Funding Projects
105 projects funded through Kanoa programmes
Showing 105 of 105 projects
Opuha Dam and Irrigation Scheme
Opuha Water LimitedTo upgrade the Opuha Dam and irrigation scheme to ensure the longevity of this crucial asset for South Canterbury.
$20,800,000
approved
The Balmoral Water Storage Facility
Amuri Irrigation Company LimitedTo construct a new 10Mm3 water storage facility, upgrade the existing fish screen and race modifications.
$20,000,000
approved
Carterton Water Storage Project
Carterton District CouncilEstablishing a medium scale water storage facility for industrial water supply and agricultural use in Carterton.
$20,000,000
approved
Te Waihekeora Pipe Network Extension (Kaipara Pipeline)
Te Tai Tokerau Water TrustTo develop a large bore water pipeline between the Initial stage of the Kaipara Water Scheme and the Kaihu River enabling provision of water to a wider area, future proofing of pipeline connecting the Kaipara Delta to a reliable Kaihu River source and enablement of quadrupling the irrigated development across the Kaipara Agricultural Delta to 4000ha.
$17,500,000
approved
$1,000,000 paid
Waimakariri Irrigation Scheme Upgrade
Waimakariri Irrigation LimitedTo construct two water storage ponds, with a combined capacity of 8.2 million cubic metres, to store excess water diverted from the Waimakariri River during high flow or low scheme demand.
$15,600,000
approved
Rakiura Stewart Island Renewable Energy Project
Southland District CouncilTo install renewable energy generation infrastructure to compliment current electricity supplied through diesel generators, to an alternative electricity source likely to include solar/wind generation and battery storage.
$15,350,000
approved
Commissioning Infrastructure and Mid North Pipeline - Pipeline
Te Tai Tokerau Water TrustTo build commissioning infrastructure at Otawere Reservoir and construct a 15 kilometre water distribution pipeline for the Mid North.
$13,000,000
approved
Turanga Fast Five Horticulture
Te Aitanga a Mahaki TrustTo develop 70 hectares of horticultural land into pipfruit. Applicant has received $7.000 million of RSPF funding for another horticulture project.
$11,926,000
approved
Commissioning Infrastructure and Mid North Pipeline - Otawere Reservoir
Te Tai Tokerau Water TrustTo build commissioning infrastructure at Otawere Reservoir and construct a 15 kilometre water distribution pipeline for the Mid North.
$11,000,000
approved
$11,000,000 paid
Environment Southland - Mataura River Flood Protection Improvements (Gore and Mataura)
Southland Regional CouncilIncludes gravel realignment and extraction, rock wall and stopbank extension and strengthening, and construction of new floodbanks. It also includes data validation, land access agreements, and flood protection works along the Gore and Mataura rivers.
$10,800,000
approved
Bay of Plenty Regional Council - Project Future Proof Whakatāne-Tauranga Rivers Scheme
Bay of Plenty Regional CouncilTo upgrade existing stopbanks and floodwalls in the Whakatane CBD to meet one in a hundred year levels of flood protection and provide mitigation for climate change.
$10,690,000
approved
$1,426,287 paid
7 jobs
Overhaul and Modernise Key Visitor Infrastructure at Waitangi
Waitangi LimitedTo replace and improve critical infrastructure on the Waitangi Treaty Grounds and wider estate, with a focus on historical buildings and other assets that are nearing their end of life.
$10,200,000
approved
$6,000,000 paid
21 jobs
Marlborough District Council - Lower Wairau Stopbank Upgrades
Marlborough District CouncilThe project aims to upgrade and realign stopbanks at the narrowest point of the Lower Wairau river, increasing protection to agricultural/horticultural assets, residential and commercial, state highway and local roading networks, rail, energy, schools and municipal infrastructure.
$10,200,000
approved
Rātana Pā Revitalising Infrastructure
Ratana Orakeinui Trust IncorporatedTo upgrade existing infrastructure at Rātana Pā, replacing roofing, cladding, flooring, and other priority works that contribute to ongoing use for future generations.
$10,150,000
approved
$1,300,000 paid
0Marlborough Sounds Marine Access - Havelock
Port Marlborough New Zealand LimitedThe project establishes a fit for purpose marine transport channel and berthage infrastructure to effectively service the aquaculture industry and the resilience need of Marlborough Sounds residents, businesses and communities.
$9,887,000
approved
Hokitika Airport Redevelopment
Westland District CouncilTo upgrade Hokitika Airport installing navigation lighting, replace the chipseal tarmac with bitumen, and lengthen runway starter extensions available for take-off.
$9,800,000
approved
Tasman District Council - Lower Motueka River Stopbanks Level of Service Upgrade
Tasman District CouncilThe project aims to construct new – and upgrade existing – stopbanks and associated flood resilience infrastructure at the Lower Motueka River (near Motueka) increasing protection to agricultural/horticultural assets, residential, commercial and industrial, state highway and local roading networks, aerodrome, port, schools, bridges, a crop and food research facility and municipal infrastructure.
$9,480,000
approved
Bay of Plenty Regional Council - Kaituna Catchment Control Scheme Upgrades
Bay of Plenty Regional CouncilTo upgrade flood protection for Te Puke and wider Kaituna catchment with installation of replacement pump station for Ford Road, a new pump station downstream of the Te Puke township and Kaituna Catchment Control Scheme Stopbank Upgrades.
$8,420,000
approved
$3,149,906 paid
1 jobs
Southern Link Logistics Park Mosgiel - Stage 1
Southern Edge Hub Farms limitedTo construct stage one of the Southern Link Logistics Park which is a 40 hectare site including warehousing and container facilities.
$8,200,000
approved
Horizons Regional Council - Te Pūwaha Lower Whanganui River flood Resilience Strengthening
Horizons Regional CouncilThe project will upgrade stopbank infrastructure around Whanganui Port and nearby residential, commercial, industrial, local roading network, marae and municipal infrastructure.
$7,875,000
approved
Dargaville Te Kōpuru Stopbank (RIF Tranche 1) - Te Tai Tokerau Water Trust
Te Tai Tokerau Water TrustThe Project is for construction of an approximately 11km stop-bank along the river-right bank of the Wairoa River between Dargaville and Te Kopuru that protects productive land and other assets from a 1 in 100 year flood event
$7,800,000
approved
0National - Regional Flood Warning Infrastructure Upgrades and Installation
Environment CanterburyTo upgrade and install new and reliable telemetered flood warning infrastructure to provide stronger data and better enable forecasting to reduce the impacts of adverse weather before, during and post flood events.
$7,458,000
approved
Wairoa Horticultural Infrastructure and Resilience Project
Tātau Tātau o te Wairoa Horticulture Limited PartnershipTo expand horticulture activities including 20 hectares of pipfruit infrastructure, increased water storage and a post-harvest facility.
$6,827,000
approved
Tasman District Council - Lower Motueka River Stopbank Refurbishment
Tasman District CouncilTo refurbish the Lower Motueka River stopbanks bringing the stopbank network up to a well-maintained condition, including placement of an extra width of compacted clay to the river side of the stopbank and lifting the height of the stopbank to provide protection to an acceptable level and increasing the crest width to allow for safe maintenance vehicle access along the stopbanks, protecting approximately 1,400 hectares of fertile and productive land that surrounds Motueka which houses orchards, homes, farms, and other businesses.
$6,600,000
approved
$1,346,403 paid
1 jobs
West Coast Regional Council - Stopbank - Waiho River Northside Havill Wall Extension and Southside Protection
West Coast Regional CouncilTo increase and maintain protection on the Waiho River on a "Hold the Line" basis.
$6,000,000
approved
$383,586 paid
0Parihaka Wastewater Project
Parihaka Papakainga TrustTo design and install a modern wastewater system for existing and future residents on the Parihaka papakāinga, and remediate any damage caused by the current wastewater system.
$5,800,000
approved
$4,000,000 paid
1 jobs
Otago Regional Council - West Taieri Resilience Upgrade
Otago Regional CouncilTo complete reconstruction for the remaining length of the floodbank, including associated asset renewals, up to three bridges, and further improvements to work completed previously on Stages 1-4 of the Contour Channel, protecting 7300 hectares of farmland and the Dunedin Airport.
$5,400,000
approved
$751,678 paid
0Nelson City Council - Maitai Flood Management Project
Nelson City CouncilTo construct flood management infrastructure including rebuild of an existing reinforced concrete intake with connecting culvert upgrade, drainage diversion including intake and discharge structures, flood wall upgrade and approximately 350m of stopbank including potential localised realignment of existing stopbank, riverbank benching and road raising.
$5,400,000
approved
$514,982 paid
0Buller District Council - Buller River Stopbank Infrastructure
Buller District CouncilThe project intends to construct infrastructure including flood water drains/gates to enable stopbanks and install water pumps at various sites in Westport
$5,271,735
approved
Waikato Regional Council - Lower Waikato Stopbank Upgrade
Waikato Regional CouncilTo upgrade up to 13.8km of stopbanks in the Tuakau area on the Lower Waikato River, enabling a one in a hundred year modelled flood protection level.
$5,220,000
approved
$1,021,422 paid
0Supercritical Geothermal Energy
Ministry of Business, Innovation & Employment (Kānoa - RDU)To construct the first of three deep supercritical geothermal exploration wells and prove the supercritical geothermal resource.
$5,000,000
approved
$131,982 paid
Te Kaha Microgrid Battery
Te Huata Solar Limited PartnershipTo install enabling energy infrastructure (via a battery solution) in Te Kaha to maximise the generation potential of the solar array currently being constructed.
$4,751,000
approved
Waikato Regional Council - Lower Piako River Stopbank Upgrades
Waikato Regional CouncilMulti-year programme of earthworks to strengthen and raise stopbanks, reshape embankments, and improve drainage infrastructure in and around the townships of Ngatea, Patetonga and Kerepehi.
$4,200,000
approved
Environment Southland - Invercargill and Oreti Flood Resilience Stopbank Upgrades
Southland Regional CouncilStrengthening and remediation of stopbanks in the Invercargill and Oreti flood protection schemes. Key works include site preparation, remediation of contaminated sites, rock armouring, flood wall construction, gravel and vegetation management, and upgrades to the Otepuni and Oreti stopbanks.
$4,110,000
approved
Nelson City Council - Nelson Floods Repairs / Flood Risk Protection
Nelson City CouncilTo upgrade resilience infrastructure including approximately 50m of stream bank retaining works, stream culvert upgrades, localised stream channel improvements, secondary flowpath diversion works, drainage diversion to new wetland, raising a section of Athol Street to protect residential property, and realigning a section of the stopbank upstream of Glen Road.
$3,600,000
approved
$451,519 paid
2 jobs
Marlborough District Council - Lower Wairau Flood Capacity Upgrade
Marlborough District CouncilTo upgrade over 9km of stopbanks along the Lower Wairau, which is home to an historic Pā site and Māori land, featuring houses and businesses that are disproportionately affected by flooding.
$3,600,000
approved
$293,011 paid
3 jobs
Westport Harbour Infrastructure
Buller District CouncilTo complete resilience and commercial partnership initiatives at Westport Port including expansion of the pontoon facility, upgrade of The Fisherman Wharf, installation of a roll-on/roll-off facility, upgrade of the Kawatiri dredge, and wharf infrastructure, partnering with Westland Mineral Sands.
$3,216,000
approved
$1,046,910 paid
Bay of Plenty Regional Council -Rangitāiki-Tarawera Rivers Scheme Flood Resilience Improvements
Bay of Plenty Regional CouncilUpgrades to stopbanks and canals across several river sections, including geotechnical investigations, detailed design, and construction works at Kōkōhinau, the Tarawera River, Rangitāiki River, and Rangitāiki Canals.
$3,120,000
approved
Waikato Regional Council - Kirikiri Stopbank Upgrade
Waikato Regional CouncilTo upgrade 3.7km of stopbanks that run from the mouth of the Kirikiri Stream to the SH26 Bridge just south of Kōpū, enabling a one in a hundred year flood protection level.
$3,060,000
approved
$1,383,575 paid
Turanganui-a-Kiwa Groundwater Replenishment Project
Makauri Aquifer Recharge LimitedTo develop detailed design, obtain resource consent and develop infrastructure to support groundwater replenishment to arrest decline and salinisation of the Makauri aquifer.
$3,000,000
approved
Environment Southland - Oreti River Catchment Flood Protection Upgrade
Southland Regional CouncilTo improve the resilience of the current assets, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.
$3,000,000
approved
$129,923 paid
0Tukituki Water Security Project
Tukituki Water Security LimitedTo develop a commercial and financial case that supports investment in and construction of water storage and distribution infrastructure complementary to other projects, satisfying environmental, community, and commercial objectives prioritised by the region.
$3,000,000
approved
$200,000 paid
0Te Kao Community Microgrid
Tū Mai Rā Energy General Partner LimitedTo enable local Māori economic development by constructing a solar and wind powered microgrid connected to a community battery ensuring consistency of low cost energy supply to the community and local businesses.
$3,000,000
approved
0Marlborough District Council - Wairau River Flood Protection Scheme
Marlborough District CouncilTo undertake stopbank retreat and realignment work, construction of new intermediate groynes, rock edge protection at the Waihopai/Wairau confluence, and upgrade of a critical Waihopai stopbank that overtopped in the 2021 flood event.
$2,880,000
approved
$448,382 paid
3 jobs
Up-Scaling UV Disinfection Manufacturing
Novolabs LimitedTo scale up an advanced manufacturing business producing disinfection equipment for applications in food production, dairy farming, and other industries.
$2,775,000
approved
$500,000 paid
Ngā Wāhi Tapu o Pukerangiora
Pukerangiora IncorporatedTo deliver a range of physical work tocreate a safe and cohesive site that enables the hosting and education of visitors at a site of cultural significance in Taranaki.
$2,771,000
approved
0Bay of Plenty Regional Council - Whakatāne River Flood Resilience Infrastructure Upgrades
Bay of Plenty Regional CouncilRepairing and strengthening stopbanks, replacing culverts, and implementing seepage control measures at key sites such as Trident Stopbank, Awatapu Lagoon, and the Whakatāne Canals.
$2,640,000
approved
Waikato Regional Council - Waikato, Waipa and West Coast Erosion and Sediment Reduction
Waikato Regional CouncilStrengthening natural riverbanks and reducing sedimentation across the Lower Waikato, Waipa, and West Coast catchments. Works include erosion control, bank stabilisation, and sediment removal to improve waterway capacity and resilience.
$2,502,000
approved
GWRC - Ōtaki - Site 9 - Ōtaki Cliffs, Ōtaki Awa
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Ōtaki Awa, protecting the base of the Ōtaki cliffs to limit further erosion in line with the recommendations of the Ōtaki Floodplain Management Plan.
$2,500,000
approved
$310,702 paid
0Environment Canterbury - Waitarakao / Washdyke / Seadown Works
Environment CanterburyTo upgrade the stopbank and drainage network, including investigations, consenting, drain relocation and retreat, stopbank rebuild, wetland creation and enhancement, and planting which will protect the Timaru waste water treatment plant, large industrial area, roading infrastructure and private land.
$2,400,000
approved
$95,495 paid
2 jobs
Environment Canterbury - Regional Infrastructure Upgrades and Adaptation Programme #2
Environment CanterburySurveying, geotechnical investigations, and design work to support the construction of upgraded stopbanks and associated flood infrastructure across multiple sites including Tinwald, Lake Hood, Rangitata, and Staverly.
$2,400,000
approved
West Coast Regional Council - Greymouth Flood Resilience Upgrades Stages 2/4/5
West Coast Regional CouncilDevelop new and upgrade existing stopbanks across Greymouth township including Blaketown and Cobden. Works will provide increased protection to residential, commercial, industrial, state highway and local roading networks, rail, schools, aerodrome and municipal infrastructure.
$2,400,000
approved
West Coast Regional Council - Hokitika Stopbank Construction Stage 3
West Coast Regional CouncilUpgrade existing stopbanks to provide increased protection to agricultural, horticultural and residential, assets, state highway and local roading networks, schools, aerodrome and municipal infrastructure.
$2,400,000
approved
Mautaua Horticulture Project
Ngati Pahauwera Commercial Development LimitedTo develop 30 hectares of orchard at existing 60-hectare site near Raupunga.
$2,358,000
approved
Greymouth Port Infrastructure
Grey District CouncilTo complete resilience and commercial partnership initiatives at Greymouth Port including replacement of the existing berths and wharf along with the loading facility at Blaketown Lagoon, purchase of depth sounding equipment, upgrade of Richmond Wharf, rail strengthening and improvements, upgrade of Richmond Quay including the port electrical reticulation system, and flood wall relocation in partnership with Westland Mineral Sands.
$2,297,000
approved
Augmentation of Facilities at Awarua Satellite Ground Station
Space Operations New Zealand LimitedTo establish a purpose-built headquarters for SpaceOps NZ to accommodate staff, electronics and computer hardware, and customers' equipment and personnel at Awarua Satellite Ground Station.
$2,250,000
approved
Ocean Beach - Aquaculture Centre of Excellence
Bluff LimitedTo improve infrastructure capacity at Ocean Beach supporting several commercial aquaculture companies, including increased tank capacity for seawater storage, improvement of biosecurity facilities, upgrading electrical capacity, improvement of roading infrastructure, landscaping and fencing.
$2,200,000
approved
GWRC - Site 15 - Upper Buffer Establishment
Wellington Regional CouncilTo fence each site and plant native and exotic fauna at the river edge and complete maintenance of fenced and planted areas.
$2,160,000
approved
$113,400 paid
0GWRC - Site 2 - River Road, Masterton, Stage 3, Ruamāhanga Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Ruamāhanga Awa, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$2,110,000
approved
$2,004,500 paid
Environment Canterbury - Ashburton River / Hakatere Flood Resilience Infrastructure Upgrades
Environment CanterburyTechnical investigations and design to upgrade flood protection infrastructure around Ashburton. This encompasses surveying and geotechnical work to inform construction of stopbanks and protective works for roads, schools, and medical facilities.
$2,100,000
approved
Environment Canterbury - Waimakariri River Flood Resilience Infrastructure Upgrades
Environment CanterburyStopbank construction and infrastructure protection around Kaiapoi, supported with technical investigations and design. The scope includes rail and school infrastructure and coordination with municipal services.
$2,100,000
approved
Northland Energy Bridge Investigations
Ministry of Business, Innovation & Employment (Kānoa - RDU)To upgrade the transmission and distribution electricity network in Northland to improve energy resilience for Northland, Auckland and beyond.
$2,000,000
approved
$158,280 paid
Bay of Plenty Regional Council - Ohineangaanga Stream Erosion Protection Works
Bay of Plenty Regional CouncilReinforcing stream banks in Te Puke through stopbank upgrades, using rock and sheet pile materials. The works are designed to stabilise erosion-prone areas.
$1,980,000
approved
Environment Canterbury - Rangitata Flood and Resilience #2
Environment CanterburyTo increase flood resilience in Rangitata including investigations, land purchasing, stopbanks, rock, planting, wetlands, diversions and river works.
$1,800,000
approved
$108,459 paid
0Nelson City Council - Jenkins Creek Flood Resilience Improvements
Nelson City CouncilThe project aims to upgrade stopbanks and associated flood resilience infrastructure around Jenkins Creek to increase protection to commercial/industrial assets, state highway and local roading networks, Nelson Airport, and municipal infrastructure.
$1,800,000
approved
Waikato Regional Council - Coromandel Peninsula Flood Resilience Infrastructure Upgrades
Waikato Regional CouncilErosion control and streambank stabilisation across multiple sites. Activities include installing rock spalls, riprap, steel piping, and geotextiles, removing storm debris and blockages, and implementing fencing and planting to protect completed works.
$1,680,000
approved
Waikato Regional Council - Island Block Pump Station
Waikato Regional CouncilTo upgrade flood pump capacity with the replacement of two 1960s flood pumps with one Archimedes screw pump, meeting climate change mitigation needs and providing fish passage.
$1,680,000
approved
2 jobs
Northland Regional Council - Lower Whangatane Spillway Stopbank Setback
Northland Regional CouncilThe project aims to reposition the Lower Whangatane Spillway stopbank at the Quarry Road Bridge area near Kaitāia to increase capacity of flood spillway.
$1,501,200
approved
Environment Canterbury - Ashley River / Rakahuri Flood Resilience Infrastructure Upgrades
Environment CanterburyDetailed surveying and geotechnical analysis to support the construction of stopbanks and flood infrastructure around Rangiora and Kaiapoi. The technical works also include design services and stakeholder coordination to ensure protection of energy assets, marae, and retirement facilities.
$1,500,000
approved
Environment Canterbury - Structure Upgrades / Adaptation Works
Environment CanterburyTo upgrade and adapt critical and aged flood protection infrastructure including investigations, monitoring, capital upgrades and fish passage enhancements across Kaiapoi, Ashley/Rakahuri, Waimakariri, Ashburton, Orari, Saltwater creek, and Waimate.
$1,500,000
approved
$409,712 paid
7 jobs
GWRC - Site 1 - River Road, Masterton Stage 2, Ruamāhanga Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Ruamāhanga Awa, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$1,480,000
approved
$1,406,000 paid
GWRC - Waiōhine - Site 5 - Fullers Bend, Waiōhine Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Waiōhine Awa at Fullers Bend, providing erosion migration, minimising avulsion risk, and increasing resilience in line with the recommendations of the Waiōhine Rakahanga River Plan.
$1,390,000
approved
$347,500 paid
0Bay of Plenty Regional Council - Ōpōtiki Township Stopbank Flood Resilience Improvements
Bay of Plenty Regional CouncilDesign and construction of upgrades stopbanks, including geotechnical investigations, procurement of construction materials, and civil engineering activities to build protection infrastructure
$1,380,000
approved
Waimamaku Community Solar
Wekaweka Valley Community TrustTo enable Māori economic resilience development in Waimamaku, Te Tai Tokerau by constructing and installing solar power and batteries to Waimamaku – Te Whakamaharatanga Marae, Waimamaku Resource Centre, Waimamaku Bar and Grill, Four Square and GAS Petrol Station, providing consistent and reliable power
$1,348,000
approved
$1,100,000 paid
0Bay of Plenty Regional Council - Waioeka Otara Rivers Scheme Stopbank Upgrades
Bay of Plenty Regional CouncilTo upgrade existing stopbanks and floodwalls of the rivers to meet one in a hundred year levels of flood protection and provide mitigation for climate change.
$1,200,000
approved
$230,466 paid
2 jobs
Waikato Regional Council - Lower Waikato Floodgate Programme
Waikato Regional CouncilTo upgrade assets east of Huntly in the Mangawara catchment, providing ongoing critical flood defences in the area, making them safer to operate in times of flood, and enabling the removal of floodwater from behind the stopbanks.
$1,200,000
approved
$477,348 paid
0Otago Regional Council - Puerua Outfall Structure Upgrades
Otago Regional CouncilTwo-stage upgrade involving culvert installation and training line strengthening on the Lower Clutha, increasing levels of protection to Balclutha and Kaitangata
$1,200,000
approved
Waikato Regional Council - Thames Valley Diversion Channel Upgrade
Waikato Regional CouncilTo fence, shape, and plant drainage channels to address the significant bank erosion and slumping of drains following the 2022/23 floods and heavy rainfall, ensuring effective operation of the land drainage network to clear surface water, reducing potential damage to pasture and crops, and reducing the overall sediment release into the Piako and Waihou river systems.
$1,080,000
approved
$171,041 paid
0Environment Canterbury - Orari River Flood Resilience Infrastructure Upgrades
Environment CanterburyTechnical design and geotechnical work to enable construction of stopbanks and protective infrastructure across Geraldine, Temuka, Pleasant Point, and Levels Plains. The works also involve bridge protection.
$1,050,000
approved
GWRC - Site 10 - Tawaha Sill, Ruamāhanga Awa
Wellington Regional CouncilTo upgrade the current sill at the Tawaha Floodway which crosses State Highway 53 at Jenkins Dip, which currently does not provide a consistent spill from the river in flood conditions.
$1,020,000
approved
$51,000 paid
2 jobs
Otago Regional Council - East Taieri Lower Pond Structure Upgrades
Otago Regional CouncilDesign and construction of upgraded stopbanks and flood infrastructure to improve protection for the Lower Taieri flood scheme. Works include earthworks and concrete structures.
$1,020,000
approved
Otago Regional Council - Riverbank Rd Flood Risk Mitigation
Otago Regional CouncilSediment removal and bank repairs to improve flow capacity of the Clutha River (Matau branch), including fencing and earthworks.
$960,000
approved
GWRC - Waingawa - Site 8 - Waingawa River Hood Aerodrome
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Waingawa Awa, protecting the southern end of the Hood Aerodrome runway.
$950,000
approved
$142,500 paid
Tasman District Council - Peach Island Stopbank Repair
Tasman District CouncilTo repair vulnerable sections of stopbanks protecting Peach Island along the Motueka River and complete upgrade work necessary to safely maintain these stopbanks on an ongoing basis, protecting approximately 170 hectares of fertile and productive land, and approximately 15 homes and ancillary structures.
$900,000
approved
$28,398 paid
0Environment Canterbury - Kaikōura Flood Resilience Infrastructure Upgrades
Environment CanterburyBerm strengthening supported by surveying and geotechnical investigations. Design work underpins infrastructure upgrades for rail, bridges, and schools in the Kaikōura area
$900,000
approved
GWRC - Waipōua - Site 4 - Waipōua Industrial Site - Akura Road, Waipōua Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Waipōua Awa, providing erosion migration at the approach to the State Highway 2 Bridge and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$880,000
approved
$836,000 paid
GWRC - Whakawhiriwhiri - Site 16 - Whakawhiriwhiri Stream - project re-scope, Whakawhiriwhiri Awa
Wellington Regional CouncilTo widen scope of planned resilience works addressing the low capacity of the stream to convey the ponded water, causing flooding to surrounding landowners.
$860,000
approved
$43,000 paid
0Environment Canterbury - Ōpihi River Flood Resilience Infrastructure Upgrades
Environment CanterburyTechnical surveying and geotechnical investigations to guide the construction of stopbanks and flood protection measures near Fairlie. Design work supports infrastructure upgrades near roads, schools, and municipal assets.
$750,000
approved
Otago Regional Council - Puerua Flood Protection Strengthening
Otago Regional CouncilUpgrade and repair stopbanks and associated flood resilience infrastructure around the Paretai area between the Clutha River Koau Branch and the Puerua River.
$600,000
approved
Environment Canterbury - Pareora River Flood Resilience Infrastructure Upgrades
Environment CanterburySurveying, geotechnical analysis, and design to support rural flood protection works, including stopbank upgrades and safeguarding of agricultural land and road networks in the Pareora area.
$600,000
approved
GWRC - Waingawa - Site 7 - Masterton Raw Water Supply, Waingawa Awa
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Waingawa Awa, protecting a water supply, controlling erosion, and increasing resilience in line with the recommendations of the Upper Waingawa Awa portion of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$570,000
approved
$142,500 paid
0GWRC - Site 11 - Pukio East Stopbank
Wellington Regional CouncilTo remove the redundant stopbank, allowing the river more room which will reduce flooding.
$540,000
approved
$513,000 paid
GWRC - Site 6 - Awaroa Sill, Ruamāhanga Awa
Wellington Regional CouncilTo construct erosion protection along the True Right Bank of the Ruamāhanga Awa, including retreating the spillway sill and fences to limit further lateral movement of the active channel, limiting erosion, decreasing flood risk, and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$530,000
approved
$51,000 paid
0GWRC - Waingawa - Site 13 - South Masterton Stopbank, Waingawa Awa
Wellington Regional CouncilTo augment and reline the riverside face of the existing stopbank structure along the True Left Bank of the Waingawa Awa, reducing the flood risk to the southern section of Masterton in line with the recommendations of the Waingawa Awa portion of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$520,000
approved
$26,000 paid
0Operations Depot Resilience Infrastructure
Quality Roading and Services LimitedTo construct a flood wall and earth bund around the operations hub and depot; also connect generator to the transformer to ensure self-sufficiency.
$500,000
approved
1 jobs
Otago Regional Council - Silver Stream Capacity Improvements
Otago Regional CouncilUpgrade stopbanks and associated earthworks for the Silver Stream, increasing the levels of protection to Mosgiel and East Taieri.
$480,000
approved
Otago Regional Council - Kaitangata Floodbank Reconstruction
Otago Regional CouncilUpgrade and reconstruct stopbank infrastructure, providing increased levels of protection to Kaitangata.
$420,000
approved
Northland Regional Council - Quarry Road - Phase 2
Northland Regional CouncilTo reinstate the bridge and strengthen stopbanks either side.
$360,000
approved
$360,000 paid
Waikato Regional Council - Mangatawhiri Pumpstation Infrastructure
Waikato Regional CouncilTo replace dual inlet at the pump station and the construction of an isolation gate enabling access to the pump for maintenance, including a platform, inlet and screen replacements.
$324,000
approved
$154,654 paid
0Environment Southland - Te Anau Basin Catchment Flood Management Upgrade
Southland Regional CouncilTo improve the resilience of the current assets, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.
$300,000
approved
$131,094 paid
0Environment Southland - Aparima Catchment Flood Protection Upgrade
Southland Regional CouncilTo improve resilience of the current assets protecting the Otautau community, returning to design standard, improving the flood plain capacity and hydraulic efficiency of the river system.
$300,000
approved
$300,000 paid
Northland Regional Council - Quarry Road - Phase 1
Northland Regional CouncilTo protect Quarry Road bridge from flood waters eroding the deflection bank and structural support of the bridge.
$300,000
approved
$300,000 paid
GWRC - Site 14 - Homebush Wastewater Treatment Plant Resilience works
Wellington Regional CouncilTo lift the headwork above flood levels protecting the function of the wastewater treatment plant.
$270,000
approved
$27,000 paid
0GWRC - Fish Passages - Site 12 - Fish Passage upgrades
Wellington Regional CouncilTo enhance fish passage by developing and rehabilitating structures that are crucial for flood protection, including adapting grade control structures, installing fish-friendly flap gates, replacing existing infrastructure with fish-friendly alternatives, and improving overall flood resilience.
$220,000
approved
$55,000 paid
0GWRC - Waipōua - Site 3 - Waipōua SH2 bridge Left bank protection, Waipōua Awa
Wellington Regional CouncilTo construct erosion protection along the True Left Bank of the Waipōua Awa, providing erosion migration at the approach to the State Highway 2 Bridge and increasing resilience in line with the recommendations of the Te Kāuru Upper Ruamāhanga Floodplain Management Plan.
$80,000
approved
$76,000 paid