Funding Projects
124 projects funded through Kanoa programmes
Showing 124 of 124 projects
Bay of Plenty CRP - Bay of Plenty River Schemes - Flood Resilience Project
Bay of Plenty Regional CouncilTo undertake civil works construction, design, modelling, project management, land purchase, tree removal and native planting work in the Lower Kaituna, Ngongotahā Stream, Rangitāiki and Whakatāne Rivers and the Waioeka River.
$12,900,000
approved
$11,528,834 paid
436 jobs
Hawke's Bay CRP - Assess and Enhance Flood Resilience Infrastructure - Heretaunga Plains
Hawke's Bay Regional CouncilA flood management programme to construct and strengthen stop banks on the Tutaekuri, Ngaruroro and Clive Rivers areas within the Heretaunga Plains Flood Control Scheme.
$12,800,000
approved
$12,800,000 paid
20 jobs
Manawatū-Whanganui CRP - Lower Manawatu Scheme Resilience
Horizons Regional CouncilTo upgrade 25 km of stop banks across the Lower Manawatū River flood Plain area.
$11,680,457
approved
$11,680,457 paid
785 jobs
Invercargill CRP - Stead Street Stop Bank - Upgrade (IRG)
Invercargill City CouncilTo facilitate improvements to Invercargill's climate resilience by improving infrastructure in and around waterways, raising of stopbanks, and development of soft and riparian infrastructure.
$10,800,000
approved
$10,759,571 paid
14 jobs
Environment Southland - Mataura River Flood Protection Improvements (Gore and Mataura)
Southland Regional CouncilIncludes gravel realignment and extraction, rock wall and stopbank extension and strengthening, and construction of new floodbanks. It also includes data validation, land access agreements, and flood protection works along the Gore and Mataura rivers.
$10,800,000
approved
Bay of Plenty Regional Council - Project Future Proof Whakatāne-Tauranga Rivers Scheme
Bay of Plenty Regional CouncilTo upgrade existing stopbanks and floodwalls in the Whakatane CBD to meet one in a hundred year levels of flood protection and provide mitigation for climate change.
$10,690,000
approved
$1,426,287 paid
7 jobs
Bay of Plenty CRP - Rangitāiki River - Flood & Spillway Protection Edgecumbe
Bay of Plenty Regional CouncilTo increase the capacity of the Rangitāiki River spillway through diversion of flood flows from the river by increasing flooding capacity and construction of a spillway upstream of Edgecumbe as part of a larger flood management programme.
$10,275,000
approved
$10,275,000 paid
257 jobs
Marlborough District Council - Lower Wairau Stopbank Upgrades
Marlborough District CouncilThe project aims to upgrade and realign stopbanks at the narrowest point of the Lower Wairau river, increasing protection to agricultural/horticultural assets, residential and commercial, state highway and local roading networks, rail, energy, schools and municipal infrastructure.
$10,200,000
approved
Tasman District Council - Lower Motueka River Stopbanks Level of Service Upgrade
Tasman District CouncilThe project aims to construct new – and upgrade existing – stopbanks and associated flood resilience infrastructure at the Lower Motueka River (near Motueka) increasing protection to agricultural/horticultural assets, residential, commercial and industrial, state highway and local roading networks, aerodrome, port, schools, bridges, a crop and food research facility and municipal infrastructure.
$9,480,000
approved
West Coast CRP - Waiho River Stopbank Protection Phase 1
West Coast Regional CouncilTo improve flood protection and through the upgrade of existing and construction of new stopbank along the Waiho River.
$9,225,000
approved
$9,218,597 paid
Northland CRP - Awanui Scheme Upgrade
Northland Regional CouncilTo upgrade the current flood protection facilities in Awanui, Kaitāia.
$8,510,630
approved
$8,510,630 paid
1003 jobs
Bay of Plenty Regional Council - Kaituna Catchment Control Scheme Upgrades
Bay of Plenty Regional CouncilTo upgrade flood protection for Te Puke and wider Kaituna catchment with installation of replacement pump station for Ford Road, a new pump station downstream of the Te Puke township and Kaituna Catchment Control Scheme Stopbank Upgrades.
$8,420,000
approved
$3,149,906 paid
1 jobs
Horizons Regional Council - Te Pūwaha Lower Whanganui River flood Resilience Strengthening
Horizons Regional CouncilThe project will upgrade stopbank infrastructure around Whanganui Port and nearby residential, commercial, industrial, local roading network, marae and municipal infrastructure.
$7,875,000
approved
Dargaville Te Kōpuru Stopbank (RIF Tranche 1) - Te Tai Tokerau Water Trust
Te Tai Tokerau Water TrustThe Project is for construction of an approximately 11km stop-bank along the river-right bank of the Wairoa River between Dargaville and Te Kopuru that protects productive land and other assets from a 1 in 100 year flood event
$7,800,000
approved
0Tasman CRP - Motueka River Refurbishment
Tasman District CouncilTo undertake flood resilience upgrade works in the Motueka region.
$7,500,000
approved
$7,500,000 paid
0Nelson CRP - Saxton Creek Upgrade
Nelson City CouncilTo undertake flood resilience upgrade works in Stoke, Nelson.
$7,500,000
approved
$7,500,000 paid
40 jobs
Waipaoa River Flood Control Scheme
Gisborne District CouncilTo execute a flood management programme, upgrading 15 kilometres of stop banks in critical areas along the Waipaoa River, along with associated structures, access, and remedial works.
$7,500,000
approved
$7,500,000 paid
0National - Regional Flood Warning Infrastructure Upgrades and Installation
Environment CanterburyTo upgrade and install new and reliable telemetered flood warning infrastructure to provide stronger data and better enable forecasting to reduce the impacts of adverse weather before, during and post flood events.
$7,458,000
approved
Environment Canterbury CRP - Region wide river berm transition
Environment CanterburyTo undertake an extensive planting programme across various river berms from Kaikōura to Waitaki including removing exotic non-beneficial invasive plant species, and strengthening waterway edges to improve flood resilience.
$7,123,603
approved
$7,123,603 paid
2593 jobs
Greater Wellington CRP - Major Projects (IRG)
Wellington Regional CouncilThe project is part of the Greater Wellington Regional Council‘s (GWRC) flood management programme. It includes:1. GWRC4-4, Ruamahanga Lower Wairarapa Valley Development Scheme – The scheme will reinstate a new stop bank at Pukio East, which has been built parallel to an existing stop bank compromised by river bank erosion.2. GWRC3-4, Te Kauru Upper Ruamahanga Flood Management Programme. The project will upgrade the Masterton River Road and landfill bank edge protection.
$7,096,320
approved
$7,096,320 paid
1009 jobs
Tasman District Council - Lower Motueka River Stopbank Refurbishment
Tasman District CouncilTo refurbish the Lower Motueka River stopbanks bringing the stopbank network up to a well-maintained condition, including placement of an extra width of compacted clay to the river side of the stopbank and lifting the height of the stopbank to provide protection to an acceptable level and increasing the crest width to allow for safe maintenance vehicle access along the stopbanks, protecting approximately 1,400 hectares of fertile and productive land that surrounds Motueka which houses orchards, homes, farms, and other businesses.
$6,600,000
approved
$1,346,403 paid
1 jobs
Manawatū-Whanganui CRP - Palmerston North Flood Protection
Horizons Regional CouncilTo rebuild stopbanks and strengthen associated structures involving major earth works, drainage work and land reinstatement.
$6,587,569
approved
$6,587,569 paid
679 jobs
West Coast Regional Council - Stopbank - Waiho River Northside Havill Wall Extension and Southside Protection
West Coast Regional CouncilTo increase and maintain protection on the Waiho River on a "Hold the Line" basis.
$6,000,000
approved
$383,586 paid
0Environment Canterbury CRP - Rangitata 2019 Flood Recovery
Environment CanterburyTo repair damage done to stop banks during the December 2019 flood event on State Highway 1 and the bridge across the Rangitata River.
$5,400,615
approved
$5,400,615 paid
263 jobs
Nelson City Council - Maitai Flood Management Project
Nelson City CouncilTo construct flood management infrastructure including rebuild of an existing reinforced concrete intake with connecting culvert upgrade, drainage diversion including intake and discharge structures, flood wall upgrade and approximately 350m of stopbank including potential localised realignment of existing stopbank, riverbank benching and road raising.
$5,400,000
approved
$514,982 paid
0Otago Regional Council - West Taieri Resilience Upgrade
Otago Regional CouncilTo complete reconstruction for the remaining length of the floodbank, including associated asset renewals, up to three bridges, and further improvements to work completed previously on Stages 1-4 of the Contour Channel, protecting 7300 hectares of farmland and the Dunedin Airport.
$5,400,000
approved
$751,678 paid
0Buller District Council - Buller River Stopbank Infrastructure
Buller District CouncilThe project intends to construct infrastructure including flood water drains/gates to enable stopbanks and install water pumps at various sites in Westport
$5,271,735
approved
Waikato Regional Council - Lower Waikato Stopbank Upgrade
Waikato Regional CouncilTo upgrade up to 13.8km of stopbanks in the Tuakau area on the Lower Waikato River, enabling a one in a hundred year modelled flood protection level.
$5,220,000
approved
$1,021,422 paid
0Hawke's Bay CRP - Assess and Enhance Flood Resilience Infrastructure - Upper Tukituki Flood Control
Hawke's Bay Regional CouncilA flood management programme involving the removal and stockpile of 800,000m3 of gravel from the Upper Tukituki Flood protection Scheme.
$5,120,000
approved
$5,119,999 paid
Environment Southland CRP - Stead Street Pump Station Replacement
Southland Regional CouncilTo replace the drainage pump and pipework, and upgrade the pumping station facilities in Invercargill.
$5,098,771
approved
$5,098,771 paid
231 jobs
Kaipara CRP - Raupō Upgrade
Kaipara District CouncilTo install dual sluice gates and a single floodgate assembly on a canal at Ruawai.
$4,554,110
approved
$4,550,000 paid
Waikato CRP - Fish Passage Pumps
Waikato Regional CouncilTo upgrade infrastructure critical to flood protection in the Lower Waikato and Hauraki, enabling safe passage of native eels in five priority catchments.
$4,480,000
approved
$4,480,000 paid
397 jobs
Northland CRP - Moerewa
Northland Regional CouncilTo upgrade the current flood protection facilities for Moerewa township.
$4,477,687
approved
$4,477,687 paid
915 jobs
Manawatū-Whanganui CRP - Rangitīkeii Scheme Enhancement
Horizons Regional CouncilTo develop a river park to enhance access to the Rangitikei River close to State Highway 1 near Bulls.
$4,399,999
approved
$4,399,999 paid
325 jobs
Manawatū-Whanganui CRP - Foxton Flood Protection
Horizons Regional CouncilTo upgrade section of the existing stopbank, to construct surface water drainage system in the eastern catchment area of Foxton and divert the water to the Whirokino drainage scheme.
$4,256,592
approved
$4,256,592 paid
556 jobs
Waikato Regional Council - Lower Piako River Stopbank Upgrades
Waikato Regional CouncilMulti-year programme of earthworks to strengthen and raise stopbanks, reshape embankments, and improve drainage infrastructure in and around the townships of Ngatea, Patetonga and Kerepehi.
$4,200,000
approved
Environment Southland - Invercargill and Oreti Flood Resilience Stopbank Upgrades
Southland Regional CouncilStrengthening and remediation of stopbanks in the Invercargill and Oreti flood protection schemes. Key works include site preparation, remediation of contaminated sites, rock armouring, flood wall construction, gravel and vegetation management, and upgrades to the Otepuni and Oreti stopbanks.
$4,110,000
approved
West Coast CRP - Hokitika Flood and Coastal Erosion Protection
West Coast Regional CouncilTo construct a 1.4km rock revetment seawall as part of a flood management programme.
$3,750,000
approved
$3,750,000 paid
Otago CRP - West Taieri Contour Channel and Bridges Upgrade
Otago Regional CouncilTo undertake a flood management programme to renew aging infrastructure, contour channel upgrades and a bridge replacement.
$3,667,200
approved
$3,667,200 paid
49 jobs
Greater Wellington CRP - Erosion Projects (IRG)
Wellington Regional CouncilThis project, GWRC1-4 erosion edge protection, will reinstate sections of eroded bank edge protection works required to maintain the rivers’ design alignment.
$3,655,680
approved
$3,655,680 paid
1009 jobs
Nelson City Council - Nelson Floods Repairs / Flood Risk Protection
Nelson City CouncilTo upgrade resilience infrastructure including approximately 50m of stream bank retaining works, stream culvert upgrades, localised stream channel improvements, secondary flowpath diversion works, drainage diversion to new wetland, raising a section of Athol Street to protect residential property, and realigning a section of the stopbank upstream of Glen Road.
$3,600,000
approved
$451,519 paid
2 jobs
Marlborough District Council - Lower Wairau Flood Capacity Upgrade
Marlborough District CouncilTo upgrade over 9km of stopbanks along the Lower Wairau, which is home to an historic Pā site and Māori land, featuring houses and businesses that are disproportionately affected by flooding.
$3,600,000
approved
$293,011 paid
3 jobs
Waikato CRP - Erosion Protection in the Catchments of Lower Waikato Lakes and Wetlands
Waikato Regional CouncilTo restore natural water ways, improving capacity to manage water runoff, and extensive planting of native plant species along water ways.
$3,362,770
approved
$3,362,770 paid
450 jobs
Bay of Plenty Regional Council -Rangitāiki-Tarawera Rivers Scheme Flood Resilience Improvements
Bay of Plenty Regional CouncilUpgrades to stopbanks and canals across several river sections, including geotechnical investigations, detailed design, and construction works at Kōkōhinau, the Tarawera River, Rangitāiki River, and Rangitāiki Canals.
$3,120,000
approved
Waikato Regional Council - Kirikiri Stopbank Upgrade
Waikato Regional CouncilTo upgrade 3.7km of stopbanks that run from the mouth of the Kirikiri Stream to the SH26 Bridge just south of Kōpū, enabling a one in a hundred year flood protection level.
$3,060,000
approved
$1,383,575 paid
Marlborough CRP - Wairau River Flood Protection Scheme
Marlborough District CouncilTo construct flood protection works to mitigate flood risk causing damage to land and infrastructure in the Marlborough region.
$3,000,000
approved
$3,000,000 paid
93 jobs
Environment Southland - Oreti River Catchment Flood Protection Upgrade
Southland Regional CouncilTo improve the resilience of the current assets, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.
$3,000,000
approved
$129,923 paid
0Marlborough District Council - Wairau River Flood Protection Scheme
Marlborough District CouncilTo undertake stopbank retreat and realignment work, construction of new intermediate groynes, rock edge protection at the Waihopai/Wairau confluence, and upgrade of a critical Waihopai stopbank that overtopped in the 2021 flood event.
$2,880,000
approved
$448,382 paid
3 jobs
Environment Southland CRP - Wyndham Stopbank Upgrade
Southland Regional CouncilTo upgrade the stopbank along the section of the Mataura River passing through Wyndham, increasing it's strength and height.
$2,692,441
approved
$2,692,441 paid
146 jobs
Bay of Plenty Regional Council - Whakatāne River Flood Resilience Infrastructure Upgrades
Bay of Plenty Regional CouncilRepairing and strengthening stopbanks, replacing culverts, and implementing seepage control measures at key sites such as Trident Stopbank, Awatapu Lagoon, and the Whakatāne Canals.
$2,640,000
approved
Waikato CRP - Piako River Mouth, Right Bank Asset Rationalisation
Waikato Regional CouncilTo future proof the pump station foundation and upgrade access, relocate three underperforming floodgates to alternative locations for greater flood resilience, and rationalisation of aging stopbanks.
$2,638,416
approved
$2,638,416 paid
48 jobs
Environment Southland CRP - Gore Stopbank Upgrade
Southland Regional CouncilTo upgrade the stopbank along the section of the Mataura River passing through Gore District, increasing it's strength and height.
$2,561,038
approved
$2,561,038 paid
138 jobs
Waikato Regional Council - Waikato, Waipa and West Coast Erosion and Sediment Reduction
Waikato Regional CouncilStrengthening natural riverbanks and reducing sedimentation across the Lower Waikato, Waipa, and West Coast catchments. Works include erosion control, bank stabilisation, and sediment removal to improve waterway capacity and resilience.
$2,502,000
approved
GWRC - Ōtaki - Site 9 - Ōtaki Cliffs, Ōtaki Awa
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Ōtaki Awa, protecting the base of the Ōtaki cliffs to limit further erosion in line with the recommendations of the Ōtaki Floodplain Management Plan.
$2,500,000
approved
$310,702 paid
0Environment Canterbury - Regional Infrastructure Upgrades and Adaptation Programme #2
Environment CanterburySurveying, geotechnical investigations, and design work to support the construction of upgraded stopbanks and associated flood infrastructure across multiple sites including Tinwald, Lake Hood, Rangitata, and Staverly.
$2,400,000
approved
West Coast Regional Council - Greymouth Flood Resilience Upgrades Stages 2/4/5
West Coast Regional CouncilDevelop new and upgrade existing stopbanks across Greymouth township including Blaketown and Cobden. Works will provide increased protection to residential, commercial, industrial, state highway and local roading networks, rail, schools, aerodrome and municipal infrastructure.
$2,400,000
approved
Environment Canterbury - Waitarakao / Washdyke / Seadown Works
Environment CanterburyTo upgrade the stopbank and drainage network, including investigations, consenting, drain relocation and retreat, stopbank rebuild, wetland creation and enhancement, and planting which will protect the Timaru waste water treatment plant, large industrial area, roading infrastructure and private land.
$2,400,000
approved
$95,495 paid
2 jobs
West Coast Regional Council - Hokitika Stopbank Construction Stage 3
West Coast Regional CouncilUpgrade existing stopbanks to provide increased protection to agricultural, horticultural and residential, assets, state highway and local roading networks, schools, aerodrome and municipal infrastructure.
$2,400,000
approved
GWRC - Site 15 - Upper Buffer Establishment
Wellington Regional CouncilTo fence each site and plant native and exotic fauna at the river edge and complete maintenance of fenced and planted areas.
$2,160,000
approved
$113,400 paid
0GWRC - Site 2 - River Road, Masterton, Stage 3, Ruamāhanga Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Ruamāhanga Awa, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$2,110,000
approved
$2,004,500 paid
Environment Canterbury - Waimakariri River Flood Resilience Infrastructure Upgrades
Environment CanterburyStopbank construction and infrastructure protection around Kaiapoi, supported with technical investigations and design. The scope includes rail and school infrastructure and coordination with municipal services.
$2,100,000
approved
Environment Canterbury - Ashburton River / Hakatere Flood Resilience Infrastructure Upgrades
Environment CanterburyTechnical investigations and design to upgrade flood protection infrastructure around Ashburton. This encompasses surveying and geotechnical work to inform construction of stopbanks and protective works for roads, schools, and medical facilities.
$2,100,000
approved
Bay of Plenty Regional Council - Ohineangaanga Stream Erosion Protection Works
Bay of Plenty Regional CouncilReinforcing stream banks in Te Puke through stopbank upgrades, using rock and sheet pile materials. The works are designed to stabilise erosion-prone areas.
$1,980,000
approved
West Coast CRP - Māwhera Quay Flood Protection Wall upgrade Stage 2
West Coast Regional CouncilTo complete Stage Two of the Greymouth Floodwall upgrade to a 1 in 150-year Annual Exceedance Probability standard.
$1,954,365
approved
$1,954,365 paid
Waikato CRP - Foreshore East and West Stopbank
Waikato Regional CouncilTo restore and strengthen existing stopbanks along the east and west foreshore to protect the Hauraki Plains and restore drainage and fencing along waterways.
$1,920,000
approved
$1,920,000 paid
27 jobs
Vessel Construction for Waikato River Management
Waikato Regional CouncilTo construct a new replacement barge for use along Waikato River system, which is a critical infrastructure asset required for effective river management activities.
$1,920,000
approved
$1,920,000 paid
64 jobs
Nelson City Council - Jenkins Creek Flood Resilience Improvements
Nelson City CouncilThe project aims to upgrade stopbanks and associated flood resilience infrastructure around Jenkins Creek to increase protection to commercial/industrial assets, state highway and local roading networks, Nelson Airport, and municipal infrastructure.
$1,800,000
approved
Environment Canterbury - Rangitata Flood and Resilience #2
Environment CanterburyTo increase flood resilience in Rangitata including investigations, land purchasing, stopbanks, rock, planting, wetlands, diversions and river works.
$1,800,000
approved
$108,459 paid
0Waikato Regional Council - Coromandel Peninsula Flood Resilience Infrastructure Upgrades
Waikato Regional CouncilErosion control and streambank stabilisation across multiple sites. Activities include installing rock spalls, riprap, steel piping, and geotextiles, removing storm debris and blockages, and implementing fencing and planting to protect completed works.
$1,680,000
approved
Waikato Regional Council - Island Block Pump Station
Waikato Regional CouncilTo upgrade flood pump capacity with the replacement of two 1960s flood pumps with one Archimedes screw pump, meeting climate change mitigation needs and providing fish passage.
$1,680,000
approved
2 jobs
Northland Regional Council - Lower Whangatane Spillway Stopbank Setback
Northland Regional CouncilThe project aims to reposition the Lower Whangatane Spillway stopbank at the Quarry Road Bridge area near Kaitāia to increase capacity of flood spillway.
$1,501,200
approved
Environment Canterbury - Structure Upgrades / Adaptation Works
Environment CanterburyTo upgrade and adapt critical and aged flood protection infrastructure including investigations, monitoring, capital upgrades and fish passage enhancements across Kaiapoi, Ashley/Rakahuri, Waimakariri, Ashburton, Orari, Saltwater creek, and Waimate.
$1,500,000
approved
$409,712 paid
7 jobs
Environment Canterbury - Ashley River / Rakahuri Flood Resilience Infrastructure Upgrades
Environment CanterburyDetailed surveying and geotechnical analysis to support the construction of stopbanks and flood infrastructure around Rangiora and Kaiapoi. The technical works also include design services and stakeholder coordination to ensure protection of energy assets, marae, and retirement facilities.
$1,500,000
approved
Environment Southland CRP - Mataura Town Stopbanks (IRG)
Southland Regional CouncilTo upgrade the stopbank along the section of the Mataura River passing through Mataura, increasing it's strength and height.
$1,481,087
approved
$1,481,087 paid
122 jobs
GWRC - Site 1 - River Road, Masterton Stage 2, Ruamāhanga Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Ruamāhanga Awa, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$1,480,000
approved
$1,406,000 paid
Environment Canterbury CRP - Waimakariri River – McIntosh’s Bend - Kaiapoi Community Flood Protection Project (IRG)
Environment CanterburyThis project is a flood management programme that will strengthen existing stopbanks and flood defences at McIntosh’s Bend where a local weakness exists.
$1,477,649
approved
$1,477,649 paid
91 jobs
Kaipara CRP - Dargaville to Te Kōpuru Stopbank
Kaipara District CouncilTo upgrade the existing 10.7 kilometre stopbank from Dargaville to Te Kopuru.
$1,445,890
approved
$1,445,890 paid
17 jobs
Environment Southland CRP - Invercargill Stopbank Upgrade
Southland Regional CouncilTo upgrade the stopbank along the section of the Otepuni Creek and Waihopai River passing through Invercargill District, increasing it's strength and height.
$1,444,467
approved
$1,444,467 paid
81 jobs
GWRC - Waiōhine - Site 5 - Fullers Bend, Waiōhine Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Waiōhine Awa at Fullers Bend, providing erosion migration, minimising avulsion risk, and increasing resilience in line with the recommendations of the Waiōhine Rakahanga River Plan.
$1,390,000
approved
$347,500 paid
0Bay of Plenty Regional Council - Ōpōtiki Township Stopbank Flood Resilience Improvements
Bay of Plenty Regional CouncilDesign and construction of upgrades stopbanks, including geotechnical investigations, procurement of construction materials, and civil engineering activities to build protection infrastructure
$1,380,000
approved
Waikato CRP - Mill Road Pump Station (IRG)
Waikato Regional CouncilThis project will upgrade the Mill Road Pumps stations. These assets protect the Paeroa community from flooding, but are one of the highest risk rated assets due to the importance of urban protection.
$1,303,040
approved
$1,303,040 paid
23 jobs
Waikato CRP - Roger Harris Pump-station Upgrade
Waikato Regional CouncilTo upgrade Roger Harris pump station, to ensure the pumping capacity of the Mill Road Pump Station function to protect Paeroa from flooding.
$1,204,444
approved
$1,204,444 paid
214 jobs
Bay of Plenty Regional Council - Waioeka Otara Rivers Scheme Stopbank Upgrades
Bay of Plenty Regional CouncilTo upgrade existing stopbanks and floodwalls of the rivers to meet one in a hundred year levels of flood protection and provide mitigation for climate change.
$1,200,000
approved
$230,466 paid
2 jobs
Otago Regional Council - Puerua Outfall Structure Upgrades
Otago Regional CouncilTwo-stage upgrade involving culvert installation and training line strengthening on the Lower Clutha, increasing levels of protection to Balclutha and Kaitangata
$1,200,000
approved
Waikato Regional Council - Lower Waikato Floodgate Programme
Waikato Regional CouncilTo upgrade assets east of Huntly in the Mangawara catchment, providing ongoing critical flood defences in the area, making them safer to operate in times of flood, and enabling the removal of floodwater from behind the stopbanks.
$1,200,000
approved
$477,348 paid
0Waikato Regional Council - Thames Valley Diversion Channel Upgrade
Waikato Regional CouncilTo fence, shape, and plant drainage channels to address the significant bank erosion and slumping of drains following the 2022/23 floods and heavy rainfall, ensuring effective operation of the land drainage network to clear surface water, reducing potential damage to pasture and crops, and reducing the overall sediment release into the Piako and Waihou river systems.
$1,080,000
approved
$171,041 paid
0Environment Canterbury - Orari River Flood Resilience Infrastructure Upgrades
Environment CanterburyTechnical design and geotechnical work to enable construction of stopbanks and protective infrastructure across Geraldine, Temuka, Pleasant Point, and Levels Plains. The works also involve bridge protection.
$1,050,000
approved
GWRC - Site 10 - Tawaha Sill, Ruamāhanga Awa
Wellington Regional CouncilTo upgrade the current sill at the Tawaha Floodway which crosses State Highway 53 at Jenkins Dip, which currently does not provide a consistent spill from the river in flood conditions.
$1,020,000
approved
$51,000 paid
2 jobs
Otago Regional Council - East Taieri Lower Pond Structure Upgrades
Otago Regional CouncilDesign and construction of upgraded stopbanks and flood infrastructure to improve protection for the Lower Taieri flood scheme. Works include earthworks and concrete structures.
$1,020,000
approved
Otago Regional Council - Riverbank Rd Flood Risk Mitigation
Otago Regional CouncilSediment removal and bank repairs to improve flow capacity of the Clutha River (Matau branch), including fencing and earthworks.
$960,000
approved
GWRC - Waingawa - Site 8 - Waingawa River Hood Aerodrome
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Waingawa Awa, protecting the southern end of the Hood Aerodrome runway.
$950,000
approved
$142,500 paid
Environment Canterbury CRP - Ashley Rakahuri River Protection and Fairway Management
Environment CanterburyTo undertake a flood management programme to remove vegetation that is currently choking the river causing it to spread laterally resulting in erosion and loss of productive farmland.
$923,789
approved
$923,789 paid
262 jobs
Tasman District Council - Peach Island Stopbank Repair
Tasman District CouncilTo repair vulnerable sections of stopbanks protecting Peach Island along the Motueka River and complete upgrade work necessary to safely maintain these stopbanks on an ongoing basis, protecting approximately 170 hectares of fertile and productive land, and approximately 15 homes and ancillary structures.
$900,000
approved
$28,398 paid
0Environment Canterbury - Kaikōura Flood Resilience Infrastructure Upgrades
Environment CanterburyBerm strengthening supported by surveying and geotechnical investigations. Design work underpins infrastructure upgrades for rail, bridges, and schools in the Kaikōura area
$900,000
approved
GWRC - Waipōua - Site 4 - Waipōua Industrial Site - Akura Road, Waipōua Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Waipōua Awa, providing erosion migration at the approach to the State Highway 2 Bridge and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$880,000
approved
$836,000 paid
GWRC - Whakawhiriwhiri - Site 16 - Whakawhiriwhiri Stream - project re-scope, Whakawhiriwhiri Awa
Wellington Regional CouncilTo widen scope of planned resilience works addressing the low capacity of the stream to convey the ponded water, causing flooding to surrounding landowners.
$860,000
approved
$43,000 paid
0Otago CRP - Outram Flood Protection (IRG)
Otago Regional CouncilThis project is a flood management programme, which will constructing a weighting blanket, seal or replace culvert, construct bottom storm water drains and refill weak zones caused by tree roots.
$812,800
approved
$812,800 paid
22 jobs
Waikato CRP - Piako River, Ngatea Town Left Stopbank (IRG)
Waikato Regional CouncilThis project will increase the height and strength of stop bank on the left bank at Ngatea, and the last remaining sections of non-compliant stop bank between Ngatea and Pipiroa along the right and left banks.
$768,000
approved
$768,000 paid
55 jobs
Environment Canterbury - Ōpihi River Flood Resilience Infrastructure Upgrades
Environment CanterburyTechnical surveying and geotechnical investigations to guide the construction of stopbanks and flood protection measures near Fairlie. Design work supports infrastructure upgrades near roads, schools, and municipal assets.
$750,000
approved
Hawke's Bay CRP - Upper Tukituki Flood Control Scheme - SH50 Bridge (IRG)
Hawke's Bay Regional CouncilA flood management programme to construct soft and hard edge river bank protection and protection to the abutment to State Highway 50 Waipawa Bridge.
$640,000
approved
$640,000 paid
Hawke's Bay CRP - Wairoa River Scheme - River Parade Scour Protection
Hawke's Bay Regional CouncilThis project is a flood management programme comprising activities to protect Wairoa River Bank from erosion, which is an imminent threat to infrastructure and property. Protection will be provided by construction of a sheet pile wall and reinstatement planting, and restoration work.
$640,000
approved
$640,000 paid
137 jobs
Otago CRP - Riverbank Road Flood Protection, Lower Clutha. Stabilising critical flood protection infrastructure for Clutha Delta area (IRG)
Otago Regional CouncilThis project is a flood management programme that involves repair work for 150m of stabilisation on steep bank then reinstatement of road along the Clutha River stop bank
$608,000
approved
$608,000 paid
25 jobs
Environment Canterbury - Pareora River Flood Resilience Infrastructure Upgrades
Environment CanterburySurveying, geotechnical analysis, and design to support rural flood protection works, including stopbank upgrades and safeguarding of agricultural land and road networks in the Pareora area.
$600,000
approved
Otago Regional Council - Puerua Flood Protection Strengthening
Otago Regional CouncilUpgrade and repair stopbanks and associated flood resilience infrastructure around the Paretai area between the Clutha River Koau Branch and the Puerua River.
$600,000
approved
Environment Southland CRP - Waiau Flood Repairs (IRG)
Southland Regional CouncilThe project will repair damaged /eroded river bank, placing protective material to mitigate risk of erosion due to the Nov/ Dec 2019 floods, erosion has caused large areas of riverbank throughout the lower Waiau to erode away sending sediment down to the lagoon at the estuary.
$597,197
approved
$597,197 paid
36 jobs
GWRC - Waingawa - Site 7 - Masterton Raw Water Supply, Waingawa Awa
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Waingawa Awa, protecting a water supply, controlling erosion, and increasing resilience in line with the recommendations of the Upper Waingawa Awa portion of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$570,000
approved
$142,500 paid
0Environment Canterbury CRP - Waiau Township Stopbank Repairs and Upgrades (IRG)
Environment CanterburyThis project is a flood management programme, which will repair and upgrade the Waiau River stopbank.
$562,343
approved
$562,343 paid
155 jobs
GWRC - Site 11 - Pukio East Stopbank
Wellington Regional CouncilTo remove the redundant stopbank, allowing the river more room which will reduce flooding.
$540,000
approved
$513,000 paid
GWRC - Site 6 - Awaroa Sill, Ruamāhanga Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Ruamāhanga Awa, including retreating the spillway sill and fences to limit further lateral movement of the active channel, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$530,000
approved
$51,000 paid
0GWRC - Waingawa - Site 13 - South Masterton Stopbank, Waingawa Awa
Wellington Regional CouncilTo augment and reline the riverside face of the existing stopbank structure along the True Left Bank of the Waingawa Awa, reducing the flood risk to the southern section of Masterton in line with the recommendations of the Waingawa Awa portion of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$520,000
approved
$26,000 paid
0Otago Regional Council - Silver Stream Capacity Improvements
Otago Regional CouncilUpgrade stopbanks and associated earthworks for the Silver Stream, increasing the levels of protection to Mosgiel and East Taieri.
$480,000
approved
Waikato CRP - Lake Kimihia, Ecological and Cultural Enhancement
Waikato Regional CouncilTo improve access to the sites, construct two culverts and complete works including rock protection, vegetation clearance, cultural assessment and planting, pest fish barrier, vegetative pest control and wetland restoration.
$451,330
approved
$451,330 paid
5 jobs
Otago Regional Council - Kaitangata Floodbank Reconstruction
Otago Regional CouncilUpgrade and reconstruct stopbank infrastructure, providing increased levels of protection to Kaitangata.
$420,000
approved
West Coast CRP - Buller River Flood warning system
West Coast Regional CouncilTo install and operate a new flood warning system in the Buller River catchment.
$370,634
approved
$370,634 paid
Northland CRP - Panguru (IRG)
Northland Regional CouncilThe project will provide funding to complete a flood management programme, which is a joint venture between the New Zealand Transport Agency (NZTA) and the Far North District Council. The project is 90% completed, but was interrupted by the COVID-19 lockdown.
$361,683
approved
$361,683 paid
14 jobs
Northland Regional Council - Quarry Road - Phase 2
Northland Regional CouncilTo reinstate the bridge and strengthen stopbanks either side.
$360,000
approved
$360,000 paid
Otago CRP - Upgrade and Installation of ORC Flow Management Structures at Robson Lagoon (IRG)
Otago Regional CouncilTo upgrade and install of flow management structures, which are critical for flood management to preserve the natural values of Robsons Lagoon and the Lake Tuakitoto.
$352,000
approved
$351,999 paid
19 jobs
Waikato Regional Council - Mangatawhiri Pumpstation Infrastructure
Waikato Regional CouncilTo replace dual inlet at the pump station and the construction of an isolation gate enabling access to the pump for maintenance, including a platform, inlet and screen replacements.
$324,000
approved
$154,654 paid
0Environment Southland - Aparima Catchment Flood Protection Upgrade
Southland Regional CouncilTo improve resilience of the current assets protecting the Otautau community, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.
$300,000
approved
$300,000 paid
Northland Regional Council - Quarry Road - Phase 1
Northland Regional CouncilTo protect Quarry Road bridge from flood waters eroding the deflection bank and structural support of the bridge.
$300,000
approved
$300,000 paid
Environment Southland - Te Anau Basin Catchment Flood Management Upgrade
Southland Regional CouncilTo improve the resilience of the current assets, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.
$300,000
approved
$131,094 paid
0GWRC - Site 14 - Homebush Wastewater Treatment Plant Resilience works
Wellington Regional CouncilTo lift the headwork above flood levels protecting the function of the wastewater treatment plant.
$270,000
approved
$27,000 paid
0GWRC - Fish Passages - Site 12 - Fish Passage upgrades
Wellington Regional CouncilTo enhance fish passage by developing and rehabilitating structures that are crucial for flood protection, including adapting grade control structures, installing fish-friendly flap gates, replacing existing infrastructure with fish-friendly alternatives, and improving overall flood resilience.
$220,000
approved
$55,000 paid
0GWRC - Waipōua - Site 3 - Waipōua SH2 bridge Left bank protection, Waipōua Awa
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Waipōua Awa, providing erosion migration at the approach to the State Highway 2 Bridge and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$80,000
approved
$76,000 paid