of aging stopbanks.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$2,638,416

approved

$2,638,416 paid

48 jobs

Environment Southland CRP - Gore Stopbank Upgrade

Southland Regional Council

To upgrade the stopbank along the section of the Mataura River passing through Gore District, increasing it's strength and height.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$2,561,038

approved

$2,561,038 paid

138 jobs

Waikato Regional Council - Waikato, Waipa and West Coast Erosion and Sediment Reduction

Waikato Regional Council

Strengthening natural riverbanks and reducing sedimentation across the Lower Waikato, Waipa, and West Coast catchments. Works include erosion control, bank stabilisation, and sediment removal to improve waterway capacity and resilience.

WaikatoRegional Infrastructure FundClimate ResilienceApproved

$2,502,000

approved

GWRC - Ōtaki - Site 9 - Ōtaki Cliffs, Ōtaki Awa

Wellington Regional Council

To construct erosion protection along the True Left Bank of the Ōtaki Awa, protecting the base of the Ōtaki cliffs to limit further erosion in line with the recommendations of the Ōtaki Floodplain Management Plan.

KāpitiRegional Infrastructure FundClimate ResilienceContracted

$2,500,000

approved

$310,702 paid

0

Environment Canterbury - Regional Infrastructure Upgrades and Adaptation Programme #2

Environment Canterbury

Surveying, geotechnical investigations, and design work to support the construction of upgraded stopbanks and associated flood infrastructure across multiple sites including Tinwald, Lake Hood, Rangitata, and Staverly.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$2,400,000

approved

West Coast Regional Council - Greymouth Flood Resilience Upgrades Stages 2/4/5

West Coast Regional Council

Develop new and upgrade existing stopbanks across Greymouth township including Blaketown and Cobden. Works will provide increased protection to residential, commercial, industrial, state highway and local roading networks, rail, schools, aerodrome and municipal infrastructure.

West CoastRegional Infrastructure FundClimate ResilienceApproved

$2,400,000

approved

Environment Canterbury - Waitarakao / Washdyke / Seadown Works

Environment Canterbury

To upgrade the stopbank and drainage network, including investigations, consenting, drain relocation and retreat, stopbank rebuild, wetland creation and enhancement, and planting which will protect the Timaru waste water treatment plant, large industrial area, roading infrastructure and private land.

CanterburyRegional Infrastructure FundClimate ResilienceContracted

$2,400,000

approved

$95,495 paid

2 jobs

West Coast Regional Council - Hokitika Stopbank Construction Stage 3

West Coast Regional Council

Upgrade existing stopbanks to provide increased protection to agricultural, horticultural and residential, assets, state highway and local roading networks, schools, aerodrome and municipal infrastructure.

West CoastRegional Infrastructure FundClimate ResilienceApproved

$2,400,000

approved

GWRC - Site 15 - Upper Buffer Establishment

Wellington Regional Council

To fence each site and plant native and exotic fauna at the river edge and complete maintenance of fenced and planted areas.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$2,160,000

approved

$113,400 paid

0

GWRC - Site 2 - River Road, Masterton, Stage 3, Ruamāhanga Awa

Wellington Regional Council

To construct erosion protection along the True Right Bank of the Ruamāhanga Awa, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceComplete

$2,110,000

approved

$2,004,500 paid

Environment Canterbury - Waimakariri River Flood Resilience Infrastructure Upgrades

Environment Canterbury

Stopbank construction and infrastructure protection around Kaiapoi, supported with technical investigations and design. The scope includes rail and school infrastructure and coordination with municipal services.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$2,100,000

approved

Environment Canterbury - Ashburton River / Hakatere Flood Resilience Infrastructure Upgrades

Environment Canterbury

Technical investigations and design to upgrade flood protection infrastructure around Ashburton. This encompasses surveying and geotechnical work to inform construction of stopbanks and protective works for roads, schools, and medical facilities.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$2,100,000

approved

Bay of Plenty Regional Council - Ohineangaanga Stream Erosion Protection Works

Bay of Plenty Regional Council

Reinforcing stream banks in Te Puke through stopbank upgrades, using rock and sheet pile materials. The works are designed to stabilise erosion-prone areas.

Bay of PlentyRegional Infrastructure FundClimate ResilienceApproved

$1,980,000

approved

West Coast CRP - Māwhera Quay Flood Protection Wall upgrade Stage 2

West Coast Regional Council

To complete Stage Two of the Greymouth Floodwall upgrade to a 1 in 150-year Annual Exceedance Probability standard.

West CoastCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,954,365

approved

$1,954,365 paid

Waikato CRP - Foreshore East and West Stopbank

Waikato Regional Council

To restore and strengthen existing stopbanks along the east and west foreshore to protect the Hauraki Plains and restore drainage and fencing along waterways.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,920,000

approved

$1,920,000 paid

27 jobs

Vessel Construction for Waikato River Management

Waikato Regional Council

To construct a new replacement barge for use along Waikato River system, which is a critical infrastructure asset required for effective river management activities.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,920,000

approved

$1,920,000 paid

64 jobs

Nelson City Council - Jenkins Creek Flood Resilience Improvements

Nelson City Council

The project aims to upgrade stopbanks and associated flood resilience infrastructure around Jenkins Creek to increase protection to commercial/industrial assets, state highway and local roading networks, Nelson Airport, and municipal infrastructure.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceApproved

$1,800,000

approved

Environment Canterbury - Rangitata Flood and Resilience #2

Environment Canterbury

To increase flood resilience in Rangitata including investigations, land purchasing, stopbanks, rock, planting, wetlands, diversions and river works.

CanterburyRegional Infrastructure FundClimate ResilienceContracted

$1,800,000

approved

$108,459 paid

0

Waikato Regional Council - Coromandel Peninsula Flood Resilience Infrastructure Upgrades

Waikato Regional Council

Erosion control and streambank stabilisation across multiple sites. Activities include installing rock spalls, riprap, steel piping, and geotextiles, removing storm debris and blockages, and implementing fencing and planting to protect completed works.

WaikatoRegional Infrastructure FundClimate ResilienceApproved

$1,680,000

approved

Waikato Regional Council - Island Block Pump Station

Waikato Regional Council

To upgrade flood pump capacity with the replacement of two 1960s flood pumps with one Archimedes screw pump, meeting climate change mitigation needs and providing fish passage.

WaikatoRegional Infrastructure FundClimate ResilienceContracted

$1,680,000

approved

2 jobs

Northland Regional Council - Lower Whangatane Spillway Stopbank Setback

Northland Regional Council

The project aims to reposition the Lower Whangatane Spillway stopbank at the Quarry Road Bridge area near Kaitāia to increase capacity of flood spillway.

Tai Tokerau/NorthlandRegional Infrastructure FundClimate ResilienceApproved

$1,501,200

approved

Environment Canterbury - Structure Upgrades / Adaptation Works

Environment Canterbury

To upgrade and adapt critical and aged flood protection infrastructure including investigations, monitoring, capital upgrades and fish passage enhancements across Kaiapoi, Ashley/Rakahuri, Waimakariri, Ashburton, Orari, Saltwater creek, and Waimate.

CanterburyRegional Infrastructure FundClimate ResilienceContracted

$1,500,000

approved

$409,712 paid

7 jobs

Environment Canterbury - Ashley River / Rakahuri Flood Resilience Infrastructure Upgrades

Environment Canterbury

Detailed surveying and geotechnical analysis to support the construction of stopbanks and flood infrastructure around Rangiora and Kaiapoi. The technical works also include design services and stakeholder coordination to ensure protection of energy assets, marae, and retirement facilities.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$1,500,000

approved

Environment Southland CRP - Mataura Town Stopbanks (IRG)

Southland Regional Council

To upgrade the stopbank along the section of the Mataura River passing through Mataura, increasing it's strength and height.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,481,087

approved

$1,481,087 paid

122 jobs

GWRC - Site 1 - River Road, Masterton Stage 2, Ruamāhanga Awa

Wellington Regional Council

To construct erosion protection along the True Right Bank of the Ruamāhanga Awa, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceComplete

$1,480,000

approved

$1,406,000 paid

Environment Canterbury CRP - Waimakariri River – McIntosh’s Bend - Kaiapoi Community Flood Protection Project (IRG)

Environment Canterbury

This project is a flood management programme that will strengthen existing stopbanks and flood defences at McIntosh’s Bend where a local weakness exists.

CanterburyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,477,649

approved

$1,477,649 paid

91 jobs

Kaipara CRP - Dargaville to Te Kōpuru Stopbank

Kaipara District Council

To upgrade the existing 10.7 kilometre stopbank from Dargaville to Te Kopuru.

Tai Tokerau/NorthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,445,890

approved

$1,445,890 paid

17 jobs

Environment Southland CRP - Invercargill Stopbank Upgrade

Southland Regional Council

To upgrade the stopbank along the section of the Otepuni Creek and Waihopai River passing through Invercargill District, increasing it's strength and height.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,444,467

approved

$1,444,467 paid

81 jobs

GWRC - Waiōhine - Site 5 - Fullers Bend, Waiōhine Awa

Wellington Regional Council

To construct erosion protection along the True Right Bank of the Waiōhine Awa at Fullers Bend, providing erosion migration, minimising avulsion risk, and increasing resilience in line with the recommendations of the Waiōhine Rakahanga River Plan.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$1,390,000

approved

$347,500 paid

0

Bay of Plenty Regional Council - Ōpōtiki Township Stopbank Flood Resilience Improvements

Bay of Plenty Regional Council

Design and construction of upgrades stopbanks, including geotechnical investigations, procurement of construction materials, and civil engineering activities to build protection infrastructure

Bay of PlentyRegional Infrastructure FundClimate ResilienceApproved

$1,380,000

approved

Waikato CRP - Mill Road Pump Station (IRG)

Waikato Regional Council

This project will upgrade the Mill Road Pumps stations. These assets protect the Paeroa community from flooding, but are one of the highest risk rated assets due to the importance of urban protection.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,303,040

approved

$1,303,040 paid

23 jobs

Waikato CRP - Roger Harris Pump-station Upgrade

Waikato Regional Council

To upgrade Roger Harris pump station, to ensure the pumping capacity of the Mill Road Pump Station function to protect Paeroa from flooding.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$1,204,444

approved

$1,204,444 paid

214 jobs

Bay of Plenty Regional Council - Waioeka Otara Rivers Scheme Stopbank Upgrades

Bay of Plenty Regional Council

To upgrade existing stopbanks and floodwalls of the rivers to meet one in a hundred year levels of flood protection and provide mitigation for climate change.

Bay of PlentyRegional Infrastructure FundClimate ResilienceContracted

$1,200,000

approved

$230,466 paid

2 jobs

Otago Regional Council - Puerua Outfall Structure Upgrades

Otago Regional Council

Two-stage upgrade involving culvert installation and training line strengthening on the Lower Clutha, increasing levels of protection to Balclutha and Kaitangata

OtagoRegional Infrastructure FundClimate ResilienceApproved

$1,200,000

approved

Waikato Regional Council - Lower Waikato Floodgate Programme

Waikato Regional Council

To upgrade assets east of Huntly in the Mangawara catchment, providing ongoing critical flood defences in the area, making them safer to operate in times of flood, and enabling the removal of floodwater from behind the stopbanks.

WaikatoRegional Infrastructure FundClimate ResilienceContracted

$1,200,000

approved

$477,348 paid

0

Waikato Regional Council - Thames Valley Diversion Channel Upgrade

Waikato Regional Council

To fence, shape, and plant drainage channels to address the significant bank erosion and slumping of drains following the 2022/23 floods and heavy rainfall, ensuring effective operation of the land drainage network to clear surface water, reducing potential damage to pasture and crops, and reducing the overall sediment release into the Piako and Waihou river systems.

WaikatoRegional Infrastructure FundClimate ResilienceContracted

$1,080,000

approved

$171,041 paid

0

Environment Canterbury - Orari River Flood Resilience Infrastructure Upgrades

Environment Canterbury

Technical design and geotechnical work to enable construction of stopbanks and protective infrastructure across Geraldine, Temuka, Pleasant Point, and Levels Plains. The works also involve bridge protection.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$1,050,000

approved

GWRC - Site 10 - Tawaha Sill, Ruamāhanga Awa

Wellington Regional Council

To upgrade the current sill at the Tawaha Floodway which crosses State Highway 53 at Jenkins Dip, which currently does not provide a consistent spill from the river in flood conditions.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$1,020,000

approved

$51,000 paid

2 jobs

Otago Regional Council - East Taieri Lower Pond Structure Upgrades

Otago Regional Council

Design and construction of upgraded stopbanks and flood infrastructure to improve protection for the Lower Taieri flood scheme. Works include earthworks and concrete structures.

OtagoRegional Infrastructure FundClimate ResilienceApproved

$1,020,000

approved

Otago Regional Council - Riverbank Rd Flood Risk Mitigation

Otago Regional Council

Sediment removal and bank repairs to improve flow capacity of the Clutha River (Matau branch), including fencing and earthworks.

OtagoRegional Infrastructure FundClimate ResilienceApproved

$960,000

approved

GWRC - Waingawa - Site 8 - Waingawa River Hood Aerodrome

Wellington Regional Council

To construct erosion protection along the True Left Bank of the Waingawa Awa, protecting the southern end of the Hood Aerodrome runway.

WairarapaRegional Infrastructure FundClimate ResilienceComplete

$950,000

approved

$142,500 paid

Environment Canterbury CRP - Ashley Rakahuri River Protection and Fairway Management

Environment Canterbury

To undertake a flood management programme to remove vegetation that is currently choking the river causing it to spread laterally resulting in erosion and loss of productive farmland.

CanterburyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$923,789

approved

$923,789 paid

262 jobs

Tasman District Council - Peach Island Stopbank Repair

Tasman District Council

To repair vulnerable sections of stopbanks protecting Peach Island along the Motueka River and complete upgrade work necessary to safely maintain these stopbanks on an ongoing basis, protecting approximately 170 hectares of fertile and productive land, and approximately 15 homes and ancillary structures.

Te Tauihu/Top of the SouthRegional Infrastructure FundClimate ResilienceContracted

$900,000

approved

$28,398 paid

0

Environment Canterbury - Kaikōura Flood Resilience Infrastructure Upgrades

Environment Canterbury

Berm strengthening supported by surveying and geotechnical investigations. Design work underpins infrastructure upgrades for rail, bridges, and schools in the Kaikōura area

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$900,000

approved

GWRC - Waipōua - Site 4 - Waipōua Industrial Site - Akura Road, Waipōua Awa

Wellington Regional Council

To construct erosion protection along the True Right Bank of the Waipōua Awa, providing erosion migration at the approach to the State Highway 2 Bridge and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceComplete

$880,000

approved

$836,000 paid

GWRC - Whakawhiriwhiri - Site 16 - Whakawhiriwhiri Stream - project re-scope, Whakawhiriwhiri Awa

Wellington Regional Council

To widen scope of planned resilience works addressing the low capacity of the stream to convey the ponded water, causing flooding to surrounding landowners.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$860,000

approved

$43,000 paid

0

Otago CRP - Outram Flood Protection (IRG)

Otago Regional Council

This project is a flood management programme, which will constructing a weighting blanket, seal or replace culvert, construct bottom storm water drains and refill weak zones caused by tree roots.

OtagoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$812,800

approved

$812,800 paid

22 jobs

Waikato CRP - Piako River, Ngatea Town Left Stopbank (IRG)

Waikato Regional Council

This project will increase the height and strength of stop bank on the left bank at Ngatea, and the last remaining sections of non-compliant stop bank between Ngatea and Pipiroa along the right and left banks.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$768,000

approved

$768,000 paid

55 jobs

Environment Canterbury - Ōpihi River Flood Resilience Infrastructure Upgrades

Environment Canterbury

Technical surveying and geotechnical investigations to guide the construction of stopbanks and flood protection measures near Fairlie. Design work supports infrastructure upgrades near roads, schools, and municipal assets.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$750,000

approved

Hawke's Bay CRP - Upper Tukituki Flood Control Scheme - SH50 Bridge (IRG)

Hawke's Bay Regional Council

A flood management programme to construct soft and hard edge river bank protection and protection to the abutment to State Highway 50 Waipawa Bridge.

Hawke's BayCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$640,000

approved

$640,000 paid

Hawke's Bay CRP - Wairoa River Scheme - River Parade Scour Protection

Hawke's Bay Regional Council

This project is a flood management programme comprising activities to protect Wairoa River Bank from erosion, which is an imminent threat to infrastructure and property. Protection will be provided by construction of a sheet pile wall and reinstatement planting, and restoration work.

Hawke's BayCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$640,000

approved

$640,000 paid

137 jobs

Otago CRP - Riverbank Road Flood Protection, Lower Clutha. Stabilising critical flood protection infrastructure for Clutha Delta area (IRG)

Otago Regional Council

This project is a flood management programme that involves repair work for 150m of stabilisation on steep bank then reinstatement of road along the Clutha River stop bank

OtagoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$608,000

approved

$608,000 paid

25 jobs

Environment Canterbury - Pareora River Flood Resilience Infrastructure Upgrades

Environment Canterbury

Surveying, geotechnical analysis, and design to support rural flood protection works, including stopbank upgrades and safeguarding of agricultural land and road networks in the Pareora area.

CanterburyRegional Infrastructure FundClimate ResilienceApproved

$600,000

approved

Otago Regional Council - Puerua Flood Protection Strengthening

Otago Regional Council

Upgrade and repair stopbanks and associated flood resilience infrastructure around the Paretai area between the Clutha River Koau Branch and the Puerua River.

OtagoRegional Infrastructure FundClimate ResilienceApproved

$600,000

approved

Environment Southland CRP - Waiau Flood Repairs (IRG)

Southland Regional Council

The project will repair damaged /eroded river bank, placing protective material to mitigate risk of erosion due to the Nov/ Dec 2019 floods, erosion has caused large areas of riverbank throughout the lower Waiau to erode away sending sediment down to the lagoon at the estuary.

SouthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$597,197

approved

$597,197 paid

36 jobs

GWRC - Waingawa - Site 7 - Masterton Raw Water Supply, Waingawa Awa

Wellington Regional Council

To construct erosion protection along the True Left Bank of the Waingawa Awa, protecting a water supply, controlling erosion, and increasing resilience in line with the recommendations of the Upper Waingawa Awa portion of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$570,000

approved

$142,500 paid

0

Environment Canterbury CRP - Waiau Township Stopbank Repairs and Upgrades (IRG)

Environment Canterbury

This project is a flood management programme, which will repair and upgrade the Waiau River stopbank.

CanterburyCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$562,343

approved

$562,343 paid

155 jobs

GWRC - Site 11 - Pukio East Stopbank

Wellington Regional Council

To remove the redundant stopbank, allowing the river more room which will reduce flooding.

WairarapaRegional Infrastructure FundClimate ResilienceComplete

$540,000

approved

$513,000 paid

GWRC - Site 6 - Awaroa Sill, Ruamāhanga Awa

Wellington Regional Council

To construct erosion protection along the True Right Bank of the Ruamāhanga Awa, including retreating the spillway sill and fences to limit further lateral movement of the active channel, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$530,000

approved

$51,000 paid

0

GWRC - Waingawa - Site 13 - South Masterton Stopbank, Waingawa Awa

Wellington Regional Council

To augment and reline the riverside face of the existing stopbank structure along the True Left Bank of the Waingawa Awa, reducing the flood risk to the southern section of Masterton in line with the recommendations of the Waingawa Awa portion of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$520,000

approved

$26,000 paid

0

Otago Regional Council - Silver Stream Capacity Improvements

Otago Regional Council

Upgrade stopbanks and associated earthworks for the Silver Stream, increasing the levels of protection to Mosgiel and East Taieri.

OtagoRegional Infrastructure FundClimate ResilienceApproved

$480,000

approved

Waikato CRP - Lake Kimihia, Ecological and Cultural Enhancement

Waikato Regional Council

To improve access to the sites, construct two culverts and complete works including rock protection, vegetation clearance, cultural assessment and planting, pest fish barrier, vegetative pest control and wetland restoration.

WaikatoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$451,330

approved

$451,330 paid

5 jobs

Otago Regional Council - Kaitangata Floodbank Reconstruction

Otago Regional Council

Upgrade and reconstruct stopbank infrastructure, providing increased levels of protection to Kaitangata.

OtagoRegional Infrastructure FundClimate ResilienceApproved

$420,000

approved

West Coast CRP - Buller River Flood warning system

West Coast Regional Council

To install and operate a new flood warning system in the Buller River catchment.

West CoastCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$370,634

approved

$370,634 paid

Northland CRP - Panguru (IRG)

Northland Regional Council

The project will provide funding to complete a flood management programme, which is a joint venture between the New Zealand Transport Agency (NZTA) and the Far North District Council. The project is 90% completed, but was interrupted by the COVID-19 lockdown.

Tai Tokerau/NorthlandCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$361,683

approved

$361,683 paid

14 jobs

Northland Regional Council - Quarry Road - Phase 2

Northland Regional Council

To reinstate the bridge and strengthen stopbanks either side.

Tai Tokerau/NorthlandRegional Infrastructure FundClimate ResilienceComplete

$360,000

approved

$360,000 paid

Otago CRP - Upgrade and Installation of ORC Flow Management Structures at Robson Lagoon (IRG)

Otago Regional Council

To upgrade and install of flow management structures, which are critical for flood management to preserve the natural values of Robsons Lagoon and the Lake Tuakitoto.

OtagoCOVID-19: Infrastructure Investment (CRRF)Climate ResilienceComplete

$352,000

approved

$351,999 paid

19 jobs

Waikato Regional Council - Mangatawhiri Pumpstation Infrastructure

Waikato Regional Council

To replace dual inlet at the pump station and the construction of an isolation gate enabling access to the pump for maintenance, including a platform, inlet and screen replacements.

WaikatoRegional Infrastructure FundClimate ResilienceContracted

$324,000

approved

$154,654 paid

0

Environment Southland - Aparima Catchment Flood Protection Upgrade

Southland Regional Council

To improve resilience of the current assets protecting the Otautau community, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.

SouthlandRegional Infrastructure FundClimate ResilienceComplete

$300,000

approved

$300,000 paid

Northland Regional Council - Quarry Road - Phase 1

Northland Regional Council

To protect Quarry Road bridge from flood waters eroding the deflection bank and structural support of the bridge.

Tai Tokerau/NorthlandRegional Infrastructure FundClimate ResilienceComplete

$300,000

approved

$300,000 paid

Environment Southland - Te Anau Basin Catchment Flood Management Upgrade

Southland Regional Council

To improve the resilience of the current assets, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.

SouthlandRegional Infrastructure FundClimate ResilienceContracted

$300,000

approved

$131,094 paid

0

GWRC - Site 14 - Homebush Wastewater Treatment Plant Resilience works

Wellington Regional Council

To lift the headwork above flood levels protecting the function of the wastewater treatment plant.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$270,000

approved

$27,000 paid

0

GWRC - Fish Passages - Site 12 - Fish Passage upgrades

Wellington Regional Council

To enhance fish passage by developing and rehabilitating structures that are crucial for flood protection, including adapting grade control structures, installing fish-friendly flap gates, replacing existing infrastructure with fish-friendly alternatives, and improving overall flood resilience.

WairarapaRegional Infrastructure FundClimate ResilienceContracted

$220,000

approved

$55,000 paid

0

GWRC - Waipōua - Site 3 - Waipōua SH2 bridge Left bank protection, Waipōua Awa

Wellington Regional Council

To construct erosion protection along the True Left Bank of the Waipōua Awa, providing erosion migration at the approach to the State Highway 2 Bridge and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.

WairarapaRegional Infrastructure FundClimate ResilienceComplete

$80,000

approved

$76,000 paid