Funding Projects
154 projects funded through Kanoa programmes
Showing 154 of 154 projects
Wai Ariki Hot Springs Spa Construction
Pukeroa Lakefront Holdings LimitedTo construct a Spa and wellness facility on the Rotorua Lakefront that will provide 5-Star wellness orientated spa/bathing services.
$45,000,000
approved
$45,000,000 paid
0The Whale Trail - Shared path from Picton to Kaikōura
Marlborough Kaikōura Trail TrustTo construct a new cycle and walking track from Picton to Kaikōura.
$26,000,000
approved
$22,048,784 paid
57 jobs
Town Centre Transformation (IRG)
Taupo District CouncilThis project will reorient a range of streets and lanes that connect the town centre, namely Ruapehu Street, Spa and Titiraupenga Streets, Tongariro Street, Tuwharetoa Street and Lake Terrace.
$20,600,000
approved
$20,600,000 paid
684 jobs
Repair and strengthening of roading network - Boundary Central Hawkes Bay to Weber
Tararua District CouncilTo repair and strengthen various sections of roading network on state highway 52 between Central Hawkes Bay and Manawatū.
$16,600,000
approved
$16,600,000 paid
237 jobs
Bay of Plenty CRP - Bay of Plenty River Schemes - Flood Resilience Project
Bay of Plenty Regional CouncilTo undertake civil works construction, design, modelling, project management, land purchase, tree removal and native planting work in the Lower Kaituna, Ngongotahā Stream, Rangitāiki and Whakatāne Rivers and the Waioeka River.
$12,900,000
approved
$11,528,834 paid
436 jobs
Hawke's Bay CRP - Assess and Enhance Flood Resilience Infrastructure - Heretaunga Plains
Hawke's Bay Regional CouncilA flood management programme to construct and strengthen stop banks on the Tutaekuri, Ngaruroro and Clive Rivers areas within the Heretaunga Plains Flood Control Scheme.
$12,800,000
approved
$12,800,000 paid
20 jobs
Tāheke Geothermal Power Station Enabling Works
Eastland Generation LimitedTo undertake the design, civil construction works and drilling to enable consenting and construction of the Tāheke Geothermal Power Station in Rotorua.
$11,900,000
approved
$11,900,000 paid
150 jobs
Ōpōtiki CBD improvement (IRG) - PARENT DEAL
Ōpōtiki District CouncilTo demolish and rebuild a new library and community facility that will provide a hub for digital learning, technology and innovation as part of a group of projects that aim to upgrade the Ōpōtiki central business district.
$11,900,000
approved
$11,900,000 paid
375 jobs
Tūrangi Shared Paths, Kerbs and Channels Upgrade
Taupo District CouncilTo upgrade kerbs and channels in Tūrangi and extend cycle and walking networks in Taupō.
$11,775,000
approved
$11,775,000 paid
1 jobs
Manawatū-Whanganui CRP - Lower Manawatu Scheme Resilience
Horizons Regional CouncilTo upgrade 25 km of stop banks across the Lower Manawatū River flood Plain area.
$11,680,457
approved
$11,680,457 paid
785 jobs
Development of Sarjeant Gallery
Whanganui District CouncilTo revitalise the Sarjeant Gallery in Whanganui, by constructing a new wing and upgrading the existing building.
$11,600,000
approved
$11,600,000 paid
410 jobs
The Theatre Royal Upgrade and Heritage Facility, Timaru
Timaru District CouncilTo upgrade the Timaru Theatre Royal and construct a connected heritage facility.
$11,600,000
approved
$7,870,000 paid
52 jobs
Rugby Park Grandstand Rebuild
Poverty Bay Rugby Football UnionTo refurbish and strengthen an existing grandstand at Rugby Park in Tairāwhiti and create a fit for purpose facility for rugby, other sports, entertainment, cultural and family events.
$11,300,000
approved
$10,700,000 paid
23 jobs
Blenheim Library/Art Gallery (IRG)
Marlborough District CouncilTo construct a new library and art gallery in Blenheim.
$11,000,000
approved
$11,000,000 paid
55 jobs
Southern Waikato Integrated Training Centre (IRG)
South Waikato Investment Fund Trust (SWIFT)To construct a training facility in Tokoroa supporting approximately 230 jobs in the short term and 35-40 operational jobs on completion.
$10,840,000
approved
$10,835,000 paid
102 jobs
Invercargill CRP - Stead Street Stop Bank - Upgrade (IRG)
Invercargill City CouncilTo facilitate improvements to Invercargill's climate resilience by improving infrastructure in and around waterways, raising of stopbanks, and development of soft and riparian infrastructure.
$10,800,000
approved
$10,759,571 paid
14 jobs
Bay of Plenty CRP - Rangitāiki River - Flood & Spillway Protection Edgecumbe
Bay of Plenty Regional CouncilTo increase the capacity of the Rangitāiki River spillway through diversion of flood flows from the river by increasing flooding capacity and construction of a spillway upstream of Edgecumbe as part of a larger flood management programme.
$10,275,000
approved
$10,275,000 paid
257 jobs
Murihiku Marae Redevelopment – Phases 4 and 5 (Stage 1) (IRG)
Waihōpai Rūnaka IncorporatedTo renovate and restore the Murihiku Marae by developing roading and services infrastructure, replacing the administration and services hub and construction of accommodation facilities.
$10,125,000
approved
$10,125,000 paid
753 jobs
Invercargill City Redevelopment - Our city for tomorrow - IRG
Invercargill City Council and Invercargill Central LtdTo facilitate the redevelopment of Invercargill's central city to improve the cities liveability and provide a high-quality commercial district.
$10,000,000
approved
$10,000,000 paid
Hood Aerodrome infrastructure Upgrade
Masterton District CouncilTo upgrade safety and services infrastructure at Hood Aerodrome, Masterton to attain Civil Aviation Authority Certification and progress ability to host commercial regional flights in the future.
$10,000,000
approved
$6,825,000 paid
20 jobs
Active Modes Urban Shared Paths Programme (IRG) - Port Road – Roading Improvements
Whangārei District CouncilThe project will enable Whangarei District Council to construct a bridge and expand a portion of Port Road from two to four lanes and to also include a cycle/walking pathway ($10 million).
$10,000,000
approved
$10,000,000 paid
271 jobs
Clutha Community Hub (IRG)
Clutha Community Hub Charitable TrustTo construct a community owned, multipurpose community, business and visitor hub in Balclutha.
$9,900,000
approved
$9,900,000 paid
1050 jobs
West Coast CRP - Waiho River Stopbank Protection Phase 1
West Coast Regional CouncilTo improve flood protection and through the upgrade of existing and construction of new stopbank along the Waiho River.
$9,225,000
approved
$9,218,597 paid
St John's Ambulance Station (IRG)
St JohnsThe project will establish a new St John Ambulance and Emergency Hub for the Rotorua District. IRG Ministers approved in principle $11m for the project, although the project cost has been scaled down to $9.194m based on a quantity survey of the project.
$9,194,000
approved
$8,690,735 paid
Northland CRP - Awanui Scheme Upgrade
Northland Regional CouncilTo upgrade the current flood protection facilities in Awanui, Kaitāia.
$8,510,630
approved
$8,510,630 paid
1003 jobs
Te Awa Cycleway Hamilton to Cambridge section (IRG)
Hamilton City CouncilTo construct a three-metre-wide, 20-kilometre-long shared cycleway featuring boardwalks and bridges, from Hamilton to the Cambridge Velodrome as part of the path along the Waikato River from Ngāruawahia to Horahora.
$8,330,000
approved
$8,330,000 paid
111 jobs
Kōpū Marine Precinct
Thames-Coromandel District CouncilTo build essential marine servicing infrastructure at the Kōpū Industrial area, seven kilometres from Thames township, supporting and enhancing the existing Hauraki Gulf mussel industry.
$8,200,000
approved
$8,200,000 paid
95 jobs
Replacement Indoor Aquatic Facility (IRG)
Stratford District CouncilConstruction of an indoor aquatic facility in Stratford. The facility will include a 25m lap pool, learn-to-swim pool, hydro-therapy pool, toddler pool and a splash pad.
$8,000,000
approved
$8,000,000 paid
177 jobs
Midway SLSC Surf Rescue Community Hub (IRG)
Midway Surf Life Saving Club (SLSC)To build a fit for purpose surf rescue community hub with community space that supports and enables sustainable delivery of lifeguarding services along a stretch of Midway Beach to the Waipoa Bridge.
$7,870,000
approved
$7,870,000 paid
121 jobs
Upgrades of infrastructure, paths and walkways in Ahipara, Awanui and Kaitāia
Far North District CouncilTo upgrade the car parking, pathways, playgrounds, seating and install lighting and art works with a cultural overlay to improve the infrastructure and streetscape of Ahipara, Awanui and Kaitāia.
$7,658,000
approved
$7,658,000 paid
57 jobs
Waipaoa River Flood Control Scheme
Gisborne District CouncilTo execute a flood management programme, upgrading 15 kilometres of stop banks in critical areas along the Waipaoa River, along with associated structures, access, and remedial works.
$7,500,000
approved
$7,500,000 paid
0Nelson CRP - Saxton Creek Upgrade
Nelson City CouncilTo undertake flood resilience upgrade works in Stoke, Nelson.
$7,500,000
approved
$7,500,000 paid
40 jobs
Tasman CRP - Motueka River Refurbishment
Tasman District CouncilTo undertake flood resilience upgrade works in the Motueka region.
$7,500,000
approved
$7,500,000 paid
0Kaingaroa Community Infrastructure Upgrades
Rotorua Lakes Council & Te Puni KokiriTo refurbish and install new community infrastructure in Kaingaroa Village, including water, lighting, roading and community facilities.
$7,200,000
approved
$7,100,000 paid
Environment Canterbury CRP - Region wide river berm transition
Environment CanterburyTo undertake an extensive planting programme across various river berms from Kaikōura to Waitaki including removing exotic non-beneficial invasive plant species, and strengthening waterway edges to improve flood resilience.
$7,123,603
approved
$7,123,603 paid
2593 jobs
Greater Wellington CRP - Major Projects (IRG)
Wellington Regional CouncilThe project is part of the Greater Wellington Regional Council‘s (GWRC) flood management programme. It includes:1. GWRC4-4, Ruamahanga Lower Wairarapa Valley Development Scheme – The scheme will reinstate a new stop bank at Pukio East, which has been built parallel to an existing stop bank compromised by river bank erosion.2. GWRC3-4, Te Kauru Upper Ruamahanga Flood Management Programme. The project will upgrade the Masterton River Road and landfill bank edge protection.
$7,096,320
approved
$7,096,320 paid
1009 jobs
Nukumaru Station Road Extension
South Taranaki District CouncilTo provide the Waiinu Beach community and local commercial parties, including Silver Fern Farms Limited and the local metal quarry, with a safe and flood resilient access road south of the Lime Works bridge.
$7,000,000
approved
$7,000,000 paid
67 jobs
Mid-North Sports Package - Lindvart Park, Sportsville Kaikohe
Kaikohe & Districts Sportsville IncorporatedTo construct new facilities that accommodate 25 different sports to service the Far North and upgrade court facilities, roading, car parking improvements and safer access to Lindvart Park in Kaikohe.
$6,860,000
approved
$6,860,000 paid
300 jobs
Pettigrew Green Arena Expansion (IRG)
Regional Indoor Sports and Events Centre TrustThe Pettigrew Green Arena Expansion project will increase total indoor court space up to 11 indoor courts suitable for national tournaments for basketball, volleyball and soccer.
$6,700,000
approved
$6,700,000 paid
57 jobs
Manawatū-Whanganui CRP - Palmerston North Flood Protection
Horizons Regional CouncilTo rebuild stopbanks and strengthen associated structures involving major earth works, drainage work and land reinstatement.
$6,587,569
approved
$6,587,569 paid
679 jobs
Environment Canterbury CRP - Rangitata 2019 Flood Recovery
Environment CanterburyTo repair damage done to stop banks during the December 2019 flood event on State Highway 1 and the bridge across the Rangitata River.
$5,400,615
approved
$5,400,615 paid
263 jobs
Bridge Replacement West Coast - William Stewart
Grey District CouncilTo replace the 240-metre William Stewart bridge which connects the Westland and Turamakau settlement.
$5,327,000
approved
$5,192,849 paid
105 jobs
Hawke's Bay CRP - Assess and Enhance Flood Resilience Infrastructure - Upper Tukituki Flood Control
Hawke's Bay Regional CouncilA flood management programme involving the removal and stockpile of 800,000m3 of gravel from the Upper Tukituki Flood protection Scheme.
$5,120,000
approved
$5,119,999 paid
Environment Southland CRP - Stead Street Pump Station Replacement
Southland Regional CouncilTo replace the drainage pump and pipework, and upgrade the pumping station facilities in Invercargill.
$5,098,771
approved
$5,098,771 paid
231 jobs
Bridge Replacement West Coast - Rough River
Grey District CouncilTo replace the aging s168 metre single lane bridge with a fit for purpose modern two lane bridge improving traffic safety and resilience, particularly to motorists accessing the Grey Valley and the new Paparoa and Pike River Memorial walks.
$5,000,000
approved
$4,715,901 paid
72 jobs
Kaipara Kickstart: Replacement Funding for Unsealed Roading Improvements (IRG)
Kaipara District CouncilFunding will meet the $4.91 million shortfall in National Land Transport Funding (NLTF) co-funding that was anticipated under an existing Provincial Growth Fund (PGF) contract with Kaipara District Council.This is less than the $5 million presented to IRG Ministers. The PDU has confirmed the NLTF shortfall is $4.91 million.
$4,910,000
approved
$4,910,000 paid
74 jobs
Te Māhurehure Expansion Projects (IRG) - Te Taumata o Kupe
Te Kainga Atawhai Housing LimitedThe construction of a purpose built facility that enables people to learn about the genesis of the arrival of Maori and Pasifika to New Zealand. The project will include the construction of an large additional wharenui, capable of holding wedding, school excursions, seminars, huihuinga and tourism; up to 5 contained units for artistic and accommodation purposes (Wahi Mahi); a facilities block; and parking
$4,600,000
approved
$4,600,000 paid
83 jobs
Kaipara CRP - Raupō Upgrade
Kaipara District CouncilTo install dual sluice gates and a single floodgate assembly on a canal at Ruawai.
$4,554,110
approved
$4,550,000 paid
FNDC jetties - Pukenui, Unahi, Rangitāne
Far North Holdings LimitedTo undertake a group of projects to upgrade jetties at Pukenui, Unahi and Rangitāne.
$4,500,000
approved
$3,866,000 paid
0Active Modes Urban Shared Paths Programme - Raumanga Shared Path
Whangārei District CouncilTo construct a series of shared walking and biking pathways and associated civil works in Whangarei central and surrounding suburbs.
$4,500,000
approved
$4,356,354 paid
145 jobs
Waikato CRP - Fish Passage Pumps
Waikato Regional CouncilTo upgrade infrastructure critical to flood protection in the Lower Waikato and Hauraki, enabling safe passage of native eels in five priority catchments.
$4,480,000
approved
$4,480,000 paid
397 jobs
Northland CRP - Moerewa
Northland Regional CouncilTo upgrade the current flood protection facilities for Moerewa township.
$4,477,687
approved
$4,477,687 paid
915 jobs
Hokitika Swimming Pool Renovation
Westland District CouncilTo upgrade the Hokitika Pool with a new pool liner, pipework, water reticulation and filtration equipment, installation of wheelchair access, along with seismic strengthening upgrades and new changing rooms, toilets, showers, foyer, reception, first aid, office and dry storage areas.
$4,420,000
approved
$4,300,000 paid
Manawatū-Whanganui CRP - Rangitīkeii Scheme Enhancement
Horizons Regional CouncilTo develop a river park to enhance access to the Rangitikei River close to State Highway 1 near Bulls.
$4,399,999
approved
$4,399,999 paid
325 jobs
Manawatū-Whanganui CRP - Foxton Flood Protection
Horizons Regional CouncilTo upgrade section of the existing stopbank, to construct surface water drainage system in the eastern catchment area of Foxton and divert the water to the Whirokino drainage scheme.
$4,256,592
approved
$4,256,592 paid
556 jobs
Development of the Kaihū Valley Rail Trail
Kaipara District CouncilTo complete construction of sections of the Kaihū Valley Rail Trail, a 36km walking and cycle trail from Dargaville to Donnelly’s Crossing, on the west coast of the Kaipara District.
$4,000,000
approved
$3,934,223 paid
64 jobs
Te Ramanui o Ruapūtahanga - Constructing Hāwera's Library, Arts, and Culture Centre
South Taranaki District CouncilTo build a new 1,605m2 civic facility in Hāwera combining a library, meeting rooms, public toilets, a community art gallery, i-SITE visitor centre, café, car-parking, landscaping and exterior public civic spaces.
$4,000,000
approved
$4,000,000 paid
684 jobs
Nelson Port Slipway Development - Loan
Port Nelson LimitedTo develop a slipway and hard stand at Port Nelson.
$3,800,000
approved
$3,800,000 paid
West Coast CRP - Hokitika Flood and Coastal Erosion Protection
West Coast Regional CouncilTo construct a 1.4km rock revetment seawall as part of a flood management programme.
$3,750,000
approved
$3,750,000 paid
Otago CRP - West Taieri Contour Channel and Bridges Upgrade
Otago Regional CouncilTo undertake a flood management programme to renew aging infrastructure, contour channel upgrades and a bridge replacement.
$3,667,200
approved
$3,667,200 paid
49 jobs
Greater Wellington CRP - Erosion Projects (IRG)
Wellington Regional CouncilThis project, GWRC1-4 erosion edge protection, will reinstate sections of eroded bank edge protection works required to maintain the rivers’ design alignment.
$3,655,680
approved
$3,655,680 paid
1009 jobs
Te Mata Mushrooms Expansion
Medical Land Holdings LimitedTo expand to grow 40% more mushrooms and expand its compost facility and construct a 200 million litre dam at Mt Herbert in Waipukurau.
$3,549,102
approved
$3,549,102 paid
0Kauri Museum (IRG)
Otamatea Kauri and Pioneer Museum BoardTo construct and fit out a science and discovery centre, collections/research centre, build the forest walkway and renovate the Gumdiggers Café at the Kauri Museum in Matakohe.
$3,450,000
approved
$3,450,000 paid
0West Coast Port Package - Greymouth Port Slipway
Grey District CouncilTo repair and renew the existing the slipway infrastructure including manufacturing of a new cradle allowing slippage of vessels up to 150 gross tonnes - and the construction of a new slipway building to house the slipway.
$3,400,000
approved
$3,350,000 paid
39 jobs
Waikato CRP - Erosion Protection in the Catchments of Lower Waikato Lakes and Wetlands
Waikato Regional CouncilTo restore natural water ways, improving capacity to manage water runoff, and extensive planting of native plant species along water ways.
$3,362,770
approved
$3,362,770 paid
450 jobs
Solid waste: Fox Glacier and Butlers (IRG)
Westland District CouncilTo remove remaining waste material and rubbish from the old Fox River landfill and transportation to a newly constructed landfill cell at Butlers Landfill, south of Hokitika.
$3,300,000
approved
$3,300,000 paid
36 jobs
Nelson Port Slipway Development - Equity
Port Nelson LimitedTo develop a slipway and hard stand at Port Nelson.
$3,250,000
approved
$3,250,000 paid
Cron Street and Old Christchurch Road Seal Extension - Old Christchurch Road
Westland District CouncilA cluster of civil works projects to improve pedestrian, parking and road safety in Franz Josef and Hokitika.
$3,154,108
approved
$3,154,108 paid
Bridge Replacement West Coast - Moonlight Creek
Grey District CouncilTo replace the aging single lane bridge with a fit for purpose modern two lane bridge improving traffic safety and resilience, particularly to motorists accessing the Grey Valley and the new Paparoa and Pike River Memorial walks.
$3,073,000
approved
$3,049,301 paid
44 jobs
Dementia (Eden Care) Unit (IRG)
Beattie Community Trust IncThis project will build and operate a secure 20-bed dementia facility in conjunction with the current 39-bed rest home. The building will include 2 day-stay/respite care rooms, and an updated kitchen and dining room will be joined by secure link to the new building.
$3,000,000
approved
$3,000,000 paid
Development of Hihiaua Cultural Centre
Hihiaua Cultural Centre TrustTo construct an 800 seat multi-cultural performing arts venue in Whangārei.
$3,000,000
approved
$2,400,000 paid
1 jobs
Marlborough CRP - Wairau River Flood Protection Scheme
Marlborough District CouncilTo construct flood protection works to mitigate flood risk causing damage to land and infrastructure in the Marlborough region.
$3,000,000
approved
$3,000,000 paid
93 jobs
Gore Public Library – Major Refurbishment (IRG)
Gore District CouncilThe project will re-house the Gore Public Library within the James Cumming Wing Community Centre building. Converting the entire ground floor of the James Cumming Wing (approx. 1224 m2) into a modern library and modernise the first-floor community rooms and supporting facilities (approx. 508 m2). This refurbishment project will effectively accomplish two pending Council projects: the Library will be adequately rehoused, and the James Cumming Wing community rooms, which is very dated in both layout and décor, will be upgraded.
$3,000,000
approved
$3,000,000 paid
84 jobs
Mid-North Sports Package - Kerikeri Domain (IRG)
Far North District CouncilConstruction or completion of the following works contained in the Kerikeri Domain Management Plan:a) Basketball court – replacing existing basketball court, installing new basketball hoop, paint linemarking;b) Skatepark – upgrade existing skatepark to concrete and paint works;c) Exercise area – install seated leg press, shoulder grinder, overhead press/lateral pulldown combo and ab/stretching bench onto new concrete exercise equipment pads;d) Lighting – install new light towers and lighting columns and associated electrical reticulation;e) Walking track – widen existing walking track and installation of cycle stands, storyboards, drinking fountains and park benches;f) BBQ/Pavilion area – install barbeque and associated services, install wifi access;g) Shade sails – install shade sail;h) Parking lot – complete paintworks for accessible car parks, install seats under shade sail and tree planting;i) Playground – install rubber matting and playground equipment; andj) Miscellaneous – works in relation to new cenotaph and new building.
$3,000,000
approved
$2,960,000 paid
0Horowhenua Business Park Infrastructure (IRG)
The Horowhenua Company LimitedThe project will build infrastructure at the Horowhenua Business Park. This infrastructure includes roading, water, wastewater, storm water, electrical and fibre services to enable tenants to build premises and establish businesses in the Business Park. 1. Stage one: to develop infrastructure in the first 1.8ha of the Horowhenua Business Park; 2. Stage two: to develop infrastructure in a further 750m2.
$2,900,000
approved
$2,900,000 paid
54 jobs
Eastern Region – Surf Lifesaving Rescue Centre (IRG)
Omanu Beach Charitable TrustThis project will build a new multi-purpose community rescue centre that will bring together the Omanu Beach Charitable Trust with the Eastern Regional and National surf lifesaving capacity in the eastern region. The project involves demolishing the old Mt Manganui Bridge Club and building a new, fit-for-purpose 1,300m2 building on Tauranga City reserve. The facility provides synergies for search and rescue, surf lifesaving and other local community groups.
$2,890,000
approved
$2,890,000 paid
155 jobs
Venison and cattle processing plant
Alliance Group LimitedTo repurpose and upgrade the venison processing facility in Lorneville into a hybrid venison and beef processing facility to increase the capability and allow the processing of cattle.
$2,800,000
approved
$2,800,000 paid
0Nelson Port Slipway Development - Grant
Port Nelson LimitedTo develop a slipway and hard stand at Port Nelson.
$2,750,000
approved
$2,675,000 paid
64 jobs
Ellison St / Chambers St connectivity (IRG)
Napier City CouncilThis project will improve a shared walking and cycling path in Napier that will allow vulnerable users to access high activity areas.
$2,747,000
approved
$2,747,000 paid
90 jobs
Environment Southland CRP - Wyndham Stopbank Upgrade
Southland Regional CouncilTo upgrade the stopbank along the section of the Mataura River passing through Wyndham, increasing it's strength and height.
$2,692,441
approved
$2,692,441 paid
146 jobs
Waikato CRP - Piako River Mouth, Right Bank Asset Rationalisation
Waikato Regional CouncilTo future proof the pump station foundation and upgrade access, relocate three underperforming floodgates to alternative locations for greater flood resilience, and rationalisation of aging stopbanks.
$2,638,416
approved
$2,638,416 paid
48 jobs
Environment Southland CRP - Gore Stopbank Upgrade
Southland Regional CouncilTo upgrade the stopbank along the section of the Mataura River passing through Gore District, increasing it's strength and height.
$2,561,038
approved
$2,561,038 paid
138 jobs
Development of Ruakākā Recreation Centre
Ruakaka Recreation Centre IncorporatedTo complete stage one construction of the new Recreation Centre at Ruakākā that includes a gymnasium and meeting rooms.
$2,500,000
approved
$2,500,000 paid
973 jobs
Flaxmere Housing Developments - Services and Roading (‘Waingakau’) (IRG)
Te Taiwhenua O Heretaunga (TToH)Complete civil roadwork along Mawson Avenue, Ryde Place and Frobisher Street, Flaxmere.
$2,500,000
approved
$2,500,000 paid
155 jobs
Mangawhai Package (jetty, community and infrastructure facilities) (IRG) - Shared Pathway
Kaipara District CouncilTo construct 3.2km of shared pathways, made up of concrete, timber boardwalk or aggregate and will be completed simultaneously with other community transport improvements.
$2,400,000
approved
$2,400,000 paid
69 jobs
Conical Hill Fly-line at Hanmer Springs
Hurunui District CouncilThe construction of a Fly-ride attraction on Conical Hill at Hanmer Springs.
$2,150,000
approved
$550,000 paid
2 jobs
Pohe Island Bike Park (IRG)
Whangārei District CouncilThe project will develop a bike park located at William Fraser Memorial Park on Pohe Island in Whangarei. The project includes upgrades to an existing building to provide an all-weather multi-use facility and surrounding landscaping and other works.
$2,000,000
approved
$2,000,000 paid
Ōtorohanga Kiwi House Development
Otorohanga Kiwi House Charitable TrustTo construct an Information Centre, Nocturnal House with augmented reality interactive space, and several free-flight aviaries, as well as refurbishment and rebuild of existing enclosures and breed-for-release and pre-release facilities.
$2,000,000
approved
$2,000,000 paid
0Mid-North Sports Package - Waipapa
Far North District CouncilTo develop five football fields, a carpark, a small changing room and toilet facility, including the necessary civil works.
$2,000,000
approved
$2,000,000 paid
215 jobs
Lakes District Museum, Arrowtown Seismic Strengthening and Restoration Project (IRG)
Lakes District Museum IncThe Recipient will be undertaking seismic strengthening and restoration of the Lakes District Museum
$2,000,000
approved
$2,000,000 paid
250 jobs
Flaxmere Housing Developments - Services and Roading (‘Tarbet Street’) (IRG)
Hastings District CouncilThis project is specifically for road construction and infrastructure in Tarbet Street which is separate from but enables a legally formed subdivision to allow the sale of ready to build affordable lots to the public.
$2,000,000
approved
$1,847,607 paid
34 jobs
West Coast CRP - Māwhera Quay Flood Protection Wall upgrade Stage 2
West Coast Regional CouncilTo complete Stage Two of the Greymouth Floodwall upgrade to a 1 in 150-year Annual Exceedance Probability standard.
$1,954,365
approved
$1,954,365 paid
Vessel Construction for Waikato River Management
Waikato Regional CouncilTo construct a new replacement barge for use along Waikato River system, which is a critical infrastructure asset required for effective river management activities.
$1,920,000
approved
$1,920,000 paid
64 jobs
Waikato CRP - Foreshore East and West Stopbank
Waikato Regional CouncilTo restore and strengthen existing stopbanks along the east and west foreshore to protect the Hauraki Plains and restore drainage and fencing along waterways.
$1,920,000
approved
$1,920,000 paid
27 jobs
Awarua Rūnanga - New Kaumātua housing (IRG)
Te Runaka O Awarua Charitable TrustTo deliver six new 50m2 modular dwelling units into Bluff, targeted at low income kaumatua and pakeke.
$1,898,000
approved
$1,898,000 paid
58 jobs
Development of Marton Rail Hub
Rangitikei District CouncilTo facilitate and operationalise the development of the Marton Rail Hub, by purchasing land, developing the log yard, rail siding and access road.
$1,887,000
approved
$1,887,000 paid
0Children’s Cycling Education Park And Half Basketball Court (IRG)
Stratford District CouncilThis project will see the construction of a bicycle park and half basketball court to replace an existing but aged facility.
$1,870,000
approved
$1,846,273 paid
33 jobs
Port Package (IRG) - Westport Gravel removal & Wharf repairs
Buller District CouncilThis project is for the extraction of gravel build up around half-tide wall and involves dredging and removal of gravel. Repairs will also be made to the seawalls alongside Westport.
$1,832,410
approved
$1,832,410 paid
23 jobs
He Korowai Trust housing infrastructure (IRG)
He Korowai TrustTo develop 24 sites for houses on land owned by the He Korowai Trust, which will include the site works, services, connections, internal roads and cover the consent costs and professional fees.
$1,829,000
approved
$1,829,000 paid
10 jobs
Tidal Creek #2 Bridge Replacement (IRG)
Buller District CouncilThe replacement of the Tidal Creek No.2 bridge over Tidal Creek on the Karamea Highway and construct all associated road realignment and safety improvements as necessary.
$1,800,000
approved
$1,800,000 paid
7 jobs
Dawson Falls Lodge Rebuild - Loan
Te Rere O Kapuni LimitedRebuild of iwi owned Dawson Falls lodge, enabling the lodge to be positioned as an exceptional cultural tourism destination.
$1,763,000
approved
$1,763,000 paid
12 jobs
Maungaturoto Dementia Care Facility (IRG)
Maungaturoto Community Charitable Trust IncThis project is to complete construction of a new purpose built secure facility for dementia care in Maungaturoto, as part of an existing rest home complex.
$1,750,000
approved
$1,750,000 paid
11 jobs
Mangonui Waterfront Facilities Enhancement and Regeneration (IRG)
Far North District CouncilThe project will create 30-40 additional vehicle parks, a pontoon and jetty, and improve access to and along the Mangonui Waterfront. The scope has been narrowed to fit within the announced CIP funding figure of $1.75 million by removing one pontoon, wharf extension truck turning area, and a 4km shared pathway.The PDU recommends increasing government funding from $1.5m to $1.75m because Far North Holdings Ltd has advised that a $250,000 shortfall would not enable it to include the pontoon and jetty within the project scope.This additional funding from the original amount approved will need to be met from the IRG contingency.
$1,750,000
approved
$1,750,000 paid
30 jobs
Cron Street Extension , Cron Street Footpath Extension, Old Christchurch Road Seal Extension (IRG) - Cron Street Extension, Cron Street Footpath Extension
Westland District CouncilCron Street extension: the extension and sealing of Cron street beyond Kamahi Crescent in Franz Josef township, including the installation of parking and a footpath. Cron Street footpath extension: the creation of a footpath and parking bays along Cron Street between Kamahi Crescent and Cowan Place. Old Christchurch Road seal extension: the widening and sealing of up to 12.76km of Old Christchurch Road in the Arahura/Kawhaka Valley.
$1,545,892
approved
$1,545,892 paid
22 jobs
Construction of Tauwharenīkau cycle bridge and trail
South Wairarapa District CouncilTo construct a pedestrian and cycling suspension bridge across the Tauwharenīkau river in Featherston as part of a wider recreational trail network (Five Towns Trails) that connects the five small towns in the Wairarapa.
$1,530,000
approved
$1,530,000 paid
0Northland Rugby (IRG)
Northland Rugby UnionThe Recipient will use the Funding to deliver the construction of four buildings(comprising a club room, changing rooms, a gym and an office) at 136 Riverside Drive,Whangarei, as
$1,500,000
approved
$1,500,000 paid
217 jobs
Environment Southland CRP - Mataura Town Stopbanks (IRG)
Southland Regional CouncilTo upgrade the stopbank along the section of the Mataura River passing through Mataura, increasing it's strength and height.
$1,481,087
approved
$1,481,087 paid
122 jobs
Environment Canterbury CRP - Waimakariri River – McIntosh’s Bend - Kaiapoi Community Flood Protection Project (IRG)
Environment CanterburyThis project is a flood management programme that will strengthen existing stopbanks and flood defences at McIntosh’s Bend where a local weakness exists.
$1,477,649
approved
$1,477,649 paid
91 jobs
Kaipara CRP - Dargaville to Te Kōpuru Stopbank
Kaipara District CouncilTo upgrade the existing 10.7 kilometre stopbank from Dargaville to Te Kopuru.
$1,445,890
approved
$1,445,890 paid
17 jobs
Environment Southland CRP - Invercargill Stopbank Upgrade
Southland Regional CouncilTo upgrade the stopbank along the section of the Otepuni Creek and Waihopai River passing through Invercargill District, increasing it's strength and height.
$1,444,467
approved
$1,444,467 paid
81 jobs
Te Māhurehure Expansion Projects - Te Kāingā Atawhai Papakāinga Housing Project
Te Kainga Atawhai Housing LimitedTo construct an urban Māori housing development at Te Māhurehure marae that includes 6x one-bed apartments, 4x two-bed and 4x three-bed two-storied apartments and traditional elements of Papakāinga.
$1,400,000
approved
$1,400,000 paid
0West Coast Port Package - Westport Bulk & Shipping Precincts
Buller District CouncilConstruction and upgrade of Westport port precinct infrastructure including new water and electricity reticulation, toilet and shower facilities, oil and waste disposal, security and fencing, upgrade of the harbour master offices and upgrade and repair of wharfing infrastructure.
$1,364,193
approved
$1,364,193 paid
Waikato CRP - Mill Road Pump Station (IRG)
Waikato Regional CouncilThis project will upgrade the Mill Road Pumps stations. These assets protect the Paeroa community from flooding, but are one of the highest risk rated assets due to the importance of urban protection.
$1,303,040
approved
$1,303,040 paid
23 jobs
Masterton Skatepark Revamp (IRG)
Masterton District CouncilThe project will improve the skatepark with new design and construction to a level where it is safe, practical and attractive to all skateboarders. This popular venue is currently marred by being tired, without a shelter, surrounded by broken seats and cracks in the concrete. The PDU recommends increasing Government funding $1.000m to $1.300m because further costings have been done and the cost of this project has increased. Additional funding from the original amount approved will be met from the IRG contingency.
$1,300,000
approved
$1,300,000 paid
9 jobs
Dawson Falls Lodge Development (IRG) (Grant)
Ngā Rere Ora LimitedRebuild of iwi owned Dawson Falls lodge, enabling the lodge to be positioned as an exceptional cultural tourism destination.
$1,237,000
approved
$1,237,000 paid
Waikato CRP - Roger Harris Pump-station Upgrade
Waikato Regional CouncilTo upgrade Roger Harris pump station, to ensure the pumping capacity of the Mill Road Pump Station function to protect Paeroa from flooding.
$1,204,444
approved
$1,204,444 paid
214 jobs
Kapiti Gateway (IRG)
Kāpiti Coast District CouncilConstruction of a Kapiti tourist visitor centre and biosecurity pod for visitors to Kapiti Island.
$1,115,000
approved
$557,000 paid
8 jobs
Kaikōura Aquatic Centre (IRG)
Kaikoura District CouncilConstruction of the Kaikōura Aquatic Centre in Scarborough Street, Kaikōura
$1,000,000
approved
$1,000,000 paid
16 jobs
Apollo Aviation commercialisation of autonomous aircraft
Apollo AviationTo establish a commercially operating freight business using certified NZ planes fitted with Merlin Labs Inc US technology and seek Civil Aviation Authority for use of autonomous flight in New Zealand.
$1,000,000
approved
$1,000,000 paid
17 jobs
Whāngārei Boys High School (IRG)
The Whangārei Boys High School Board of TrusteesThe project will develop an engineering academy / facility on the school site. The development consists primarily of a 20m x 20m (400m2) x 5m high workshop building and associated works. The building will be used as a practical engineering and trades training facility for students from Whangarei Boy’s High School and surrounding schools from the district.
$1,000,000
approved
$1,000,000 paid
0Hector Historic Landfill (IRG)
Buller District CouncilDesign and construction of a seawall to protect an historic landfill at Hector from coastal erosion. The project includes all ancillary works necessary to enable fit-for-purpose design and construction such as, but not limited to survey, contaminated land management, disposal of cut-to-waste and safe reinstatement of the site.
$1,000,000
approved
$864,696 paid
Gore Multisports Complex Facilities Improvements (IRG)
Gore District CouncilThe project will enable the upgrade of:1. Gore Aquatic Centre where the existing roofing will be replaced and the ventilation system in the filtration plant room is improved to minimise the corrosive environment, and2. MLT Event Centre where the roof will be replaced to construct safe access to the roof to access the condenser fan units.
$1,000,000
approved
$1,000,000 paid
30 jobs
Animal Shelters (IRG)
Far North District CouncilThe project will deliver two new fully compliant animal shelters at 303 Bonnett Road, Kaitaia and 271 Ngapuhi Road, Kaikohe.
$1,000,000
approved
$1,000,000 paid
73 jobs
Environment Canterbury CRP - Ashley Rakahuri River Protection and Fairway Management
Environment CanterburyTo undertake a flood management programme to remove vegetation that is currently choking the river causing it to spread laterally resulting in erosion and loss of productive farmland.
$923,789
approved
$923,789 paid
262 jobs
Dargaville Racecourse (IRG)
Dargaville Racing Club IncorporatedThe project is to secure a Private Plan Change to the Kaipara District Plan. The purpose of the change is to allow subdivision and development of land currently owned by Dargaville Racing Club Incorporated into a multi-use development site, encompassing a large residential area with a range of affordable housing, a 120 unit retirement village, a reserve, and a commercial area for shops, cafes and appropriate light commercial.
$900,000
approved
$845,754 paid
0Otago CRP - Outram Flood Protection (IRG)
Otago Regional CouncilThis project is a flood management programme, which will constructing a weighting blanket, seal or replace culvert, construct bottom storm water drains and refill weak zones caused by tree roots.
$812,800
approved
$812,800 paid
22 jobs
Paihia Waterfront Development (IRG)
Far North District CouncilThis project will create a “basin” off the Paihia foreshore through the construction of two reef-type breakwaters in the vicinity of Motumaire Island, a rock abutment. This project will also complete associated dredging work at Horututu Beach, which create a new vessel navigation channel and allow vessel movement within the new basin.
$800,000
approved
$800,000 paid
4 jobs
Pāpāmoa Surf Rescue Base and Mixed Use Community Facility (IRG)
Papamoa Community Surf Rescue Base TrustThe project will complete the development of their new surf lifesaving club and mixed-use community facility in Pāpāmoa. The build began in September 2019 after years of fundraising and is projected to be complete in December 2020.
$800,000
approved
$800,000 paid
Te Kūiti Sports Stadium (IRG)
Waitomo District CouncilThe project will construct an indoor sports and recreation facility comprising of two indoor courts, a multi-purpose room, a fitness centre, changing rooms, administration, reception and carpark in Te Kuiti.
$775,431
approved
$775,431 paid
Waikato CRP - Piako River, Ngatea Town Left Stopbank (IRG)
Waikato Regional CouncilThis project will increase the height and strength of stop bank on the left bank at Ngatea, and the last remaining sections of non-compliant stop bank between Ngatea and Pipiroa along the right and left banks.
$768,000
approved
$768,000 paid
55 jobs
Development of Paparoa Housing
Paparoa Community Charitable TrustTo complete the development of a 29-lot subdivision including civil works and subdivision services that includes construction of three homes and a community centre purposely designed for retirement living.
$750,000
approved
$750,000 paid
0Northland Inc (IRG)
Northland Inc LimitedTo provide financial support to Northland Economic Development Agency for portfolio management of economic development investment in the region.
$750,000
approved
$750,000 paid
4 jobs
Kaiwaka footbridges (IRG)
Kaipara District CouncilConstruct two bridges in Kaiwaka, which are approximately 25 metres each in length. The project will also construct a pathway with associated landscaping which will provide safe walking and cycling through Kaiwaka township. The pathway will link shops, schools, public transport stops and the park so that the community do not have to navigate SH1 to move around the township
$750,000
approved
$750,000 paid
12 jobs
Tairua Surf Life Saving Community Infrastructure Rebuild
Tairua Surf Life Saving ClubTo rebuild the existing facility to ensure capability and continuity of surf lifesaving and other support services to the local community.
$699,000
approved
$699,000 paid
Pauanui Surf Life Saving Community Infrastructure Upgrade
Pauanui Surf Life Saving ClubTo upgrade infrastructure of the Surf Club and patrol tower, expanding the existing building with additional storage for rescue equipment and replace the cladding and roofing.
$676,000
approved
$608,400 paid
Hawke's Bay CRP - Wairoa River Scheme - River Parade Scour Protection
Hawke's Bay Regional CouncilThis project is a flood management programme comprising activities to protect Wairoa River Bank from erosion, which is an imminent threat to infrastructure and property. Protection will be provided by construction of a sheet pile wall and reinstatement planting, and restoration work.
$640,000
approved
$640,000 paid
137 jobs
Hawke's Bay CRP - Upper Tukituki Flood Control Scheme - SH50 Bridge (IRG)
Hawke's Bay Regional CouncilA flood management programme to construct soft and hard edge river bank protection and protection to the abutment to State Highway 50 Waipawa Bridge.
$640,000
approved
$640,000 paid
Otago CRP - Riverbank Road Flood Protection, Lower Clutha. Stabilising critical flood protection infrastructure for Clutha Delta area (IRG)
Otago Regional CouncilThis project is a flood management programme that involves repair work for 150m of stabilisation on steep bank then reinstatement of road along the Clutha River stop bank
$608,000
approved
$608,000 paid
25 jobs
Environment Southland CRP - Waiau Flood Repairs (IRG)
Southland Regional CouncilThe project will repair damaged /eroded river bank, placing protective material to mitigate risk of erosion due to the Nov/ Dec 2019 floods, erosion has caused large areas of riverbank throughout the lower Waiau to erode away sending sediment down to the lagoon at the estuary.
$597,197
approved
$597,197 paid
36 jobs
Environment Canterbury CRP - Waiau Township Stopbank Repairs and Upgrades (IRG)
Environment CanterburyThis project is a flood management programme, which will repair and upgrade the Waiau River stopbank.
$562,343
approved
$562,343 paid
155 jobs
Mid-North Sports Package - Te Haa
Our Kerikeri Community Charitable TrustThe project will construct, Te Haa o Te Ao “The Breath of the World,” an entranceway sculpture and beautification of the roundabout at State Highway 10 and Kerikeri Road intersection. The project has been re-scoped to align with the IRG funding approved in principle. The recipient will deliver “Stage One” which is the sculpture, and at a later date deliver “Stage Two” the landscaping, with their own funding. Noting the original scope included both stages.
$550,000
approved
$550,000 paid
0Port Package (IRG) - Port Jackson Wharf Repairs
Westland District CouncilReplacement of the causeway and main wharf piles, beams, cross bracing and fixtures; and maintenance repairs to timber members to extend the life of the existing wharf structure.
$500,000
approved
$500,000 paid
8 jobs
Active Modes Urban Shared Paths Programme (IRG) - Tikipunga Cycle Trail, Stage 2
Whangārei District CouncilThe project will enable Whangarei District Council to construct more shared biking and walking pathways in Kamo, Raumanga and Tikipunga within the urban Whangarei area ($6 million)
$500,000
approved
$500,000 paid
9 jobs
Active Modes Urban Shared Paths Programme (IRG) - Kamo Shared Path, Kensington Park Link
Whangārei District CouncilThe project will enable Whangarei District Council to construct more shared biking and walking pathways in Kamo, Raumanga and Tikipunga within the urban Whangarei area ($6 million), construct a bridge and expand a portion of Port Road from two to four lanes and to also include a cycle/walking pathway ($10 million).
$500,000
approved
$500,000 paid
40 jobs
Sunset Beach Community Hub and Lifeguard Facility (IRG)
Waikato District CouncilThis project, which has already commenced, will construct a community hub and redevelop the Sunset Beach Lifesaving Facility attached to the community hub at Port Waikato. The works include lifeguard premises, first aid room, and open room area for community use.
$454,000
approved
$454,000 paid
Waikato CRP - Lake Kimihia, Ecological and Cultural Enhancement
Waikato Regional CouncilTo improve access to the sites, construct two culverts and complete works including rock protection, vegetation clearance, cultural assessment and planting, pest fish barrier, vegetative pest control and wetland restoration.
$451,330
approved
$451,330 paid
5 jobs
West Coast CRP - Buller River Flood warning system
West Coast Regional CouncilTo install and operate a new flood warning system in the Buller River catchment.
$370,634
approved
$370,634 paid
Northland CRP - Panguru (IRG)
Northland Regional CouncilThe project will provide funding to complete a flood management programme, which is a joint venture between the New Zealand Transport Agency (NZTA) and the Far North District Council. The project is 90% completed, but was interrupted by the COVID-19 lockdown.
$361,683
approved
$361,683 paid
14 jobs
Otago CRP - Upgrade and Installation of ORC Flow Management Structures at Robson Lagoon (IRG)
Otago Regional CouncilTo upgrade and install of flow management structures, which are critical for flood management to preserve the natural values of Robsons Lagoon and the Lake Tuakitoto.
$352,000
approved
$351,999 paid
19 jobs
Onemana Surf Life Saving Community Infrastructure Upgrade (IRG)
Onemana Surf Life Saving ClubThis project will upgrade the Onemana Community Surf Lifesaving Club so that it is a fit for purpose building, which is capable of providing surf lifesaving support services to the local community. The building will be waterproofed and strengthened and an upper level will be added which will provide wide views of the beach for surf patrol purposes and a club and community meeting area for year round use.
$317,000
approved
$317,000 paid
110 jobs
Ophir Peace Memorial Hall (IRG)
Central Otago District CouncilThe project will upgrade of the Ophir Peace Memorial Hall, which includes replacing existing toilet block, a new extension to the hall, providing a compliant toilet facility with external access, accessibility upgrades for entry to and within the building, structural and seismic strengthening, and electrical upgrades to basic electrics, fire alarms and emergency lighting.
$210,000
approved
$210,000 paid
5 jobs
Hot Water Beach Surf Life Saving Club (IRG)
Hot Water Beach Lifeguard Service Inc.This project will build a fit for purpose cabin at Hot Water Beach in the Coromandel that will house the emergency equipment with a first aid room and provide shelter for lifeguards to have shelter from the weather elements located on 35 Pye Place, Hot Water Beach, Coromandel.
$167,000
approved
$167,000 paid
Baylys Beach Community Trust - Lifesaving Facility Development (IRG)
Baylys Beach Community Centre TrustBuild a new Community Centre and combined facility for lifesaving services delivery at this increasingly popular West Coast Northland beach
$100,000
approved
$98,713 paid
Ophir Swimming Pool (IRG)
Central Otago District CouncilThe project will upgrade the Ophir Community Swimming Pool facility. The scope of work includes replacing existing changing room building and the water supply pipework.
$60,000
approved
$60,000 paid
3 jobs